Exhibits I & II

3818-EX-PL-1993 Text Documents

MARTIN MARIETTA CORP.

1999-09-23ELS_18341

                                  EXHIBIT I
This request   is    response for the project called   "Arrow" under the
contract,   95025 30001, to the Israceli Government. The  equipment
being used is built by the Martin Marietta Corporation and     uti—~
lizazes frequency hopping FM modulation. The power output will    be
450 watts   (FEAK),   26.5 dBW,   transmitting with a directional   27 dB
gain   antenna.     The program is scheduled to run from July 1993     to
December 1994 and will be conducted at our Simulation Test   Labo—
ratory  located  at  the Main Plant Facilities  on  Sandlake    and
Kirkman Roads.


                               EXHIBIT ILI
                         Site Description

The antenna will be mounted on a 15.24 M tower, which is    located
next to the Simulation Test Labs building which is   approximately
22.86  M tall. The antenna will be aim in a downward    angle   down
the test range at ground targets. You will see below a           represen—
tation  of the Simulation Test Laboratory facility and           the  pro—
posed tower for the project.




                                                                                 224 Blo m
                                             15.24m




                                                      SimalationTest Lab éra.‘*a«y —



Document Created: 2001-08-15 21:21:48
Document Modified: 2001-08-15 21:21:48

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC