Redacted Narrative

0353-EX-CN-2018 Text Documents

PointView Tech LLC

2018-04-26ELS_208689

REDACTED FOR PUBLIC INSPECTION


                                      Before the
                       FEDERAL COMMUNICATIONS COMMISSION
                                Washington, D.C. 20554

                                                )
In the Matter of                                )
                                                )
PointView Tech LLC                              )   File No. 2018-EX-CN-______
                                                )
Application for Experimental Authority to       )
Launch and Operate a Low-Earth Orbit,           )
Non-Geostationary Orbit Satellite and           )
Communicate with Certain Earth Stations         )
                                                )


                                 APPLICATION NARRATIVE

          Pursuant to Sections 308 and 309 of the Communications Act of 1934, as amended,1 and

Part 5 of the Commission’s rules,2 PointView Tech LLC (“PointView”) files this application for

experimental authorization to launch and operate a single low-earth orbit (“LEO”), non-

geostationary orbit (“NGSO”) satellite (the “Athena” satellite). The satellite’s main

communications payload links will operate in the little-used E-band spectrum – 71-76 GHz for

the downlinks, 81-86 GHz for the uplinks.



                                PointView’s request for experimental authority also encompasses

two earth stations that will conduct E-band communications with the satellite. The mission will

be to determine whether such satellite communications can efficiently provide broadband access

to unserved and underserved areas throughout the world. The satellite’s narrowband Telemetry,

Tracking, and Command (“TT&C”) beams will operate in the S-band at 2082 MHz, using less

than 1.5 MHz occupied bandwidth, for the uplink, and in the X-band at 8496.25 MHz, using less
1
    47 U.S.C. §§ 309, 310.
2
    47 C.F.R. §§ 5.55, 5.63.


REDACTED FOR PUBLIC INSPECTION

than 2.3 MHz occupied bandwidth, for the downlink. PointView’s partners, Space Systems

Loral (“SSL”) and Atlas Space Operations (“Atlas”), will operate three earth stations for TT&C

communications subject to authority that has already been received or will soon be requested.

        This application provides an overview of the Athena experiment, including its objective

and operations; a description of the spacecraft; a summary of the ground operations, including

the TT&C functions; a discussion of the power levels, which are all within any and all limits

applicable to the frequency bands in question, as well as the steps taken to mitigate any risk of

harmful interference; and an explanation of why the experiment serves the public interest.

Specifically, the public interest rationale in support of the Athena experiment is strong –

PointView will examine the suitability of LEO satellites using millimeter wave frequencies

                         to provide broadband Internet access to unserved and underserved areas

across the globe. The application shows that the proposed experiment meets all applicable legal

and technical requirements. Finally, the application certifies that PointView will meet any

applicable international obligations related to the Athena satellite.

        Attached to this application are supporting exhibits providing the technical and

operational characteristics of the Athena satellite (“Technical Annex”), the orbital debris

mitigation plan, and radiation hazard studies for the E-band uplink earth stations.

I.      OVERVIEW OF THE ATHENA MISSION AND PROPOSED EXPERIMENT

        The Athena experiment will test, demonstrate, and validate new technologies that will

allow                                    E-band (71-76 GHz downlink and 81-86 GHz uplink)

communications between earth stations in the western United States and a non-geostationary

orbit (“NGSO”) satellite operating in the low-earth orbit.3 Its main purpose will be to determine




                                                  2


REDACTED FOR PUBLIC INSPECTION

whether such satellite communications can efficiently provide broadband access to unserved and

underserved areas throughout the world. The satellite is slated to be launched in early 2019. The

tests will run for approximately two years after the start of in-orbit operations, after which point

the satellite will be permanently switched off by irreversible ground command and naturally de-

orbit within the 25-year requirement.4

       A.      The Athena Spacecraft

         The Athena spacecraft is being designed and manufactured by Space Systems Loral,

LLC. Space Systems Loral has a contract for launch as a secondary payload on the Arianespace

Vega launcher, and is scheduled for launch in early 2019. It will operate in the low-earth orbit,

specifically at a sun-synchronous orbit between 500-550 km. Only one spacecraft will be used in

the demonstration. Its size will be approximately 0.33 cubic meters, its weight less than 150 kg.

                                                                  There will be no on-board

propulsion system for orbit change. The operational lifetime of spacecraft is currently planned to

be approximately two years.

       B.      Ground Operations

       The              E-band links will be used for payload communications. The E-band

downlink will generally be centered at 72 GHz and 75 GHz; the uplink will generally be centered




4
 See NASA, Process for Limiting Orbital Debris, NASA-STS-8719.14A (with Change 1) §
4.3.2, Requirement 4.3-1 at 21 (approved May 25, 2012).




                                                  3


REDACTED FOR PUBLIC INSPECTION

at 82 and 85 GHz.6 PointView will serve as the E-band                earth station operator. These

stations will be located in California, specifically in Los Angeles and Ventura counties.

       Atlas will serve as the TT&C earth station operator and will apply for the TT&C earth

station licenses. TT&C will be conducted in the S-band at 2082 MHz, using less than 1.5 MHz

occupied bandwidth, for the uplink, and in the X-band at 8496.25 MHz, using less than 2.3 MHz

occupied bandwidth, for the downlink. The TT&C earth stations will be located in Mojave,

California; Albuquerque, New Mexico; and Brewster, Washington.

       C.      Power Levels

       The power levels for the Athena experiment are within established limits for the proposed

bands.7 The maximum DC power dissipation level of the spacecraft is 1200 W. The X-band

TT&C radio consumes less than 50 W DC. The transmit power is 3.64 dBW EIRP with 2.3

MHz bandwidth. The maximum power flux density at the surface of the earth is -148.96

dBW/m²/4 kHz. These operations meet all International Telecommunication Union (“ITU”)

limits in this band, including those for deep space network (“DSN”) protection. The E-band

payload downlink consumes less than 300 W DC. The peak transmit power is 44.3 dBW EIRP

with 2.1852 GHz bandwidth. The maximum power flux density at the surface of the earth is

-138.05 dBW/m²/4 kHz. For the E-band ground uplink, the transmit peak power is 63.4 dBW

EIRP (or 78.3 dBW for the high power option) with 2.1852 GHz bandwidth.




6
  There is a possibility that mild tuning may be performed from the planned 72, 75, 82 and 85
GHz centered carriers (e.g., 74.8 and 82.2 GHz may be used to mitigate a potential spectral
regrowth issue). In addition, carriers may be run at the band edge (71, 76, 81, and 86 GHz) for
atmospheric attenuation characterization. This would be done in compliance with NTIA
Redbook requirements.
7
  The power levels were calculated using an altitude of 500 km – the lowest altitude – to assume
the highest levels for the altitude range for Athena’s orbit.


                                                 4


REDACTED FOR PUBLIC INSPECTION


       D.      No Harmful Interference – Generally

       PointView has taken a number of measures to ensure that no harmful interference will

result from its operations. As a threshold matter, the frequency bands and earth station locations

were selected to minimize the risk of harmful interference to, or from, other systems. PointView

has been in contact with government users operating in the proposed bands and adjacent bands,

including NASA. PointView has taken the input it has received in developing its operational

plan. It will continue to coordinate with government agencies and other potential spectrum users

prior to launch and while the satellite is in operation. PointView intends to conduct an

interference analysis and coordination study six months prior to launch so it can finalize

coordination with all users in a timely manner.

       PointView has established and will maintain a 24/7 point-of-contact for interference

issues. That contact is currently George Leris. His contact number is 571-216-3381.

       Transmissions will also be limited: E-band transmissions will last for less than 8 minutes

per contact (up to four contacts per day); X-band transmissions will last for less than 10 minutes

per contact (up to 10 contacts per day); S-band transmissions will last for less than 10 minutes

per contact (up to three contacts per day). Command files to alter or mute operations can be

uploaded at each available TT&C contact.

       E.      No Harmful Interference or Unwanted Emissions – Specifically for TT&C

       The proposed TT&C frequencies were identified based on careful interference analysis

and discussions with government users of the spectrum. PointView initially identified several

frequency bands in the 8025-8400 MHz and 8450-8500 MHz ranges before deciding on 8496.25

MHz for its telemetry downlink frequency based on communications with NTIA and NASA.

The 8496-8500 MHz band is allocated to the Space Research Service on a primary basis for both




                                                  5


REDACTED FOR PUBLIC INSPECTION

Federal and non-Federal use, and to the Fixed Service for Federal use. PointView believes it can

coordinate with systems currently operating in these services, as well as with NASA’s EM-1

system, announced for launch in December 2019, and will accept a condition to do so.

Moreover, Athena will not cause unwanted out-of-band emissions into NASA’s DSN satellites

operating at 8400-8450 MHz. PointView’s interference analysis shows that it complies with the

ITU’s SA.1157 out-of-band emissions mask for DSNs operating in the 8400-8450 MHz band.

PointView has had several productive discussions with NASA regarding the use of the X-band

spectrum, has supplied all requested information, has received positive feedback, and is

continuing coordination. Similarly, spacecraft manufacturer SSL and TT&C provider Atlas

Space Operations have coordinated with government stakeholders regarding the use of 2082

MHz for the command uplink.

II.    GRANT OF THIS APPLICATION WILL SERVE THE PUBLIC INTEREST

       Grant of this application will serve the public interest because it will allow PointView to

test whether LEO satellites using E-band spectrum                                            can be

an efficient means for providing fixed and mobile broadband access service. The experiment

will help PointView develop new broadband access options for unserved and underserved areas

throughout the world.

III.   THIS APPLICATION IS LEGALLY AND TECHNICALLY COMPLETE

       In this application and its exhibits, PointView is providing all the legal and technical

information required by the FCC.

       A.      Part 5 Narrative Application Requirements

       The application complies with all of the requirements of Part 5 of the Commission’s rules

for experimental applications. In addition to the material provided on FCC Form 442, PointView

provides the following narrative information.


                                                 6


REDACTED FOR PUBLIC INSPECTION


                 1.        Question 7a and Section 5.63(c)(1) – The complete program of
                           research and experimentation proposed, including a description of
                           equipment and theory of operation8

          The equipment and operations that make up the program of research and experimentation

are described in the Technical Annex.

                 2.        Question 7b – The specific objectives sought to be accomplished

          The Athena experiment will test, demonstrate, and validate new technologies for

providing broadband access by experimenting with                             E-band

communications between earth stations in up to five locations in the western United States and

an NGSO satellite operating in the low-earth orbit. Specifically, PointView is aiming to

understand whether an NGSO system using E-band spectrum

                      can be used for the provision of fixed and mobile broadband access in unserved

and underserved areas. The satellite is slated to be launched in early 2019.

                 3.        Question 7c – How the program of experimentation has a reasonable
                           promise of contributions to the development, extension, expansion or
                           utilization of the radio art, or is along line not already investigated

          The experiment has the potential to contribute to the development, extension, expansion,

and utilization of the radio art by helping to determine if the E-band spectrum can be used for

broadband access. PointView plans to publish many of its experimental findings, including ITU

atmospheric attenuation model validation data.

                 4.        Estimated duration of the experiment

          PointView anticipates that its testing will require approximately two years from start of

in-orbit operations. After that point, the satellite will be permanently switched off by irreversible

ground command.


8
    47 C.F.R. § 5.63(c)(1).


                                                    7


REDACTED FOR PUBLIC INSPECTION


                 5.        Section 5.64(a) – Construction at own risk9

          PointView has begun construction of the proposed satellite facilities at its own risk. It

notified the Commission’s Office of Engineering and Technology in writing that it planned to

begin construction at its own risk in July 2016.

          B.     Part 25 Application Requirements

          While this application is being filed under Part 5 of the Commission’s rules for

experimental licensing rather than Part 25 for satellite operations, PointView also provides the

information required by Part 25 to allow the Commission to fully evaluate the application. In the

narrative below and in the accompanying Technical Annex, Pointview is specifically submitting

all of the technical information required by Part 25 of the Commission’s Rules, radiation hazard

studies, and orbital debris assessment review.

                 1.        Section 25.114(c)(4) – Radio Frequency Plan10

          PointView’s proposed frequency plan is provided in the Technical Annex.

                 2.        Section 25.114(c)(6) – NGSO Orbital Characteristics11

          The Athena satellite will consist of one NGSO satellite operating in low-earth orbit. The

Technical Annex provides: the number of orbital planes and the number of space stations in each

plane; the inclination of the orbital planes; the orbital period; the apogee; the perigee; the active

service arc; and the local time of the descending node.12 The right ascension of the ascending

node is dependent upon the specific launch date. It will change by 0.9856° per day in order to




9
    47 C.F.R. § 5.64(a).
10
     47 C.F.R. § 25.114(c)(4).
11
     47 C.F.R. § 25.114(c)(6).
12
     Technical Annex § A.3.


                                                   8


REDACTED FOR PUBLIC INSPECTION

keep up with the Earth’s rotation around the sun in 365.25 days.13 Additional orbital parameters,

such as the argument of perigee and the initial phase angle of the satellite, are not applicable to a

one-satellite non-GSO system in a circular orbit.

                  3.      Section 25.114(c)(7) - Frequency Bands and Coverage Areas14

           PointView’s proposed frequency bands and coverage areas are provided in the Technical

Annex.

                  4.      Section 25.114(c)(8) - Calculated Maximum Power Flux Density
                          Levels15

           The calculated maximum power flux density levels are provided in the Technical Annex.

                  5.      Section 25.114(c)(10) – Estimated Operational Lifetime16

           The estimated operational lifetime of the Athena satellite is approximately two years

from the start of in-orbit operations.

                    6.    Section 25.114(d)(1) – Overall Description of System Facilities and
                          Operations17

           The overall description of system facilities and operations, including an explanation of

the manner in which the uplink frequency bands will be connected to the downlink frequency

bands, is provided in the Technical Annex.

                  7.      Section 25.114(d)(6) – Public Interest Rationale18

           The public interest rationale for the application has been provided in Section II of this

narrative.

13
     Id.
14
     47 C.F.R. § 25.114(c)(7).
15
     47 C.F.R. § 25.114(c)(10).
16
     47 C.F.R. § 25.114(d)(1).
17
     47 C.F.R. § 25.114(d)(6).
18
     47 C.F.R. § 25.114(d)(6).


                                                     9


REDACTED FOR PUBLIC INSPECTION


                 8.      Sections 5.64(b) and 25.114(d)(14) – Orbital Debris Mitigation19

          The Orbital Debris Assessment Report (“ODAR”) is attached as Exhibit 2 to this

narrative.20 The design of the satellite will limit the amount of debris and the probability of the

satellite becoming a source of debris. The satellite has been designed with no separable

materials or solar panels. This means that all parts will remain attached during launch,

operations, and de-orbiting. The lack of any pressurized vessels on the spacecraft means that

there is no risk of accidental explosions during or after completion of mission operations.

          The ODAR was prepared using NASA’s Debris Assessment Software for orbital debris

control and risk mitigation. It shows that the Athena spacecraft is compliant with NASA’s

standards for orbital debris mitigation and with the objective of limiting the risk for human

casualties. Three items are expected to survive re-entry, resulting in a low 1-in-31,800 chance of

human casualty, which is well within NASA requirement 4.7-1 in NASA-std-8719.14. In

addition, the Athena spacecraft has been manufactured following a “design to demise” approach

in choosing materials.

          The spacecraft is compliant with de-orbit timeframe requirements. Under worst case

conditions of 565 km circular orbit, including the 550 km maximum altitude, plus 15 km orbit

insertion range from the launch vehicle provider, the spacecraft will de-orbit within 17 years

from launch, or 15 years from the nominal end of mission. This is well within NASA

Requirement 4.3-1 to de-orbit within 25 years of end of mission.21



19
     47 C.F.R. §§ 5.64, 25.114(d)(14).
20
  The calculations for the ODAR assume an orbit of 550 km, the worst-case reentry scenario for
the Athena satellite.
21
  See NASA, Process for Limiting Orbital Debris, NASA-STS-8719.14A (with Change 1) §
4.3.2, Requirement 4.3-1 at 21(approved May 25, 2012).


                                                 10


REDACTED FOR PUBLIC INSPECTION


                 9.        Section 25.132 – Radiation Hazard Studies22

          Radiation hazard studies for the payload communications are provided in Exhibit 3.

PointView will take the appropriate steps recommended in those studies.

                 10.       Section 25.207 – Cessation of Emissions23

          Ground TT&C operations will have the power to cease satellite transmissions. The

Technical Annex explains how this will be accomplished.

          C.     TT&C Earth Stations

          The three TT&C earth stations will be operated by PointView’s partners subject to

authority that has already been received or will soon be requested.24 Nevertheless, the technical

information for these earth stations is included in Form 442. The Technical Annex provides a

description of the manner in which TT&C will be provided for the experiment.

IV.       ITU COST RECOVERY

          International registration is not always required for experimental satellite authorizations.

Nevertheless, to the extent necessary, PointView will provide all necessary information for filing

any Advance Publication Information with the ITU. PointView accepts all international and

national frequency coordination obligations for the Athena satellite. PointView will provide the

FCC and the State Department any information necessary for filing any required Space Object

Registration with the United Nations Office for Outer Space Affairs.


22
     47 C.F.R. § 25.132.
23
     47 C.F.R. § 25.207.
24
  PointView understands that one earth station, in Albuquerque, NM, is already licensed under a
Department of Defense authorization, and Atlas is duly authorized to use it. See Naval
Postgraduate School Application for Equipment Frequency Allocation, DD Form 1494 (July 7,
2015). A new earth station application will be filed by Atlas for a station in Mojave, CA, and a
request for modification authority will be filed by Atlas’s partner, Denali 20020, LLC
(“Denali”), for a station licensed to Denali in Brewster, WA.


                                                   11


REDACTED FOR PUBLIC INSPECTION

       PointView is aware that, as a result of the actions taken at the 1998 Plenipotentiary

Conference, as modified by the ITU Council in June 2001, processing fees are now charged by

the ITU for satellite network filings. As a consequence, Commission applicants are responsible

for any and all fees charged by the ITU. PointView affirms it is aware of, and unconditionally

accepts, this requirement and its responsibility to pay any ITU cost recovery fees for the ITU

filings associated with this application. Invoices for such fees may be sent to the undersigned.

V.     CONCLUSION

       For the foregoing reasons, PointView respectfully requests that the Commission promptly

grant this application for launch and operating authority for the Athena satellite as in the public

interest, convenience, and necessity.

                                              Respectfully submitted,


                                                ________/s/___________
                                               Pantelis Michalopoulos
                                               Steptoe & Johnson LLP
                                               1330 Connecticut Avenue, N.W.
                                               Washington, D.C. 20036
                                               (202) 429-3000
                                               Counsel for PointView Tech LLC


April 26, 2018




                                                 12



Document Created: 2019-03-09 23:53:02
Document Modified: 2019-03-09 23:53:02

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC