                             Request for Special Temporary Authority

         Pursuant to Section 5.61 of the Commission’s rules, 47 C.F.R. § 5.61, SES
Americom (“SES”) requests an experimental special temporary authorization (“STA”)
solely to conduct in-orbit and end-to-end testing of the ICO Global Communications
(Holdings) Limited (together with its subsidiaries, “ICO”) medium-earth-orbit (“MEO”)
mobile satellite service (“MSS”) system for a period of five months. The testing will
occur using two earth station antennas licensed to SES that were previously authorized to
perform testing with the ICO system, E990067 (primary) and E990068 (back-up). The
experimental authorization will permit the resumption of testing using the ICO F-2
satellite, in order to facilitate future efforts to launch and operate a larger MEO
constellation for service outside the United States.

I.         Background

        SES holds conditional authorizations for five transmit/receive earth stations
located at Brewster, Washington to provide tracking, telemetry and command (“TT&C”)
communications for the ICO medium-earth-orbit (“MEO”) mobile satellite service
(“MSS”) system.1 The stations are authorized to use the 5150-5250 MHz (uplink)
frequencies and 6975-7075 MHz (downlink) frequencies for TT&C communications not
related to commercial operations.

         The ICO MEO constellation of 12 satellites is authorized by the United Kingdom.
In 2001, the Commission granted ICO a “letter of intent” authorization to provide MSS in
the 2 GHz band using its MEO satellite system.2 The first satellite in the constellation, F-
1, was launched in March 2000 but was destroyed in a launch vehicle failure. A second
satellite, F-2, was launched on June 19, 2001, and successfully placed into orbit. In 2005,
the Commission granted ICO’s request to modify this authorization to substitute a
geostationary satellite for provision of MSS to the United States, so that ICO will not
provide MSS to the United States using its MEO system, including its F-2 satellite.3 The
ICO MEO system, however, remains authorized under U.K. regulations and is fully
coordinated with U.S.-licensed satellites.

     1
       SES holds the five earth station authorizations pursuant to a series of assignment authorizations. The
original licensee, U.S. Electrodynamics, Inc. (“USEI”), was granted conditional authorizations in 1999 and
2000 to use 11 MHz of spectrum in the 5 GHz and 7 GHz band for TT&C communications not related to
commercial operations. See U.S. Electrodynamics, Inc.,14 FCC Rcd 9809 (IB, 1999) (“Initial TT&C
Order”); U.S. Electrodynamics, Inc.,15 FCC Rcd 8610 (IB/OET 2000) (“Modification Order”). In 2000,
the Commission approved the assignment of USEI earth station authorizations to ATC Teleports, Inc.,
including the five Brewster authorizations. See FCC Public Notice, Satellite Communications Services
Information; Re: Actions Taken, Report No. SES-00173 (Apr. 12, 2000). ATC Teleports, Inc. later
changed its name to Verestar, Inc. In 2005, the Commission granted Verestar, Inc.’s applications to assign
the five earth station authorizations to SES. See Applications of Verestar, Inc. (Debtor-In-Possession) for
Consent to Assignment of Licenses to SES Americom, Inc., 19 FCC Rcd 22750 (IB/WTB 2005).
     2
         See ICO Services Limited, 16 FCC Rcd 13762 (IB/OET 2001) (“ICO Authorization Order”).
     3
         See ICO Satellite Service, G.P., 20 FCC Rcd 9797 (IB 2005).



dc-463737


                                                                                              Attachment A
                                                                                                Page 2 of 5

       SES’s predecessor-in-interest was previously authorized to conduct in-orbit and
end-to-end testing at the Brewster, Washington earth station. Specifically, in May 2001,
the Commission granted a 60-day special temporary authorization (“STA”) to operate the
Brewster, Washington earth stations in support of initial equipment and in-orbit tests of
the ICO F-2 satellite, which was launched on June 19, 2001. 4 On July 18, 2001, the
Commission extended its May 2001 STA grant for an additional 120 days, through
November 9, 2001.5 The Brewster facility continues to serve as an ICO satellite access
node (“SAN”) (i.e., gateway earth station) for TT&C purposes, pursuant to FCC
conditional authorizations. These present and past uses of the Brewster facility for ICO
operations make it the most appropriate facility for conducting the proposed tests.

II.          Experimental STA Request (Proposed Time and Dates)

         SES now requests an experimental STA to resume and complete the testing of the
ICO F-2 satellite begun in 2001 from the Brewster, Washington earth station facilities.
Specifically, SES seeks to (1) re-validate in-orbit testing performed when the ICO F-2
satellite was launched, and (2) perform tests planned but not completed following the
ICO F-2 launch. In-orbit testing from Brewster is presently scheduled to begin
November 10, 2006, subject to Commission approval. SES also seeks to conduct end-to-
end testing from Brewster for a period of five months beginning on November 24, 2006.

III.         Description and Purpose of Proposed STA Operation

             A.       In-Orbit Testing

        The overall purpose of the experiment is to ascertain the proper function of the
forward-link (5 GHz uplink to satellite and 2 GHz downlink to earth station) and the
return-link (2 GHz uplink to satellite and 7 GHz downlink to earth station) through all
available 2 GHz spot-beams. The planned in-orbit payload testing is intended to verify
the performance of the satellite payload, including 2 GHz repeaters and the related
antenna subsystem.6



       4
      See Verestar, Inc., 16 FCC Rcd 9575, ¶ 1 (IB 2001). The order described the tests as follows: (1)
verification and calibration of test equipment and earth station radio frequency (“RF”) equipment from
approximately May 6, 2001, until launch date; (2) in-orbit testing of the ICO F-2 satellite immediately
following its launch, scheduled for June 6, 2001, until approximately September 6, 2001; (3) in-orbit
testing from approximately mid-September 2001 until May 6, 2002; and finally (4) end-to-end testing for
every ICO satellite following the completion of each in orbit test to begin approximately on December 31,
2001 until May 6, 2002.
       5
           See Verestar, Inc., 16 FCC Rcd 13833, ¶ 1 (IB, OET & WTB 2001).
       6
      These tests include, for example, measurement of C-band (7 GHz down-link) satellite EIRP as a
function of saturation flux density at the satellite service link receiver (2 GHz uplink), payload gain
transfer, effective satellite spot beam antenna patterns and satellite C-band cross-polarization isolation (the
feeder link transponder operates with dual polarization).



dc-463737


                                                                                 Attachment A
                                                                                   Page 3 of 5

        In order to perform in-orbit testing, SES Americom must transmit multiple test
carriers at frequencies in the 5 GHz feeder uplink band between 5186–5212 MHz and
receive a similar set of test carriers in the 7 GHz feeder downlink band between 7017–
7043 MHz. The ICO SAN at Brewster is equipped with 2 GHz transmit/receive test feed
horns. The proposed tests will involve transmit and receive signals from and to the
Brewster SAN in a portion of the 2 GHz MSS bands (i.e., 2000-2015 MHz and 2180-
2200 MHz). Accordingly, there is a need for temporary access to the 5 GHz, 7 GHz and
2 GHz spectrum for in-orbit testing purposes.

        B.      End-to-End Testing

        End-to-end testing will allow a full assessment of the end-to-end performance of
the ICO MEO system. In this case, the Brewster SAN will use both 5/7 GHz and 2 GHz
carriers on a “loop-back” basis at the Brewster station. This end-to-end testing will
emulate the carrier of the user terminal link’s (i.e., the mobile earth station) send/receive
capabilities in order to validate the complete service link and feeder link radio paths of
connectivity that would normally take place between the user terminal handsets and the
ICO SAN.

IV.     Need for Testing; Non-commercial Use; Limited Test Period

        The sole purpose of this experimental STA application is to test and integrate
relevant components of the ICO MEO system. The tests will resume and complete
validation and end-to-end testing of spacecraft hardware and payload operations, and will
assist ICO in developing ICO user terminals that are interoperable with its North America
and global MSS systems. Successful completion of the testing phase will facilitate future
launch and operation outside of the United States of the larger MEO constellation, as
authorized by the United Kingdom.

         These tests will not permit the use of 2 GHz MSS frequencies to provide
commercial MSS to the public, and are not intended to facilitate commercial use of the
MEO system to provide MSS to the United States. ICO does not intend to use the
Brewster earth station for any permanent MSS or feeder link operations. The Brewster
facility, however, can be more rapidly provisioned for the proposed tests than other
potential test sites, and it is the facility most readily accessible to the various personnel
involved in conducting the tests.

        The proposed testing is scheduled for a five-month period, from November 10,
2006, to April 21, 2007, subject to Commission approval. Testing must be completed no
later than April 2007 to avoid any possible overlap with other authorized uses of 2 GHz
MSS frequencies, which are scheduled to commence in the latter half of 2007.




dc-463737


                                                                                         Attachment A
                                                                                           Page 4 of 5

V.       Demonstration of Compliance with Regulatory Requirements

         A.      Conditions under Brewster Earth Station Authorizations

       The Commission imposed several conditions in its conditional authorizations for
the Brewster earth stations.7 SES affirms that it will continue to comply with these
conditions in conducting the proposed tests. Specifically, SES agrees as follows:

         (1)  Its operations will not cause harmful interference to authorized
         communications services.

         (2)     Upon validated notification of harmful interference caused to authorized
         radio-communications services, SES immediately will cease such operations or
         adjust such operations to avoid such harmful interference.

         (3)     The Brewster SAN 5/7 GHz TT&C and other 5/7 GHz operations will not
         cause unacceptable interference to relevant Globalstar operations. A statement
         signed by ICO and Globalstar, attached as Exhibit 1, affirms that their interim
         coordination agreement remains in force, and that Globalstar has no objection to
         the use of frequencies for testing as described in this application.

         (4)     The Brewster SAN 5 GHz operations will not cause harmful interference
         to the existing or planned Federal Aviation Administration (“FAA”) Microwave
         Landing Service (“MLS”) operations. In a letter attached as Exhibit 2, the FAA
         recently affirmed its previous conclusion that it has no objection to the Brewster
         earth station operations in support of the ICO MEO system.8

         B.      Frequency Coordination

       Attached as Exhibit 3 is a study performed by Comsearch, a frequency
coordination contractor, demonstrating that 2 and 5 GHz transmit operations at Brewster

     7
          See Initial TT&C Order, 14 FCC Rcd at 9817-18, and Modification Order, 15 FCC Rcd at 8613-
14. The Commission’s conditions were imposed prior to, but in anticipation of, the adoption by the
Commission of new policies and rules regarding the authorization of MSS systems in the U.S., and the
utilization of the 2 GHz spectrum for MSS operators. See Establishment of Policies and Service Rules of
the Mobile Satellite Service in the 2 GHz Band, Report and Order, 15 FCC Rcd 16127 (2000)(“2 GHz MSS
Order”). See also Amendment of Section 2.106 of the Commission’s Rules to Allocate Spectrum at 2 GHz
for Use by the Mobile-Satellite Service, Second Report and Order and Second Memorandum Opinion and
Order, 15 FCC Rcd 12315 (2000). The Commission ultimately allocated the 5091-5250 MHz band for
feeder uplinks and the 6700-7025 MHz band for feeder downlinks in the FSS to support Big LEO and 2
GHz MSS systems. See Amendment of Parts 2, 25 and 97 of the Commission's Rules with Regard to the
Mobile-Satellite Service Above 1 GHz, Report and Order, 17 FCC Rcd 2658 (2002) (“MSS Report and
Order”). The allocation order also grandfathered two existing Globalstar gateway earth station sites, and
one existing ICO gateway earth station site, that use some or all of the 7025-7075 MHz downlink band. Id.
at 2675-76.
     8
     See Letter from Michael Richmond, FAA, to Karl Nebbia, Chairman, Interdepartment Radio
Advisory Committee, NTIA (Aug. 23, 2006).



dc-463737


                                                                                   Attachment A
                                                                                     Page 5 of 5

will not cause harmful interference to authorized radio communications services in the
vicinity of Brewster, including broadcasting services. Finally, the only other party
authorized to use 2 GHz MSS frequencies to provide MSS in the United States, TMI
Communications and Company, Limited Partnership, is not scheduled to launch its
satellite until November 2007.9




   9
       See TMI Communications and Company, Limited Partnership, 19 FCC Rcd 12603, 12623 (2004).



dc-463737



Document Created: 2006-10-24 17:11:34
Document Modified: 2006-10-24 17:11:34

© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC