Oceus Networks

0942-EX-ST-2021

Status: Pending

N/A
2021-06-08

Documents and Communications: [refresh]

DescriptionCategoryDate
Line DrawingImages2021-06-08
E-Mail generated [Jun 11 2021]Correspondence2021-06-11
Grant E-mail Notification generated [Jun 24 2021]Correspondence2021-06-24
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Oceus Networks

Address
Attention: Daniel Goldberg
Street Address: 1895 Preston White Drive
P.O. Box:
City: Reston
State: VA
Zip Code: 20191
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Goldberg
First Name: Daniel
Title: Program Manager
Phone Number: 5713313762

Explanation
Please explain in the area below why an STA is necessary:
Oceus Networks is testing 5G technology in support of a DOD contract.

Purpose of Operation
Please explain the purpose of operation:  Supporting the DOD for 5G Experimentation, a temporary and limited exercise. Setting up teemporary base station and will conduct training and demonstration of 5g capability within immediate vicinity of base station with commercial mobile phones

Information
Callsign: WS9XGG
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 06/24/2021
Operation End Date: 06/30/2021

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Ericsson 4478 3 No
Ericsson 4415 3 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Daniel Goldberg
Title of Applicant (if any): Program Manager
Date: 2021-06-08 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
San Antonio Texas North  29  26  50 West  98  27  15
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:   65.00
(b) Orientation in horizontal plane:   240.00
(c) Orientation in vertical plane:   2.00
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 869.00000000-894.00000000 MHz FX 250.000000 mW 8.000000 W M 5M00W7W OFDM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 1930.00000000-1990.00000000 MHz FX 250.000000 mW 16.000000 W M 20M0W7W OFDM

City State Latitude Longitude Mobile Radius of Operation
San Antonio Texas North  29  26  50 West  98  27  15
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:   65.00
(b) Orientation in horizontal plane:   120.00
(c) Orientation in vertical plane:   2.00
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 869.00000000-894.00000000 MHz FX 250.000000 mW 8.000000 W P 5M00W7W OFDM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1930.00000000-1990.00000000 MHz FX 250.000000 mW 16.000000 W P 20M0W7W OFDM

22151

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC