Raytheon Integrated Defense Systems

0826-EX-ST-2013

Status: Grant Expired Due to New License

WH9XBP
2013-11-08

Documents and Communications: [refresh]

DescriptionCategoryDate
Grant E-mail Notification generated [Nov 9 2013]Correspondence2013-11-09
FAA CoordinationText Documents2013-10-22
Additional InformationText Documents2013-10-25
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Raytheon Integrated Defense Systems

Address
Attention: John F. Adams
Street Address: 2620 Flagstone Court
P.O. Box:
City: Shelby
State: NC
Zip Code: 28152
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Adams
First Name: John
Title: Program Spectrum Manager
Phone Number: 8033180021

Explanation
Please explain in the area below why an STA is necessary:
The Low Power Radar (LPR) is planned to be operated at the Raytheon Facilities in Dallas and Garland, TX over the period of September 10, 2013 – Feburary 10, 2014. The purpose of this request for Special Temporary Authorization is to demonstrate the maturity of our system concept and technology to the customer.

Purpose of Operation
Please explain the purpose of operation:  Radar demonstration. Frequency authorization is being requested for the period of September 10, 2013 – Feburary 10, 2014 in the 9.15 GHz band in order to demonstrate the operation of a prototype radar system. This radar demonstration is intended to show maturity of key technologies designed and developed by Raytheon. It is essential that radar performance be demonstrated in a real-time radar environment similar to the proposed radar system. Testing in real-time environments with realistic target profiles is needed to fully prepare for a demonstration to the customer.

Information
Callsign: WH9XBP
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 11/08/2013
Operation End Date: 05/08/2014

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Raytheon LPR 9.15 2 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): John F. Adams
Title of Applicant (if any): Program Spectrum Manager
Date: 2013-08-28 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
McKinney Texas North  33  12  43 West  96  39  26 20.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9148.50000000-9151.25000000 MHz FX 125.000000 W 492.000000 kW P 4M70Q3N
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9148.50000000-9151.25000000 MHz FX 125.000000 W 492.000000 kW P 7M10Q3N

City State Latitude Longitude Mobile Radius of Operation
Garland Texas North  32  53  59 West  96  40  45 20.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9148.50000000-9151.25000000 MHz FX 125.000000 W 492.000000 kW P 4M70Q3N
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9148.50000000-9151.25000000 MHz FX 125.000000 W 492.000000 kW P 7M10Q3N

22779

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC