Status: Denied/Dismissed

WH9XBP
2014-05-07

Documents and Communications: [refresh]

DescriptionCategoryDate
E-Mail generated [Mar 19 2014]Correspondence2014-03-19
Dismissal Without Prejudice generated [May 7 2014]Correspondence2014-05-08
For Dallesport WAText Documents2014-03-05
FAACoordination and Mission DescriptText Documents2014-03-05
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Raytheon Integrated Defense Systems

Address
Attention: John F. Adams
Street Address: 2620 Flagstone Court
P.O. Box:
City: Shelby
State: NC
Zip Code: 28152
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Adams
First Name: John
Title: Program Spectrum Manager
Phone Number: 8033180021

Explanation
Please explain in the area below why an STA is necessary:
The Low Power Radar (LPR) is planned to be operated at the Raytheon Facilities in Dalles, WA over the period of March 24, 2014 – September 24, 2014. The purpose of this request for Special Temporary Authorization is to demonstrate the maturity of our system concept and technology to the customer.

Purpose of Operation
Please explain the purpose of operation:  FAA Frequency Coordination was made with Daniel ORear; ATO Western Service Area 9148.5 MHZ NG T140139 9151.25 MHZ NG T140140 Radar Demonstration. Frequency authorization is being requested for the period of March 24, 2014 – September 24, 2014 in the 9.15 GHz band in order to demonstrate the operation of a prototype radar system. This radar demonstration is intended to show maturity of key technologies designed and developed by Raytheon. It is essential that radar performance be demonstrated in a real-time radar environment similar to the proposed radar system. Testing in real-time environments with realistic target profiles is needed to fully prepare for a demonstration to the customer.

Information
Callsign: WH9XBP
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 03/24/2013
Operation End Date: 09/24/2014

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Raytheon LPR 9.15 2 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): John F. Adams
Title of Applicant (if any): IDS Program Spectrum Manager
Date: 2014-03-05 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Dalles Washington North  45  37  6 West  121  10  0 20.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9148.50000000- MHz FX 114.000000 W 775.000000 kW P 4M70Q1N
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 9151.25000000- MHz FX 114.000000 W 775.000000 kW P 7M10Q1N

16396