Salt River Project Agriculture Improvement & Power District (dba SRP)

0671-EX-ST-2021

Status: Pending

N/A
2021-04-28

Documents and Communications: [refresh]

DescriptionCategoryDate
Govt Entity Explanation for fee exemption waiverText Documents2021-04-28
E-Mail generated [Apr 29 2021]Correspondence2021-04-29
Incoming generated [May 5 2021]Correspondence2021-05-05
Dismissal Without Prejudice generated [May 5 2021]Correspondence2021-05-05
Dismiss E-mail Notification generated [May 5 2021]Correspondence2021-05-05
E-Mail generated [Apr 29 2021]Correspondence2021-04-29
Incoming generated [May 5 2021]Correspondence2021-05-05
Dismissal Without Prejudice generated [May 5 2021]Correspondence2021-05-05
Dismiss E-mail Notification generated [May 5 2021]Correspondence2021-05-05
Govt Entity Explanation for fee exemption waiverText Documents2021-04-28
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Salt River Project Agriculture Improvement & Power District (dba SRP)

Address
Attention: Angel Parra
Street Address: M/S: PBF200
P.O. Box: 52025
City: Phoenix
State: AZ
Zip Code: 85072-2025
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Parra
First Name: Angel
Title: Senior Engineer
Phone Number: 602-236-8924

Explanation
Please explain in the area below why an STA is necessary:
This STA is necessary for trialing new equipment, before going through FCC approval, that is designed to provide Mission Critical Communications for Salt River Projects (SRP) Field Area Network. This new technology has been custom designed to meet the exact needs of SRP. SRP has purchased 700 MHz Upper A Block Spectrum and requests to be able to temporarily assess and test this new equipment.

Purpose of Operation
Please explain the purpose of operation:  To allow our endpoint transmitting device enough power to cut through the Verizon and AT&T out of band emissions.

Information
Callsign:
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 05/14/2021
Operation End Date: 11/10/2021

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Mimomax MWL-PYXISBOOSTE 1 Yes
Mimomax MWL-PYXISBOOSTE 1 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Angel Parra
Title of Applicant (if any): Senior Engineer
Date: 2021-04-28 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Chandler Arizona North  33  18  14 West  111  54  7 1.60
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft: Right next to a mall which is south and east of the location. Large building across a drive way to the north 4 story hotel to the west across the street. Several trees taller than 6 feet next to the location directly to the south.
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 757.00000000-758.00000000 MHz MO 10.000000 W 10.000000 W M 0.00010000 % 20K0W1W 4GFSK, dev6.695KHz, BT0.5
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 757.00000000-758.00000000 MHz MO 10.000000 W 10.000000 W M 0.00010000 % 40K0W1W 4GFSK, dev14.38KHz, BT0.5

City State Latitude Longitude Mobile Radius of Operation
Chandler Arizona North  33  18  47 West  111  53  16 1.60
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 757.00000000-758.00000000 MHz MO 10.000000 W 10.000000 W M 0.00010000 % 20K0W1W 4GFSK, dev6.695KHz, BT0.5
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 757.00000000-758.00000000 MHz MO 10.000000 W 10.000000 W M 0.00010000 % 40K0W1W 4GFSK, dev14.38KHz, BT0.5

23183