MIT/LL

0410-EX-ST-2021

Status: Pending

N/A
2021-04-12

Documents and Communications: [refresh]

DescriptionCategoryDate
Exhibit AttachmentText Documents2021-04-12
MODULATING SIGNAL DESCRIPTIONText Documents2021-04-12
NECESSARY BANDWIDTH DESCRIPTIONText Documents2021-04-12
E-Mail generated [Apr 14 2021]Correspondence2021-04-14
Dismissal Without Prejudice generated [Jun 1 2021]Correspondence2021-06-01
Dismiss E-mail Notification generated [Jun 1 2021]Correspondence2021-06-01
E-Mail generated [Apr 14 2021]Correspondence2021-04-14
Dismissal Without Prejudice generated [Jun 1 2021]Correspondence2021-06-01
Dismiss E-mail Notification generated [Jun 1 2021]Correspondence2021-06-01
Exhibit AttachmentText Documents2021-04-12
MODULATING SIGNAL DESCRIPTIONText Documents2021-04-12
NECESSARY BANDWIDTH DESCRIPTIONText Documents2021-04-12
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  MIT/LL

Address
Attention: Devin Kelly
Street Address: 244 Wood St
P.O. Box:
City: Lexington
State: MA
Zip Code: 02421
Country: United States
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Kelly
First Name: Devin
Title: Associate Staff
Phone Number: 7819817699

Explanation
Please explain in the area below why an STA is necessary:
An STA is necessary to support the testing of a sensor being developed by MIT Lincoln Laboratory for a government program.

Purpose of Operation
Please explain the purpose of operation:  The purpose of this operation is to develop a surrogate transmitter. The surrogate transmitter will be used to test the performance on a sensor that is under development. The frequency range being considered is 3.3 GHz to 3.6 GHz and the maximum ERP being considered is 4 W.

Information
Callsign:
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 05/03/2021
Operation End Date: 10/29/2021

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Ettus Research X310 2 No
Minicircuits ZHL-1W-63-S+ 2 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Devin Kelly
Title of Applicant (if any): Associate Staff
Date: 2021-03-19 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Devens Massachusetts North  42  32  51 West  71  34  37 Ft Devens, Massachusetts, USA 7.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 3.30000000-3.60000000 GHz MO 1.000000 W 4.000000 W P 0.00200000 % 100MW7C OFDM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 3.30000000-3.60000000 GHz MO 1.000000 W 4.000000 W P 0.00200000 % 100KN0N CW Tone

16165

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC