DD FORM 1494

0540-EX-ST-2014 Text Documents

L3 Unmanned Systems, Inc.

2014-06-19ELS_150434

                                                                            CLASSIFICATION                        DATE                                     Form Approved
          APPLICATION FOR EQUIPMENT                                                                                                                        OMB No. 0704-0188
            FREQUENCY ALLOCATION                                                     Unclassified                           10June2014
                                                                                                                                                         PAGE 1 OF                 PAGES
The public reporting burden for this collection of information is estimated to average 24 hours per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection
of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding
any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number,
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ORGANIZATION. RETURN COMPLETED FORM TO THE USING AGENCY OR CONTRACTING AGENCY,
AS APPROPRIATE.

                                                                          DOD GENERAL INFORMATION
TO                                                                                   FROM
Office of the DOD area frequency coordinator
Quantico, Virginia



1. APPLICATION TITLE
Orbiter III Unmanned Aerial System
2. SYSTEM NOMENCLATURE
"Line of Site" Data Link Telemetry System
3. STAGE OF ALLOCATION (X one)
        a. STAGE 1 - CONCEPTUAL                      b. STAGE 2 - EXPERIMENTAL                        c. STAGE 3 - DEVELOPMENTAL                         d. STAGE 4 - OPERATIONAL
4. FREQUENCY REQUIREMENTS
     a. FREQUENCY(IES)                    Control 425-441 Mhz, Video 2200-2300 Mhz
     b. EMISSION DESIGNATOR(S)


5. TARGET STARTING DATE FOR SUBSEQUENT STAGES
     a. STAGE 2                                                b. STAGE 3                                                      c. STAGE 4
                                                                                                                                           7July 2013 - 25July 2013
6. EXTENT OF USE
 Continuous during flight operations
7. GEOGRAPHICAL AREA FOR
     a. STAGE 2
     b. STAGE 3
     c. STAGE 4
                    Restricted area(s) R-6608A, R-6608B and R-6608C
8. NUMBER OF UNITS
     a. STAGE 2                                                b. STAGE 3                                                      c. STAGE 4
                                                                                                                                 3 Airvehcles and 2 Ground Control Unit
9. NUMBER OF UNITS OPERATING SIMULTANEOUSLY IN THE SAME ENVIRONMENT
two
10. OTHER J/F 12 APPLICATION NUMBER(S) TO BE                                                 11. IS THERE ANY OPERATIONAL REQUIREMENT AS DESCRIBED IN
        a. SUPERSEDED J/F 12/                                                                    THE INSTRUCTIONS FOR PARAGRAPH 11?
        b RELATED J/F 12/                                                                             a. YES                            b. NO                           c. NAvail
12. NAMES AND TELEPHONE NUMBERS
     a. PROGRAM MANAGER                                                                      (1) COMMERCIAL                                     (2) AUTOVON
Dave Lleras                                                                                                972-951-5200
     b. PROJECT ENGINEER                                                                     (1) COMMERCIAL                                     (2) AUTOVON
Brian Anderson                                                                                              214-232-0361
13. REMARKS




DOWNGRADING INSTRUCTIONS                                                                     CLASSIFICATION

                                                                                                             Unclassified

DD FORM 1494, AUG 96                                                   PREVIOUS EDITION MAY BE USED.
                                                                                                                                           Reset                        Adobe Professional 7.0


                                     INSTRUCTIONS FOR COMPLETING DD FORM 1494,
                                 "APPLICATION FOR EQUIPMENT FREQUENCY ALLOCATION"

 GENERAL INFORMATION                                                      ITEM 3 - Stage of Allocation. Mark the appropriate block using the
                                                                          following NTIA definitions.
 CLASSIFICATION: This form must be classified in accordance with
 appropriate agency security directions. Downgrading instructions         Stage 1 - Conceptual. The initial planning effort has been
 must be indicated. The highest classification for each item or sub-      completed, including proposed frequency bands and other available
 item as required must be indicated by a (U), (C), or (S) alongside the   characteristics.
 item or sub-item title, for classified applications.
                                                                          Stage 2 - Experimental. The preliminary design has been completed,
 APPLICATION PURPOSE: This is an application for development or           and radiation, using test equipment or preliminary models, may be
 procurement of equipment with RF emitters. It is not a frequency         required.
 assignment request for operation of RF emitters. Funds must not be
 obligated prior to the approval of an application for frequency          Stage 3 - Developmental. The major design has been completed,
 allocation.                                                              and radiation may be required during testing.

 DATA REQUIREMENT: All applicable data items shall be submitted           Stage 4 - Operational. Development has been essentially completed,
 for all stages. Estimated values or ranges of values may be submit-      and final operating constraints or restrictions required to assure
 ted for Stage 1 and 2 in the absence of calculated or measured           compatibility need to be identified.
 values and shall be annotated (EST). Values for Stages 3 and 4
 should be measured.                                                      ITEM 4 - Frequency Requirements.

 STANDARDS: Technical parameters of the application will be               a. Enter the required frequency band(s). For equipment designed to
 evaluated against the appropriate DoD, National and International        operate only at a single frequency, enter this frequency. Indicate
 EMC standards.                                                           units, e.g., kHz, MHz, or GHz.

 REMARKS ITEMS: Use the remarks item located at the bottom of             b. Enter the emission designator(s) including the necessary band-
 each page of the form to amplify or clarify the entries. Add             width for each designator, as described in Chapter 9 of the NTIA
 continuation pages as required.                                          Manual e.g., 40M0PON. Identify each mode as hopping or
                                                                          non-hopping, e.g. 64M0F3E (Hopping).
 ABBREVIATIONS:
                                                                          Enter in Item 13, "Remarks," any other information pertinent to
                                                                          frequency requirements, such as minimum frequency separation or
 Hertz                    Hz        microseconds              usec        special relationships involving multiple discrete frequencies.
 kilohertz                kHz       decibel                   dB
 megahertz                MHz       dB isotropic              dBi         ITEM 5 - Target Starting Date for Subsequent Stages. Enter
 gigahertz                GHz       pulses per second         pps         proposed date of application submission for each subsequent stage.
 milliwatt                mW        parts per million         ppm
 watt                     W         peak envelope power       PEP         ITEM 6 - Extent of Use. Describe extent of use that will apply to
 nanoseconds              nsec      not applicable            NA          Stage 4, e.g., continuous or intermittent. If intermittent, provide
 National                 NTIA      not available             NAvail      information including the expected number of hours of operation per
 Telecommunications                 occupied bandwidth        OC-BW       day or other appropriate time period; scheduling capability; and any
     & Information                                                        conditions governing the times of intermittent use, e.g., used only
     Administration                                                       during terminal guidance phase, used only as required for calibration
                                                                          of test range equipment.
 HOW TO ASSEMBLE THE FORM:
                                                                          ITEM 7 - Geographical Area. Enter geographical location(s) or
 FOR US COORDINATION:                                                     area(s) of use for this and subsequent stage(s), e.g., Gilfillan Plant,
                                                                          Los Angeles, California, and White Sands Missile Range, New
 1.   DoD General Information Page                                        Mexico (Stage 2); US&P (Stage 3); US&P, NATO Countries and
 2.   Transmitter Page(s)                                                 Korea (Stage 4). Provide geographical coordinates (degrees,
 3.   Receiver Page(s)                                                    minutes, seconds) if available.
 4.   Antenna Page(s)
 5.   Line Diagram(s)                                                     ITEM 8 - Number of Units. Enter total number of units planned for
 6.   Space Systems Data, if applicable                                   the stage review requested and the subsequent stages.
 7.   Continuation Page(s) (cross reference pages)
 8.   NTIA General Information Page                                       ITEM 9 - Number of Units Operating Simultaneously in the Same
                                                                          Environment. Enter maximum number of these units planned to be
 FOR FOREIGN COORDINATION: If this form is used to obtain                 operating simultaneously in the same environment during Stage 4
 foreign national frequency supportability comments, see the              use.
 instructions on the back of the Foreign Coordination General
 Information Page.                                                        ITEM 10 - Other J/F 12 Application Number(s). Mark appropriate
                                                                          block(s) and enter J/F 12 number(s) for superseded and/or related
                                                                          application(s).
 DOD GENERAL INFORMATION PAGE
                                                                          ITEM 11 - Operational Requirement. If this equipment will operate
 ITEM 1 - Application Title. Enter the Government nomenclature of         with the same or similar equipment used by other US Military
 the equipment, or the manufacturer's name and model number, and          Services, DoD Components, US Government Agencies or Allied
 a short descriptive title.                                               Nations, mark "Yes," and specify in Item 13, "Remarks," the
                                                                          Services, Agencies or countries (to include the country's services).
 ITEM 2 - System Nomenclature. Enter the nomenclature of the
 system for which this equipment is a subsystem, e.g., PATRIOT or         ITEMS 12 and 13 - Self-explanatory.
 Global Positioning System.




DD FORM 1494, AUG 96                                                                                         DoD General Information Page (Back)



Document Created: 2014-06-10 10:33:44
Document Modified: 2014-06-10 10:33:44

© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC