Georgia Institute of Technology

0674-EX-ST-2019

Status: Pending

N/A
2019-04-25

Documents and Communications: [refresh]

DescriptionCategoryDate
Fee ExemptionText Documents2019-04-25
Question 4 Directional Antenna InformationText Documents2019-04-25
Grant E-mail Notification generated [Jun 5 2019]Correspondence2019-06-05
Grant E-mail Notification generated [Jun 5 2019]Correspondence2019-06-05
Fee ExemptionText Documents2019-04-25
Question 4 Directional Antenna InformationText Documents2019-04-25
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Georgia Institute of Technology

Address
Attention: Office of Legal Affairs
Street Address: 760 Spring Street NW, Suite 324
P.O. Box: 30332
City: ATLANTA
State: GA
Zip Code: 30332-0495
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Westafer
First Name: Ryan
Title: Chief Scientist, Electromagnetics Division
Phone Number: 404-407-8304

Explanation
Please explain in the area below why an STA is necessary:
Transmit a test signal indoors at 250 14th Street, NW, Atlanta, GA on Friday, June 12, 2019 for an internal research and development (IRAD) demonstration.

Purpose of Operation
Please explain the purpose of operation:  Indoor demonstration using transmit and receive antennas.

Information
Callsign: WO9XQD
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 06/07/2019
Operation End Date: 06/14/2019

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Tektronix Signal Generator TSG-4106A 1 No
ETS Lindgren 3115 1 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Ling-Ling Nie
Title of Applicant (if any): VP-Ethics, Compliance & Legal Affairs
Date: 2019-04-15 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
ATLANTA Georgia North  33  47  9 West  84  23  42
Datum:  NAD 83
Is a directional antenna (other than radar) used?   Yes
Exhibit submitted:   Yes
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 3.40000000-3.60000000 GHz FX 1.000000 mW 6.000000 mW M 10.00000000 % 200MW9X CW

14507

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC