Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Raytheon IDS

Address
Attention: Karen Dyberg
Street Address: 528 Boston Post Road, Mail Stop 4-2-154
P.O. Box:
City: Sudbury
State: MA
Zip Code: 01776
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Dyberg
First Name: Karen
Title: Spectrum Management/RF Safety
Phone Number: 978-440-4022

Explanation
Please explain in the area below why an STA is necessary:
The purpose of this request for Special Temporary Authorization is to perform preliminary calibration measurements of a prototype radar system. This effort is a precursor to a demonstration intended to show maturity of key technologies designed and developed by Raytheon. An application for licensing of the demonstration effort was submitted separately for a different Raytheon location.

Purpose of Operation
Please explain the purpose of operation:  To perform preliminary calibration measurements of a prototype radar system. Frequency authorization for 5.412, 5.442, and 5.472 GHz in the 5.4 to 5.5GHz band (C-Band) is being requested for the period of March 26 to August 20 2013. It will be used to perform preliminary calibration measurements of a prototype radar system.

Information
Callsign: WG9XKM
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 03/26/2013
Operation End Date: 08/20/2013

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Raytheon Prototype 1 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Karen I. Dyberg
Title of Applicant (if any): Spectrum Management/RF Safety
Date: 2013-03-04 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Sudbury Massachusetts North  42  21  57 West  71  25  56
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 5.41200000- GHz FX 260.000000 W 856.000000 W P 27M3Q1N Linear FM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 5.44200000- GHz FX 260.000000 W 856.000000 W P 27M3Q1N Linear FM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 5.47200000- GHz FX 260.000000 W 856.000000 W P 27M3Q1N Linear FM

City State Latitude Longitude Mobile Radius of Operation
Sudbury Massachusetts North  42  21  57 West  71  25  56
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:   19.20
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 5.41200000- GHz FX 260.000000 W 856.000000 W P 27M3Q1N Linear FM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 5.44200000- GHz FX 260.000000 W 856.000000 W P 27M3Q1N Linear FM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 5.47200000- GHz FX 260.000000 W 856.000000 W P 27M3Q1N Linear FM

25672