Dynetics, Inc.

0532-EX-ST-2020

Status: Pending

N/A
2020-04-06

Documents and Communications: [refresh]

DescriptionCategoryDate
Exhibit 1Text Documents2020-04-06
Confidential Exhibit 3Text Documents2020-04-06
Confidentiality Request Public Exhibit 2Text Documents2020-04-06
Grant E-mail Notification generated [Apr 16 2020]Correspondence2020-04-16
Grant E-mail Notification generated [Apr 16 2020]Correspondence2020-04-16
Exhibit 1Text Documents2020-04-06
Confidential Exhibit 3Text Documents2020-04-06
Confidentiality Request Public Exhibit 2Text Documents2020-04-06
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Dynetics, Inc.

Address
Attention: Allen R. Wooten
Street Address:
P.O. Box: 5500
City: Huntsville
State: AL
Zip Code: 35814
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Wooten
First Name: Allen
Title: Sr. Staff Engineer
Phone Number: 256-964-4282

Explanation
Please explain in the area below why an STA is necessary:
Please see Exhibits

Purpose of Operation
Please explain the purpose of operation:  Verifification of over-the-air communication operation. Please see Exhibits

Information
Callsign: WQ9XJS
Class of Station: TX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 05/25/2020
Operation End Date: 11/25/2020

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Microhard FCC ID NS914P400 MHS185100 1 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Allen R. Wooten
Title of Applicant (if any): Sr. Staff Engineer
Date: 2020-03-20 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Huntsville Alabama North  34  44  11 West  86  41  6 Temporary Fixed Ground Operations Huntsville AL 0.10
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   Yes
(a) Overall height above ground to tip of antenna in meters:   15.00
(b) Elevation of ground at antenna site above mean sea level in meters:   220.00
(c) Distance to nearest aircraft landing area in kilometers:   6.00
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft: Antenna will be mounted on a building during some experiments. There are superstructures on the building that exceed the antenna height above ground
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 410.10000000- MHz TX 2.000000 W 3.700000 W M 0.00200000 % 3K93F1D See Exhibit 3
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 425.76250000- MHz TX 2.000000 W 3.700000 W M 0.00200000 % 3K93F1D See Exhibit 3

15726

© 2024 FCC.report