Michigan Technological University - Aerospace Enterprise

0528-EX-ST-2016

Status: Denied/Dismissed

WJ9XVW
2017-05-03

Documents and Communications: [refresh]

DescriptionCategoryDate
ResponseCorrespondence2016-04-19
E-Mail generated [Apr 18 2016]Correspondence2016-04-18
E-Mail generated [Apr 20 2016]Correspondence2016-04-20
Dismissal Without Prejudice generated [May 3 2017]Correspondence2017-05-03
Dismissal Without Prejudice generated [May 3 2017]Post Grant Documents2017-05-17
Mission OverviewText Documents2016-04-14
Satellite InformationText Documents2016-05-10
Satellite InformationText Documents2016-07-06
IARU Coordination LetterText Documents2016-04-14
Indication of Exempt StatusText Documents2016-04-14
ResponseCorrespondence2016-04-19
E-Mail generated [Apr 18 2016]Correspondence2016-04-18
E-Mail generated [Apr 20 2016]Correspondence2016-04-20
Dismissal Without Prejudice generated [May 3 2017]Correspondence2017-05-03
Dismissal Without Prejudice generated [May 3 2017]Post Grant Documents2017-05-17
Mission OverviewText Documents2016-04-14
Satellite InformationText Documents2016-05-10
Satellite InformationText Documents2016-07-06
IARU Coordination LetterText Documents2016-04-14
Indication of Exempt StatusText Documents2016-04-14
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Michigan Technological University - Aerospace Enterprise

Address
Attention: Cole Gingras
Street Address: 1400 Townsend Dr. - 815 RL Smith Bldg
P.O. Box:
City: Houghton
State: MI
Zip Code: 49931
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Gingras
First Name: Cole
Title: Mission Director
Phone Number: 2315904556

Explanation
Please explain in the area below why an STA is necessary:
Six month experimental satellite mission requiring uplink frequency between 148-149.9 MHz (hardware capable of 120 and 150 MHz). Attempted to coordinate with International Amateur Radio Union, but was denied because mission is experimental and 2 m amateur band is overallocated. Seeking temporary authorization to operate a ground station within the aforementioned frequency band beginning on the date of launch for the Space Test Program 2 (STP-2) mission scheduled to launch in March 2017.

Purpose of Operation
Please explain the purpose of operation:  Frequency would be used to command and control Oculus-ASR nanosatellite, a university satellite project partially supported by the Air Force Research Laboratorys University Nanosatellite Program.

Information
Callsign: WJ9XVW
Class of Station: FX MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 03/01/2017
Operation End Date: 09/01/2017

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Astronautical Development Helium-100 1 No
Yaesu FT-847 1 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Andrew Conley
Title of Applicant (if any): Project Manager
Date: 2016-04-14 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
North      West      Orbit: 860 km x 300 km at 28.5 degree inclination
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 437.20000000- MHz MO 4.000000 W 740.000000 mW P 10K0F3D GMSK

City State Latitude Longitude Mobile Radius of Operation
Ann Arbor Michigan North  42  17  30 West  83  42  49
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 148.00000000-148.58125000 MHz FX 1000.000000 W 50.000000 W P 15K0FXD GMSK
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 148.59375000-149.90000000 MHz FX 1000.000000 W 50.000000 W P 15K0FXD GMSK