Toggle navigation
FCC.report
IBFS
ELS
FCC ID
Contact
About
FCC.report
›
ELS
›
Parallel Wireless, Inc.
›
0447-EX-ST-2016
Parallel Wireless, Inc.
0447-EX-ST-2016
Status: Grant Expired Due to New License
WJ9XEE
2016-04-13
Documents and Communications:
[
refresh
]
Description
Category
Date
Grant E-mail Notification generated [Apr 14 2016]
Correspondence
2016-04-14
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY
Applicant Name
Name of Applicant:
Parallel Wireless, Inc.
Address
Attention:
Bijan Razzaghi
Street Address:
One Tara Boulevard, Suite 404
P.O. Box:
City:
Nashua
State:
NH
Zip Code:
03062
Country:
E-Mail Address:
[email protected]
Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:
Last Name:
Kropper
First Name:
Steve
Title:
VP of Business Development
Phone Number:
(617) 306-9312
Explanation
Please explain in the area below why an STA is necessary:
The Special Temporary Authority is necessary for Parallel Wireless to demonstrate a prototype network system cellular base station in the Band 14 public safety LTE band. Parallel Wireless’s existing Special Temporary Authorities do not cover the area and dates of the demonstration. The experiment will take place at and around Baker College, 2000 St Clair Street, Port Huron, MI 48060 and the Blue Water Bridge, Port Huron, MI, during the specified dates. The experiment will be for the fourth Canada-U.S. Enhanced Resiliency Experiment (CAUSE), which uses cross-border information-sharing experiments to help increase resilience at the northern border. CAUSE IV will be a joint effort of Parallel Wireless, the Department of Homeland Security (DHS) Science and Technology Directorate (S&T), and the Defence Research and Development Canada’s Centre for Security Science (DRDC CSS).
Purpose of Operation
Please explain the purpose of operation:
The objective of this demonstration is to showcase network capabilities in the Band 14 public safety LTE band. The demonstration will take place at and around Baker College, 2000 St Clair Street, Port Huron, MI 48060 and the Blue Water Bridge, Port Huron, MI, during the specified dates. The experiment will be part of an ongoing experiment series, Canada-U.S. Enhanced Resiliency Experiment (CAUSE), to help increase resilience at the northern border. This demonstration will utilize one CWS-1XX, one CWS-2XXX, and one CWS-2XX from Parallel Wireless that provide Band 14 LTE coverage. Both the CWS-1XX and the CWS-2XXX will be fixed units, located at Baker College. The CWS-2XX unit will be installed in an ambulance that will be traveling back and forth on the Blue Water Bridge. There is no mission-critical aspect to this particular demonstration.
Information
Callsign:
WJ9XEE
Class of Station:
FX MO
Nature of Service:
Experimental
Requested Period of Operation
Operation Start Date:
04/21/2016
Operation End Date:
04/29/2016
Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:
Manufacturer
Model Number
No. Of Units
Experimental
Parallel Wireless, Inc.
CWS-2XXX
1
Yes
Parallel Wireless, Inc.
CWS-2XX
1
Yes
Parallel Wireless, Inc.
CWS-1XX
1
Yes
Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form):
/Bijan Razzaghi/
Title of Applicant (if any):
IP Counsel
Date:
2016-04-01 00:00:00.0
Station Location
City
State
Latitude
Longitude
Mobile
Radius of Operation
Port Huron
Michigan
North 42 59 55
West 82 25 24
Along and around the Blue Water Bridge.
1.00
Datum:
NAD 83
Is a directional antenna (other than radar) used?
No
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane:
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
758.00000000-768.00000000 MHz
MO
1.000000 W N/A
P
10M0F9W
LTE OFDMA
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
788.00000000-798.00000000 MHz
MO
1.000000 W N/A
P
10M0F9W
LTE OFDMA
City
State
Latitude
Longitude
Mobile
Radius of Operation
Port Huron
Michigan
North 42 59 47
West 82 25 41
1.00
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
120.00
(b) Orientation in horizontal plane:
1.00
(c) Orientation in vertical plane:
15.00
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
758.00000000-768.00000000 MHz
FX
1.000000 W N/A
P
10M0F9W
LTE OFDMA
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
788.00000000-798.00000000 MHz
FX
1.000000 W N/A
P
10M0F9W
LTE OFDMA
City
State
Latitude
Longitude
Mobile
Radius of Operation
Port Huron
Michigan
North 42 59 47
West 82 25 41
3.00
Datum:
NAD 83
Is a directional antenna (other than radar) used?
No
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane:
(c) Orientation in vertical plane:
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
758.00000000-768.00000000 MHz
FX
40.000000 W N/A
P
10M0F9W
LTE OFDMA
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
788.00000000-798.00000000 MHz
FX
40.000000 W N/A
P
10M0F9W
LTE OFDMA
30957
© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC