Raytheon IDS

0314-EX-ST-2014

Status: Grant Expired Due to New License

WH9XLL
2014-05-14

Documents and Communications: [refresh]

DescriptionCategoryDate
Grant E-mail Notification generated [May 15 2014]Correspondence2014-05-15
Developmental Test SummaryText Documents2014-04-14
Grant E-mail Notification generated [May 15 2014]Correspondence2014-05-15
Developmental Test SummaryText Documents2014-04-14
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Raytheon IDS

Address
Attention: Karen Dyberg
Street Address: 528 Boston Post Road
P.O. Box:
City: Sudbury
State: MA
Zip Code: 01776
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Dyberg
First Name: Karen
Title: Spectrum Mgt and RF Safety
Phone Number: 978-440-4022

Explanation
Please explain in the area below why an STA is necessary:
The demonstration will be conducted at the Raytheon Test Facility in Marlboro, MA over the period of May 12 to November 10, 2014.

Purpose of Operation
Please explain the purpose of operation:  For developmental testing of a line-of-sight communication system. Frequency authorization for 14.4 -14.83 GHz (Ku Band) is being requested for the period of May 12 to November 10, 2014. Frequency authorization is required for developmental testing of a line-of-sight communications system.

Information
Callsign: WH9XLL
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 05/14/2014
Operation End Date: 11/10/2014

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
L3 Comm West Mini-CDL-200 4 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Karen Dyberg
Title of Applicant (if any): Spectrum Mgt and RF Safety
Date: 2014-04-14 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Marlborough Massachusetts North  42  20  34 West  71  29  34
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   Yes
(a) Width of beam in degrees at the half-power point:   16.50
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:   30.00
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   Yes
(a) Overall height above ground to tip of antenna in meters:   9.10
(b) Elevation of ground at antenna site above mean sea level in meters:   80.00
(c) Distance to nearest aircraft landing area in kilometers:   1.30
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft: The antenna structure will be located next to a 3 story Raytheon building about 11 meters tall. See exhibit for more details.
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 14.40000000-14.60000000 GHz FX 2.500000 W 152.000000 W P 15M0G1D O-QPSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 14.40000000-14.60000000 GHz FX 2.500000 W 152.000000 W P 30M0G1D O-QPSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 14.40000000-14.60000000 GHz FX 2.500000 W 152.000000 W P 63M0G1D O-QPSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 14.61000000-14.83000000 GHz FX 2.500000 W 152.000000 W P 15M0G1D O-QPSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 14.61000000-14.83000000 GHz FX 2.500000 W 152.000000 W P 30M0G1D O-QPSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 14.61000000-14.83000000 GHz FX 2.500000 W 152.000000 W P 63M0G1D O-QPSK

22129

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC