Fenix Group, Inc.

0661-EX-ST-2020

Status: Pending

N/A
2020-04-22

Documents and Communications: [refresh]

DescriptionCategoryDate
E-Mail generated [Apr 22 2020]Correspondence2020-04-22
E-Mail generated [Apr 22 2020]Correspondence2020-04-22
E-Mail generated [Apr 24 2020]Correspondence2020-04-24
E-Mail generated [Apr 27 2020]Correspondence2020-04-27
E-Mail generated [May 17 2020]Correspondence2020-05-17
Incoming generated [May 4 2020]Correspondence2020-05-04
Incoming generated [May 4 2020]Correspondence2020-05-04
Incoming generated [May 4 2020]Correspondence2020-05-04
Incoming generated [May 4 2020]Correspondence2020-05-04
Incoming generated [May 29 2020]Correspondence2020-05-29
E-Mail generated [Aug 5 2020]Correspondence2020-08-05
E-Mail generated [Aug 25 2020]Correspondence2020-08-25
Incoming generated [Aug 10 2020] forwardedCorrespondence2020-08-10
Incoming generated [Aug 27 2020] forwardedCorrespondence2020-08-27
Grant E-mail Notification generated [Sep 8 2020]Correspondence2020-09-08
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Fenix Group, Inc.

Address
Attention: Taylor Thompson
Street Address: 4501 Daly Drive, Suite 300
P.O. Box: 20151
City: Chantilly
State: VA
Zip Code: 20151
Country: United States
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Thompson
First Name: Taylor
Title: COO
Phone Number: 5713809211

Explanation
Please explain in the area below why an STA is necessary:
Fenix Group is conducting LTE integration and testing

Purpose of Operation
Please explain the purpose of operation:  Fenix Group is conducting LTE integration and testing

Information
Callsign: WQ9XKC
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 09/08/2020
Operation End Date: 11/18/2020

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Fenix Group, Inc. BMR 1 Yes
Fenix Group, Inc. BER 1 Yes
Fenix Group, Inc. BER 1 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Taylor Thompson
Title of Applicant (if any): COO
Date: 2020-04-21 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Bethany Oklahoma North  35  32  3 West  97  38  49 5915 Phillip J Rhoads Ave 100.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   Yes
(a) Overall height above ground to tip of antenna in meters:   7620.00
(b) Elevation of ground at antenna site above mean sea level in meters:   1287.00
(c) Distance to nearest aircraft landing area in kilometers:   0.10
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft: trees, man-made buildings
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 703.00000000-803.00000000 MHz MO 10.000000 W 12.000000 W P 10M0M7W OFDM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1350.00000000-1390.00000000 MHz MO 10.000000 W N/A 20M0 OFDM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1710.00000000-2200.00000000 MHz MO 10.000000 W 12.000000 W P 20M0M7W OFDM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1850.00000000-1990.00000000 MHz MO 10.000000 W 12.000000 W P 20M0M7W OFDM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2300.00000000-2507.00000000 MHz MO 10.000000 W N/A 20M0 OFDM

20866

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC