Exhibits 1 & 2

3280-EX-ML-1992 Text Documents

ITRON, INC.

1999-09-16ELS_17218

                                            EXHIBIT

                           Description       of Experimental Syst

         Itron, Inc. ("Itron"), of Spokane, Washington, and EnScan, Inc. ("EnScan"),
of Eden Prairie, Minnesota, have each been pursuing, over several years,
methods of radio—based, off—site meter reading ("OMR"), to improve the
efficiency of utility company operations. In February, 1992, Itron acquired
EnScan (Call Sign KAZXM}J), which now operates as a wholly—owned subsidiary
of Itron. At present, Itron is combining the two company‘s technologies and
seeks in this application the authority to demonstrate and test the resultant
product further .‘

        Itron‘s Genesis OMR system combines a new communication device and a
unique communication protocol for reading residential and commercial gas and
electric meters remotely . The Genesis system has two components: the ERT unit
and the DataCap PN handheld computer.

        The ERT unit is a low—power communications device installed on a gas
meter to encode natural gas consumption or in a kilowatt—hour electric meter to
encode kilowatt—hour electric consumption. In addition, the ERT module
monitors a tamper detection circuit. The receiver of the ERT Unit also monitors
for the presence of an activation signal from the DataCap PN handheld device.
The ERT is certified under Part 15 operating in the band 902—928 MHz.

        The DataCap PN is a low power radio transceiver installed in a handheld
computer and consists of the ERT activation transmitter, a multichannel receiver
decoder, and a computer to control unit operation and data storage. Each
DataCap PN unit will serve 250 ERT modules.

       The DataCap PN is carried by utility meter readers walking meter reading
routes on streets adjacent to buildings equipped with ERT meters. When the
reader transmits the activation signal, the signal is received and decoded by the
ERT Units, which then transmit the meter account data back to the DataCap PN.


1 Itron will hold the license for the experimental system, but, if the Commission so desires, the
customer/utility participating in the market test portion of the experiment (see Exhibit 2) could
jointly hold the license for the particular DataCap PN unit used by such customer/utility.


                                         —2—


The DataCap PN is capable of reading and storing meter data on up to 1,500
meters during an 8—hour shift.

       EnScan was granted a Part 5 Experimental License, effective October 27,
1986, and renewed most recently as of February 1, 1992. The authorization
allows EnScan to test twelve units of its mobile data collector, which was vehicle—
driven (Call Sign KA2XMJ, File No. 0240—EX—R—92). With this application, Itron is
seeking to modify and expand the experimental radio license. Itron is requesting
to operate up to 125 of the DataCap PN units at 952 MHz or 956 MHz. As
proposed in this application, 100 units would be used in the market test with
utilities around the country, and 25 would be used in—house for further testing at
the Itron/EnScan facilities in California, Minnesota, and Washington.

       The objective of the experiment is to determine the performance of the
new unit in varying "real—life" trials, operating with utilities in the various
situations that they face, as described more fully in Exhibit 2. The data collected
will enable Itron to determine the efficacy of various performance characteristics
of the DataCap PN unit in order to maximize its commercial usefulness.


                                      EXHIBIT

                                     Market

       Itron seeks, in addition to experimental authority to use the handheld
DataCap PN computer on frequencies 952 and 956 MHz, the authority pursuant
to 47 C.F.R. § 5.202(j) to conduct limited market studies and sales of its OMR
system. Specifically, Itron seeks to market up to 100 of the DataCap PN units to
up to 25 utilities across the country. During the market study, however, each
utility will operate on the average only four (4) DataCap PN Units. Therefore, it
is necessary to have the ability to involve up to 25 utilities in the market test in
order to obtain a sufficient amount of reliable data, particularly given the high
degree of variability among the factors to be tested during the market study, as
discussed in detail below.

       The marketing study seeks to demonstrate to utilities how Itron‘s OMR
system can improve their operations. The traditional method of manually
reading meters is an inefficient means to collect data. Itron‘s OMR system
applies a high technology communications methodology to persistent problems
of utility efficiency, that have previously led to higher rates to consumers,
excessive energy consumption, and unnecessary facility construction.

       One of the important purposes of the market test will be to determine the
pricing structure for the Itron OMR system. The present plan is to price DataCap
PN units in the $5,000.00 to $6,000.00 range. The demand for Itron‘s OMR
system in this price range will, of course, determine what features and
performance specifications to incorporate into each DataCap PN unit.

       This pricing factor will also be heavily influenced by the utility‘s particular
service area, which will require many multiples of the units. For example, the
Los Angeles metropolitan area alone comprises 15 million utility meters. There
are, therefore, a large number of variables of utility size, service area size and
type, DataCap PN unit features and capabilities, and price all must be accounted
for in the market testing.

       There is, moreover, a requirement to provide units at multiple utilities in
each of three types of utilities: gas, electric, and combination gas and electric


                                        —2—


utilities. The functionality requirements, as well as performance requirements,
are somewhat different at each of the three types. Therefore, data gathering is
required at a cross—section of several utilities at each of these three types of
utilities.

        In addition to the above, there are service, function, environmental, and
regulatory variables that also must be factored into the market test. These are
outlined below.

1.      and
       Some functionality and performance variables that may be evaluated
differently at all three types of utilities include the following:

              &      Each utility has a different mix of: 1) the types of meters that
              they purchase from different meter vendors; and 2) residential and
              commercial meters used within their service territory. It is
              necessary to test the reading performance on each of the types of
              meters used in order to ensure that all mixes can be accommodated.

              ®      Various utilities throughout the United States have different
              placement of their meters; for example, some utilities place their
              meters in basements for protection from exposure to elements,
              others place meters outside the structure. The density of the
              metered structures also varies widely, from high—rises to row
              housing to suburban to rural. The resultant variance in interference
              potential will affect the percentage of possible readings the
              handheld is able to obtain.

              *       Utilities intend to use the Itron system to solve the problems
              associated with hard—to—read meters. These meters and problems
              will differ among utilities and must be evaluated to determine a set
              of functions and performance standards that will accommodate all
              of the hard—to—read meters. Such hard—to—read meters might
              include:

                     0      Meters located in locked basements
                     o      Meters in fenced yards


                                      —3—




                  o     Meters in yards with dangerous dogs
                  0o    Hazardous areas such as crime areas
                  0     Meters located inside homes, which cannot be viewed
                        from outdoors
                  0     Customers who will not allow access to meter readers

       *          Integration of automated data collection into manual meter
       reading routes. (Utilities will have differing mixes of reading
       requirements on each route. Each will have performance impact
       and functionality impact on the handheld.)
Data    gatheri          s      ts.

e      Various utilities throughout the country have differing degrees of
       payment collections problems requiring termination of service,
       which could well require this function in the handheld computer.

*      Utilities also differ on their requirements for off—cycle meter
       readings, because customer moves in and out, requiring opening
       and final readings, will vary. These too would have functionality
       requirements for the handheld computer that differ from standard
       meter readings.

®      As to electric utilities, demand usage and time of use metering,
       which involves utilities collecting data on the amount of
       consumption used during varying time periods throughout the day
       and basing rates and incentive programs upon this consumption.

*      Finally, in combination gas and electric utilities, the additional
       functionality and performance requirements that must be evaluated
       are the integration of individual requirements for gas and for
       electric into the same handheld device for combination utilities.

Environmentalfactors.

*      Cold — Performance evaluation will be required to test capabilities
       of reading meters covered with snow and ice, performance of the
       handheld computer in very cold environments.


                                         —4 —




        &       Heat — such as the desert southwest. Again, effects of heat on
                performance and long term reliability must be evaluated.

        &       Moisture/humidity — such as the southeast. The effects of rain and
               high humidity on the reading capability of the handheld computer
               must be evaluated as well as long term reliability of components in
               such environments.

        &      Salt — such as coastal areas. Again, the effects on performance on
               meters with radio modules exposed to salt and salt water corrosion
               as well as long term reliability must be evaluated.

4.      Regulatory
      Various public utility commissions throughout the United States place
requirements on utilities for:

        *      Performance
        *      Cost effectiveness
        *      Levels of acceptable estimated readings
        ®      Number of times per year that meters must be read
        *      Accuracy of readings
        ®      Customer satisfaction

       The DataCap PN units will contribute to solving these issues for utilities.
As the requirements will vary by PUC, so will the testing criteria at different
utilities.




       Determining the degree to which utilities in various situations, as
described above, find Itron‘s OMR technology useful in solving these problems,
and are willing to purchase accordingly, will aid Itron in tailoring the system
before final product design and commercial rollout. Because of the limited
number of units involved, and because they will not be marketed to end—user
consumers, Itron submits that the benefits of the requested market authorization
is in the public interest.



Document Created: 2001-08-15 20:17:20
Document Modified: 2001-08-15 20:17:20

© 2026 FCC.report
This site is not affiliated with or endorsed by the FCC