Please explain the purpose of operation: |
Radar development testing.
Frequency authorization is being requested for the period of November 20, 2015-May 13, 2016 in X-band at frequencies between 9.55 - 9.65 GHz, in order to test prototype radar arrays in a relevant environment. Outdoor testing, across multiple frequencies as noted above is required to assess hardware compliance with requirements and to continue research and development. Only one unit will be tested at a time.
Technical Synopsis:
Spectrum needed: 9.55 - 9.65 GHz. Power levels requested: 160 W output power, 953.4 kW ERP (peak)
. Location of use: NTIA-ITS Table Mountain Antenna Fields Site in Boulder, Co and Raytheon Test Facility in Sudbury, MA
. Direction of radiation: South East with +/- 45 degree scan angle with ability to adjust mechanically about boresite pointing angle +/- 30 degs). Stop buzzer contact: Robert Palumbo, 978-376-7321 |