Fujitsu Limited

0083-EX-ST-2011

Status: Denied/Dismissed


2011-03-09

Documents and Communications: [refresh]

DescriptionCategoryDate
E-Mail generated [Feb 4, 2011]Correspondence2011-02-04
Dismissal Without Prejudice generated [Mar 9, 2011]Correspondence2011-03-23
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Fujitsu Limited

Address
Attention: Yoshihiko Taki
Street Address: 1-1, Kamikodanaka 4-chome, Nakahara-ku
P.O. Box:
City: Kawasaki
State:
Zip Code: 211-8588
Country: Japan
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Taki
First Name: Yoshihiko
Title: Senior Engineers
Phone Number: +81-44-754-3746

Explanation
Please explain in the area below why an STA is necessary:
Performance of the cellular phone for which we are applying STA was confirmed to fulfill FCC technical requirements. But, FCC type approval has not been applied yet, since it is still in R&D phase. Therefore, for field test in the United State, it is necessary to apply STA here.

Purpose of Operation
Please explain the purpose of operation:  The purpose of this test is to evaluate cellular phones quality, performance and so on in the real cellular phone network. We will receive permission from a network operator to enter their cellular network for this experiment. As for actual method of test, it is very simple, staffs who perform test will make phone call from their cellular phones to cellular phones of other test staffs, just like normal cellular phone use.They evaluate quality of voice calls as well as wireless internet applications.Purpose of this test is user applications investigation on live network in the United States. It is field test of cellular phone product. More ever we are trying to evaluate our terminal for wireless internet applications.

Information
Callsign:
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 03/14/2010
Operation End Date: 04/03/2010

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Fujitsu Limited F-G1 4 Yes
Fujitsu Limited FMP78-GIN 10 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Yoshihiko Taki
Title of Applicant (if any): Senior Engineer
Date: 2011-02-03 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Honolulu Hawaii North  21  10  14 West  157  30  41 Honolulu, HI 50.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 826.40000000-846.60000000 MHz MO 252.000000 mW 252.000000 mW M 0.00001000 % 4M17F9W WCDMA
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1850.20000000-1909.80000000 MHz MO 1000.000000 mW 1000.000000 mW M 0.00001000 % 257MGXW GSM/GPRS

16413

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC