Nokia

1049-EX-ST-2018

Status: Pending

N/A
2018-06-07
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Nokia

Address
Attention: Glenn Steitz
Street Address: 600 Mountain Ave
P.O. Box:
City: Murray Hill
State: NJ
Zip Code: 07974
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Steitz
First Name: Glenn
Title: Senoir Manager
Phone Number: 973210028

Explanation
Please explain in the area below why an STA is necessary:
Nokia is a leading manufacturer of mobile broadband radio equipment, the grant of the experimental special temporary STA (Experimental STA) application will allow Nokia to demonstrate its Wireless concepts and potential products to its potential cusotmers at its facilityin Murray Hill, New Jersey which will allow the company to enhance its efforts to design and develop equipment to meet the communications needs of our customers.

Purpose of Operation
Please explain the purpose of operation:  Nokia wants to demonstrate Nokia End-to-End CBRS Wireless solution consisting of Nokia Spectrum Access System (SAS), Nokia Domain Proxy (DP), Nokia Environmental Sensing Capability Cloud (ESC) and Nokia indoor and outdoor CBSDs to our customers at its facility in Murray Hill, NJ 07974, 600 Mountain Ave, the STA period would be from June 30th to December 30th, 2018 to allow time for setup, customer demonstrations/testing and operation of the equipment and incumbent protection scenarios. This testing will utilize Nokia’s SAS - an early version of which has been demonstrated at FCC headquarters in Washington DC on March 22, 2018 to FCC Commisoner Mike ORielly, FCC OET Chief Julius Knapp, CBRS team in OET and select NTIA staff. Nokia presently is a Wave 2 applicant.

Information
Callsign: WN9XHI
Class of Station: FX MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 06/30/2018
Operation End Date: 12/30/2018

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Nokia CSBD Base Stati 8 No
Nokia CPE 12 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Glenn Steitz
Title of Applicant (if any): Senior Manager
Date: 2018-06-07 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Murray Hill New Jersey North  40  41  3 West  74  24  5 Nokia Facility 2.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:   70.00
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft: Nokia Facility
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 3650.00000000-3700.00000000 MHz FX 8.000000 W 40.000000 W P 150MW7N 64 QAM, OFDM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 3650.00000000-3700.00000000 MHz MO 200.000000 mW 200.000000 mW P 150MW7W 64 QAM, OFDM

16571

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC