DescriptionCategoryDate
Confidential ExhibitText Documents2020-02-18
Confidentiality RequestText Documents2020-02-18
E-Mail generated [Feb 20 2020]Correspondence2020-02-20
E-Mail generated [Feb 20 2020]Correspondence2020-02-20
Grant E-mail Notification generated [Mar 3 2020]Correspondence2020-03-03
E-Mail generated [Feb 20 2020]Correspondence2020-02-20
E-Mail generated [Feb 20 2020]Correspondence2020-02-20
Grant E-mail Notification generated [Mar 3 2020]Correspondence2020-03-03
Confidential ExhibitText Documents2020-02-18
Confidentiality RequestText Documents2020-02-18
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  PointView Tech LLC

Address
Attention: Christophe Bjornson
Street Address: 1330 Connecticut Avenue, NW
P.O. Box:
City: Washington, D.C.
State: DC
Zip Code: 20036
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Bjornson
First Name: Christopher
Title: Counsel
Phone Number: 202-429-3059

Explanation
Please explain in the area below why an STA is necessary:
The purpose of this experiment is to check the health of future E-band transmissions. It is expected to be of a very short duration of 30 days with follow-on testing over period of 90-120 days following initial testing.

Purpose of Operation
Please explain the purpose of operation:  Testing of point-to-point microwave links will provide data inputs to establish, tune, and calibrate future E-band links. The stop-buzzer contact is George Leris - 571-216-3381.

Information
Callsign: WQ9XCS
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 03/05/2020
Operation End Date: 08/20/2020

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Confidential Confidential 2 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): George Leris
Title of Applicant (if any): Authorized Representative
Date: 2020-02-18 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Mt. Wilson California North  34  13  30 West  118  3  24 11.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:   0.10
(b) Orientation in horizontal plane:   32.36
(c) Orientation in vertical plane:   0.03
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 71.00000000-76.00000000 GHz FX 4.000000 W 10.000000 MW P 0.01000000 % 5G00D1D 64QAM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 81.00000000-86.00000000 GHz FX 4.000000 W 10.000000 MW P 0.01000000 % 5G00D1D 64QAM

City State Latitude Longitude Mobile Radius of Operation
Stony Ridge California North  34  18  6 West  117  59  52 11.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:   0.50
(b) Orientation in horizontal plane:   212.00
(c) Orientation in vertical plane:   0.03
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 71.00000000-76.00000000 GHz FX 2.000000 W 250.000000 kW P 0.01000000 % 5G00D1D 64QAM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 81.00000000-86.00000000 GHz FX 2.000000 W 250.000000 kW P 0.01000000 % 5G00D1D 64QAM

22415