Preliminary Report

0203-EX-RR-1999 Post Grant Documents

Diversified Communication Engineering, Inc.

2002-12-02ELS_59168

                    Preliminary Report on the Impact of Northpoint
                        on the Direct Broadcast Satellite Service
                        Based Upon Testing Performed to Date



1         Introduction

          This report has been prepared by EchoStar Satellite Corporation ("EchoStar") following
the limited measuremenits that DIRECTV, Inc. ("DIRECTV") and EchoStar have been able to
conduct during the period when Northpoint has been performing test transmissions in the
Washington D.C. area. It provides the results of those EchoStar measurements and the
conclusions that can be drawn concerning the harmful interference that would occur to Direct
Broadcast Satellite ("DBS") services nationwide if the Northpoint system was deployed across
the USA. It discusses the need for further controlled measurements that would be essential
before the FCC could seriously consider licensing a co—frequency interfering system such as
Northpcint. Finally it provides a very preliminary technical response to the October 7 letter from
Northpoint to the FCC and to an October 1999 Progress Report filed by Northpoint.

        Briefly, Northpoint‘s own submissions reveal that it designed its tests to conceal
interference problems by, among cther things, taking advantage of unique geographical
characteristics (like the predictable lack of DBS subscribers on the Potomac River) that cannot
be the basis for nationwide licensing. Northpoint‘s trumpeting that its testing produced no
consurner complaints is meaningless in light of the test design as well as its failure to provide
adequate notice to DBS providers, effectively preventing them from monitoring Northpoint‘s
rain testing. Even so, Northpoint‘s own purported measurements reveal the occurrence of
harmfui interference into many of the receive sites where Northpoint states it has conducted its
measurements. To explain away its own measurements, Northpoint resorts to the completely
unscientific method of "averaging" ——i.e., it tries to make something of its assertion that the
uverage measurement reflected a slight degradation of DBS signal reception. Even if it were
true, averaging is an invalid method for assessing harmful interference into ubiquitous users, as .
the consumers suffering from the interference cannot take any comfort from the fact that other
consumers may be in a better position.

        In essence, therefore, Northpoint is telling the Commission: you should allow us to
operate throughout the country in the DBS band because we will be able to locate our
transmitters in all U.S. cities so that the worst—impact areas will be rivers and deserts or
parklands; and you should disregard the harmful interference received from Northpoint by a
DBS subscriber if other DBS consumers receive less interference. These are unreasonable
reguests ard Notthpoisat‘s own claims cannet sustai:; a Com»m:ssion decision to lisense its
smteni.

       In any event, what iittle monitoring was afforded by Northpoint‘s dubious methods has
revealed a picture that is even bleaker than Northpoint‘s own measurements. Even in these
circumstances, Northpoint‘s "result—onented" testing produced harmful interference that
exceeded by many orders of magnitude anyacceptable standard.



                                           Page 1 of 25


         In its aggressive public relations campaign, Northpoint has been discounting the technical
concerns of DBS operators. According to Northpoint, these concerns hide EchoStar‘s "true"
reason for opposing Northpoint‘s system — fear of competition. This carefully orchestrated
campaign of innuendo and intimation may help Northpoint portray itself as the righteous new
entrant, but it is irresponsibly false. EchoStar has long welcomed competition from, and has
never opposed, terrestrial wireless technologies for delivering multichannel video. EchoStar did
not oppose the Commission‘s proposal and eventual decision to allocate 1,000 MHz of spectrum
for Local Multipoint Distribution Services. Nor did EchoStar object to the Commission‘s
proposal to allow digital wireless cable services (Multichannel Multipoint Distribution Services).
EchoStar‘s objection to Northpoint is not based on fear of competition, but on fear that
Northpoint‘s service would wipe out reliable DBS reception for many subscribers. This
technical report, documenting the harmful interference to result from Northpoint, and the further
technical studies being prepared by EchoStar, are all based on technical concerns alone, and
should help further dispel Northpoint‘s innuendoes about the DBS operators‘ motives.




       The tests performed to date by Northkpoint have been designedto conceal the interference
proclems that would exist if a system such as Northpoint was ever (.eployfld across the USA.
We will explair this assertion in this section.                        —

        There were fundamental flaws with the design of the Northpoint tests, as they were
performed in the Washington D.C. area. The problems can be divided mto three categories, as
follows:                                                                       >

1.   Crucial information about the test parameters was not provided to the DBS cperators either
     befors or during the tests. The July 6, 1999 Northpoint Test Plan and subsequent periodic
     test plans, which were the only source of information concerning what Northpoint would be
     doing during the tests, were vague, and gave no specific information that would allow the
     DBS operators to know the important characteristics of the transmissions at any partxcular
     time. Specific areas of uncertainty were as follows:

        e   The transmit EIRP was planned to be varied between +12.5 dBm and +37.5 dBm, a
            range of25 dB (or 316 to 1 variationin transmitted power).‘ When the interference
            was measured by DIRECTV and EchoStar it was uncertain as to where in this range
            of transmit power Northpoint was actually operating. If indeed the actual EIRP was
            +12.5 dBm, and Northpoint plans to operate its transmitters in the field at +37.5 dBm,
            then the interference would be 25 dB higher than that measured here.




!       In fact the contents of the Northpoint STA leads to the conclusion that the EIRP could be as high as +40
        dBm, based on the stated maximum power of +390 dBm and peak antenna gain of +10 dBi. {see the Request
        for Special Temporary Authority of Diversified Communications Enginecring, Inc., date—stamped March
        12, 1999).



                                                 Page 2 of 25


        e   While Northpoint was required by the conditions to its experimental authorization to
            disclose the orientation of its antenna, "including the beam tilt if appropriate,"
            Northpoint‘s test plans do not disclose beam tilt (i.e., elevation relative to horizontal)
            of the Northpoint antenna. Indeed Northpoint proposed to adjust the tilt, depending
            on the results they were obtaining, throughout the test period. Clearly the beam tilt
            was a variable that Northpoint could use to try to "tune out" the interference to the
            DBS receivers, which is a totally unsatisfactory test philosophy. This fact alone
            illustrates how the Northpoint test was designed and implemented to produce the best
            possible results (from the Northpoint perspective) for interference into the DBS
            receivers, rather than to provide an objective assessment of the interference situation.

            Without knowledge of the Northpoint transmit antenna beam tilt we cannot determine
            where the EchoStar test receive site was located in terms of the gain of the Northpoint
            antenna, and therefore have no idea whether the interference results are maximum or
            minimum.

        e   There is no information available to the DBS operators from the Northpoint test plans
            that details the building blockage and foliage effects that could have been artificially
            shielding the DBS receivers in certain directions. The building blockage we are
            referring to here is that which results from the structure of the building on which the
            Northpoint test transmitter was located. There may well have been (and most likely
            there were) one or more structures on the rooftop of the USA Today that would have
            completely blocked the transmissions from the Northpoint transmitter in some
            azimuth directions. In addition, the rooftop itself would have blocked the signal path
            ir directions towards points on the ground that were closer than about 1000. yards or
            more from the transmitter DBS receivers in such locations are particularly
            vulnerable to interference from the proposed Northpoint system, 2and it is crucially
            important to know the details of the signal path for such situations. Indeed,
            Northpoint‘s concluding report concedes that dishes observed on buildings adjacent
            to the USA Today building "were naturally shielded from the Northpoint transmitter
            by the buildings to which these dishes were attached," and that the Northpoint
            transmit antenna "was installed four feet down the face of the building" in order to
            protect two DIRECTV dishes at the rooftop of the building . This is another
            example of the way in which Northpoint has deliberately distorted the interference
            problem that would arise if the Northpoint system was ever freely deployed.

       e    Northpoint also deprived DBS operators of the ability to monitor its testing.
            Particularly for its rain testing, Northpoint did not give notice of its plan until
            September 16, 1999 (the date on whose morning it had already commenced testing),
            despite the one—week advance notice requirement in its authorization.

2. The Northpoint test site (on top of the USA Today building in Rosslyn, VA) appears to have
    been deliberately chosen because of its unique characteristics. The first and most important



2      Northpoint October 1999 Report at 8.


                                              Page 3 of 25


transmitter would have to be located in the Potomac River! Figure 1 below illustrates this
fact.
                 Figu re 1    — Map Showing the Area Around the Northpoint Test Transmitter
                           §s >        aael
                                           1               woe 2
                                                           ltnCC                  UJ

                                         p;-                   ~   Th 3.          £
                                                                                              1
                                           i                       Echo S tar interference
                                               |                    measure ment site




                                                                                        THE hA#




                x
                  _Buckingharm
                ark
                    Northpoint tes t
                    trans mitter site                  .
                                                   on.Vijage
                *A 0              Virginia Highlgfids®
                       |                  Anrag® Hilla



   The USA Today building is surrounded on the north and east sides by wide stretches of
   the Potomac River. In addition, the land areas that were most seriously affected by
   interference, in the case of DBS service from the EchoStar satellite at 61.5°W.L ., were
   totally uninhabited. Northpoint itself emphatically points out in its October 1999 Report
   that "[t]he tiny area within the 15 dB contour of Northpoint‘s transmitter is completely
   located in the Potomac River," and that, while a portion of the 20 dB contour falls over
   land, "it is important to note that this area is primarily uninhabited . .. ."°. According to
   Northpoint, "{[t)his installation is typical of the way in which Northpoint installations will
   be made in the real world."*. Of course, however, proximity to substantial rivers and
   uninhabited federal lands cannot be a solid basis for nationwide licensing of a ubiquitous
   urban service.

   In the direction where the EchoStar test receiver was located, which was approximately
   south—east from the Northpoint transmitter, EchoStar and DIRECTV had to perform tests




   Northpoint October 1999 Report at 4—5. See also Letter from Northpoint counsel to FCC dated October 7,
    1999 (page 6, 2 full paragraph).

   October 1999 Report at 5.


                                               Page 4 of 25


       at a distance of more than 1.2 miles from the Northpoint transmitter. As Northpoint
       nghtly pomts out* the relationship between interference and distance from the Northpoint
       transmitter is a simple predictable characteristic; the interference level varies inversely as
       the square of the distance. Therefore, had EchoStar been able to measure the interference
        at 0.6 miles from the Northpoint transmitter (which was unfortunately in the middle of
       the Potomac River) the measured interference would have been 4 times (or 6 dB) higher.
       Northpoint claims to have performed tests at shorter distances from the test transmitter by
       obtaining federal and other permits (which of course DIRECTV and EchoStar did not
       have the time to receive), and we will address these measurements in our more detailed
       response to the October 1999 Report.

       While on the one hand EchoStar is relieved by the proximity of the Potomac River and
       uninhabited federal lands to Northpoint‘s transmitters, as it minimized the disruption of
       DBS service to actual customers, itfor
                                          is entirly inappropriate Northpin



3. The Northpoint measurement campaign appears to have placed great importance on the
   measurement of BER (Bit Error Rate) in the DBS receivers, on the presumption that this is
   the sole indicator of harmful interference. This simplistic approach to assessing the
   interference from a planned Secondary service to an operating Primary service is completely
   wrong. and ignores the fundamental aspects of digital RF links (whether they be satellite or
   terrestrial). These links need, and must have, adequate link margin to provide the required
   level of service to the customers. This issue is so fundamentally important that we will spend
   some time discussing it here.

    Northpoim would have us believe that, as long as the Northpoint interference does not force
    the DBS receiver below threshold (where the BER is suddenly reduced), even in clear—sky
    conditions, thenthe interference should be acceptable. Northpoint‘s argument is essentially
    that harmful interference only occurs when the interference reaches these levels under clear
    sky conditions. As an example of how ludicrous this is,—let us consider a DBS link that has a
    clear sky margin of 6 dB above thresnold. If the Northpoint interference reduces the clear—
    sky link margin by say 5.5 dB to a value of 0.5 dB above threshold, the Northpoint approach
    would conclude that this interference level should be acceptable. In practice such an
    interference level would reduce the availability of the DBS link from approximately 99.8% to
    approximately 97%. This would mean that for 3% of the year thelink would bebelow
    threshold and the DBS subscriber would have no service. 3% of the year amounts to 263
    hours per year or, on average, 43 minutes per day, which would be a totally unacceptable
    service quality. If this level of service were acceptable then DBS operators would have
    implemented significantly lower satellite EIRP levels, by almost 6 dB, therebyallowing four
    times as many transponders per satellite than are currently possible, with huge savings.

    Clearly, something is wrong with the Northpoint approach to interference. Northpoint



5      Letter from Northpoint counsel to FCC dated October 7, 1999 (page 6, 1" full paragraph).


                                                Page 5 of 25


     repeatedly refuses to consider the availability of the individual DBS links in its assessment
      interference. DBS operators have spent billions of dollars in the form of high power
     satellites just to achieve the required link availability for all of their subscribers (not just
     average availability as Northpoint suggests). Northpoint argues that the DBS individual li1
     availability is of no consequence and that everything will be fine as long as the Northpoint
     interference does not cause the DBS receiver to go below threshold when tested under clea
     sky conditions.

     Therefore it is absolutely essential that the FCC takes into account the DBS individual link
     availability in any assessment of whether the interference from a proposed Secondary servi
     is harmful or not. It is no coincidence that reduction in link availability is the fundamental
     measure used by the ITU (and the FCC) in assessing the acceptability of interference level:
     from the proposed NGSO systems. This matter is addressed further in section 6 below.




        _ As the Commission is aware DIRECTV and EchoStar have conducted field
  measurements of interference during some of the pericd when Northpoint was transtnitting tes
  s,gnals from the experimental transmit site in Rosslyn, VA. These measurements are describe
 in detail in Annex 1.

         The measurements consistently recorded harmful interference over two days, August 1
  and 12"", and again on September 8"", on transponder 18 (Ku frequency 12.47186 GHz) of
| Ec.hoStars satellite located at 61.5° WL. This interference was measured at the "poio field" —
  an area in the Northeast corner of West Potomac Park just south of Independence Avenue and
  about 1/3 mile south of the Lincoln Memoria!l This location is approximately 1.2 miles trom
  Northpoint test transmitter in Rosslyn, VA

         The Northpoint interference was measured by means of the DBS receiver signal streng
  meter, in conjunction with a spectrum analyzer and associated equipment. The clear—sky sign:
  strength readings during these days were consistent with values of 93 (August 11), 93 (August
  12) and 94 (September 8). With the Northpoint transmitter turned on, however, the signal
  strength was reduced to 90 (August 11 and 12) and 86 (September 8). This corresponds to
  signal strength degradation as high as 8 counts. The differences of the data measurements
._between August 11 and 12 and the measurements on September 8 appears to be due to the fac:
  that the DIRECTV test antenna, which was located immediately adjacent to the EchoStar
  antenna, was shielding the Northpoint interference on August 11 and 12, and it was therefore
 removed prior to the September 8 measurement.

         The EchoStar receiver signal strength meter was carefully calibrated during the tests s«
 the 8 point reduction in the meter reading, due to Northpoint interference, was verified as bein
 equivalent to approximately 2.1 dB reduction in the signal—to—noise ratio of the EchoStar sign:
 As shown in Annex 1 this level of interference can be equated to a C/I in clear—sky conditions
 approximately 16 dB.




                                              Page 6 of 25


       There are several important points to note concerning this level of measured interferen
as follows:

        e     The interference level closer to the transmitter will vary inversely as the square of t
              distance. Therefore, at a distance of 0.6 mile the interference would be 6 dB highe:
              (C/I = 10 dB, link degradation =5.3 dB), and at 0.3 mile the interference would be
              dB higher (C/I = 4 dB, link degradation = 10.1 dB). Of course these latter two case
              could not be measured because they would have been located in the Potomac Rive:

        e     Because of the unknown factors about the Northpoint test transmissions, as discuss
              in section 2 above, we cannot be certain that the measured interference levels are tt
              worst that existed. There could well be locations with even higher levels of
              interference.

4      AnalysisConclusionsEchoStar/DIRECTVMeasurements
       In this section we will demonstrate the effect that the measured Northpoint interferenc
has on the EchoStar DBS service from the 61.5° W.L. satellite for subscribers in Washington
n.C.

        Table 1 gives a detailed link budget for EchoStar DBS service to Washington D.C. fro:
the EchoStar satellite at 61.5° W.L. This is the "best case" link budget in that it represents the
situation where the DBS receive antenna is perfectly aligned to the satellite, and the satellite is
providing the EIRP levels as currently measured (i.e., "beginningof life"). This link budget i:
therefore .mphcable to the actual EcheStar test set—up at the "pole field" durmg the Northpoin!
tost iransmissions.

        The link budget in Table 1 shows four cases in the four data columns (some of the ent:
are common across all four columns). The first two data columns show the situation without
Northpoint interference, with one column for clear—sky conditions and one column for rain fac
conditions. The two right hand columns show thesituation as it exists with the Northpoint
interference levels that were actually measured at the polo field. The Northpoint interference
leveis are entered into the link budget as a clear—sky C/I of 16.0 dB, and as a rain—faded C/I of
13.75 dB (assuming that there is negligible rain attenuation on the short interference path).

        From Table 1 note that the clear—sky margin is reduced by 2.0 dB from 6.1 dB to 4.1 d
due to the Northpoint interference. Under these conditions the link will support a 3.0 dB rain
attenuation (99.893% availability) without Northpoint interference and 2.25 dB rain attenuatic
(99.803% availability) with Northpoint interference. The link unavailability is therefore
increased from 0.107% (i.e., 100%—99.893%) to 0.197% (i.e., 100%—99.803%), which is an
increase in unavailability of 84.1%, far in excess of the aggregateallowance for all NGSO
systems which is 10%. The more conventional measure for assessing interference for static
situations is the increase in system noise temperature (AT/T), which is also calculated in Tabl
In this case the AT/T is 57.4%, almost ten times greater than the standard criterion for accepta
interference between co—Primary services, which is a AT/T of 6%.




                                              Page 7 of 25


                               Table 1 —Link Budget — Washington D.C. — Best Case

                                                              ~_—| —Without                                      With
                  Link Parameters                                   Northpoint                                Northpoint
                                                                   | GearSky |                Rain. _       Clear Sky            Fain
       Link Geographical Characterisics:
         Satellite Longitude                   (°East)                                               —61.5
         Rx E/S Longitude                      (°East)                                               —71.0
         Rx E/S Latitude                       (°North)                                              386.5
         Fx E/S Altitude (AMSL)                (km)                                                  0.010
         Rx E/S HVU Rain Zone                  (MV)                                                     K
         Rx E/S Range to Satellite             (km)                                                 ~37,588
         Rx E/S Elevation to Satellite         (°)                                                   42.6
       Downlink (per carrier):
         Camer Frequency                       (GHz):                                               12.450
         EIRP per Carier towards Rx E/S        (dBW)                                                 52.2
         Clear—Sky Atrnospheric Losses         (dB)                                                  0.50
         Rain Attenuation                      (dB)                        060 ~| 3.06                        06.00 | 225
         Free Space Loss                       (dB)                                                     5.8
         Fix E/S Antenna Diameter              (m)                                               0.45
         Rx cS Antenna Gain (69% eff.)         (dB)                         J                    33.8
         Rx E/S Pointing and Other Losses       (dB)                                              0.06
         Receive Power                         {dBW)          *            —120.           ~123. %-                 4     | —122.
         Rx Noise Temperature                  (K)
         Sky Noise Temp                        (K)                              32            160              32         I|oOOOf3G
          {C/T) Thermal Downlink               (dBW/K)             4171                    7.3               1411 |} 1461
       Total Link:
         Carrier Noise Bandwidth               (KkHz)                                               24,000;                        —
         (CON) — Themai Uplink                 idB)               2 [TtOO 480 000OOOO
         {C/N) — Therma! Downlink              (dB)                  |__13.7
                                                                           TOO7E[147[OOB7C
         (Cl) — Other BSS Assignments          (dB)                                              — 30.0
        . (C/1) — Northpoint Interference      (dB)                   100                     100            16.00           13.75
          (CIN} — Tocal Actual                 (dB)       _        ~—13.6                     7.5            11.6             7.5
         (CVN) — Tetal Required                (dB)                    |                                .8                         >
         Margin                                (dB)                61                  1      0.0             41| 0.6
      ~~Resulting
                                               (%)                                   99.893                             99.803
         using rrng Rain Model
       [in
       due to Northpoint Interference        (%)                                                     84.1
       mmm                                   (%)                                                     57.4
       due to Northpoint interference (AT/T)                       ’




       A reliable DBS system needs margin, not only to compensatefor rain attenuation but
to allow for other factors which degrade the link, such as mispointing of the DBS receive
antenna and other degradations of the DBS antenna and receiver performance over time, as w
as degradation of the satellite High Power Amplifier (HPA) over the lifetime of the satellite.
These factors must be taken into account when offering a reliable long—term service to millio1
of low—cost DBS receiver installations. Table 2 shows a link budget, applicable to the



                                                 Page 8 of 25


Washington DC receive location, for the situation where these real—life factors are taken into
account, resulting in a link that achieves the minimum 99.7% availability objective. We refer to
this link budget as the "marginal case" (compared with the "best case" link given in Tablel1).

          In Table 2 the satellite EIRP is reduced by 0.6 dB to represent lifetime degradation, a 1
dB factor is included to take account of receive antenna mispointing and the receive system nois
temperature is assumed to be 15 K higher than in the best case. Under these conditionsthe link
achieves the assumed target availability of 99.7%. When the measured Northpoint interference
is included the link availability is reduced to 99.235%, which is a 155% increase in
unavailability for the EchoStar service. The AT/T, resulting from the Northpoint interference, is
51.6%, still almost nine times greater than the well established 6% criterion.           |

       Note that the C/I for the Northpoint interference in Table 2 is set to be 1.6 dB lower than
in Table 1, to reflect the fact that the wanted signal is 1.6 dB lower. This correctly assumes that
the interfering signal power is the same for the marginal case as it was for the best case link
budget.




                                             Page 9 of 25


                       Table 2 — Link Budget — Washington D.C. — Marginal Case

                                                                    Without                           With
              Link Parameters                                     Northpoint                    Northpoint
                                                                Gear Sky         Ran        Cear Sky |         Rain
    GeograpnrearCharactenenes                                        s                                 ——
       Satellite Longitude                     (°East)                                 —61.5
       Rx E/S Longitude                        (°East)                                 «77.0
       Rx E/S Latitude                         (°North)                                38.5
       Rx E/S Aititude (AMSL)                  (km)                                    0.010
       Rx E/S ITU Rain Zone                    {MV)                                     K
       Rx E/S Range to Satellite               (km)                                    37,588
       Rx E/S Elevation to Satellite           (°)                                      42.6
     Downlink (per carrier):                                                     |
       Camier Frequency                        (GHz)                                   12.450
       EIRP per Carrier towards Rx E/S         (dBWw )                                  51.6
       Clear—Sky Atmospheric Losses            (dB)                                     0.50
       Rain Attenuation                        (dB)                .00     _| 1.83             0.00 [ 1.12
       Free Space Loss                         (dB)                                         .8 —
       Rx E/S Antenna Diameter                 (m)                                      0.45
       Rx E/S Antenna Gain (69% eff.)          (dB)                             33.8
       Rx E/S Pointing and Other Losses         (dB)                             1.0
       Receive Power                           (dBW)            ~122.0 |—~123.8      ~122.0 | —123.1
       Rx Noise Temperature                    (K)                                      100
       Sky Noise Temp                          (K)                32             120            32              90
       (CT) Thermal Downlink                   (dBW/K)          —143.2       1472             —143.2         ~145.9
     Total Link:
        Camer Noise Bandwidth                  (kHz)                                   24,000
       (C/N) — Thermal Uplink                  (6B)                                     33.
       (C/N) — Thermal Downlink                (dB)              1116      | 76— T _11.6| 89 |
       (C/1) — Other BSS Assignments           (0B)                                     30.0
       (C/l) — Northpoint Interference         (dB)              100          100              14.40         13.2
       (C/IN) — Total Actual                   (0B)              11.5         KA                9.7           1.8
      ‘(C/N) — Total Required                  (dB)                           .          .5
       Margin                                  (dB)               4.0      _| 0.0               2.2     _|     0.00
      ~—Resulting
       using ITY Rain Model                    (%)                      99.700                        99.235
       Increase in Unavailabiity
     due to Northpoint interference            (%)                                     155.0
    System                                     (%)                                     51.6
       due to Northpoint interference (AT/T)



     The key results obtained in Table 2 above are shown in Figure 2 as a function of the
itance of the EchoStar receiver from the Northpoint transmitter. The scaling with distance has
en based, consistent with Northpoint‘s statements,© on the assumption that the interference
rel will vary inversely as the square of the distance from the Northpoint transmitter, using the
sasured interference levels at (conservatively) 1.2 mile distance as the reference point.



     Letter from Northpoint counsel to FCC dated October 7, 1999 (page 6, 1" full paragraph).


                                                Page 10 of 25


         The solid line in Figure 2 (see left hand axis for scale) shows the resulting EchoStar
  ilability, which drops dramatically below approximately 1 mile to the point where the
  10Star service is unavailable at approximately 0.7 mile. At this distance the interference from
   Northpoint transmitter causes such degradation to the EchoStar link that there is no margin
  , even in clear—sky conditions, and the EchoStar link fails to operate.

       The dotted line in Figure 2 (see right hand axis for scale) shows the increase in the
  vailability of the EchoStar link as a result of the introduction of the Northpoint interference.
  : increase is already 100% (i.e., ten times more than the aggregate NGSO interference
  erion) at a distance of approximately 1.3 miles, and rises steeply to 1000% at a distance of
  roximately 0.9 mile. Even for a distance of 3 miles the increase in unavailability is
  roximately 13%, still greater than the aggregate NGSO interference criterion of 10%.

                          Figure 2 — Northpoint Interference to EchoStar Receivers — Washington DC

                                         —          Left Hand Axis . . . .Right Hand Axis :

        100                                                                                                                               1000
  s
  mm

  E
        30 |oc c c c c c c

        80        |             2s e .
                                             (%
                                        n BoD D l l l on l e l ue           e e e e e 2 e e e e e s ce e c e e 2 2 2 e 2 2 2 e c °e Oy

                                             __--E ------------------------------------------ f800
                                                                                                                                          900

                                                                                                                                                 §

  100   70 Lulcslcll lc s l2 fos m n n n e e n e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e e eS — 700 5;‘
‘ ?g    80 L.2 222222222                           LE                   en e e e e e e e e e e e e e e e e e e e e e ds 600 gg
  §     50                                          &            _                                                         _              500 32
  5:    40    {                               Li        l
                                                        \\
                                                                                                                               —.    L 400 £°@
                                                                                                                                                 3   =
  8     30            _            se         fe         Ne e                                                                  —..L 300 & 5
  a                                                          >                                                                                   0
  &0    20 Lolslc .ccscc cccfi css mM en n n n e n en un e e e n e e e e e e en e e e e e e e e e e e e . 200 2
  &S                            *.
        10 Lc s2ll i i fp c i2 2tMww oys n en n ns n n n n n n n se e e e. 100 ~—
         0                                                                           --.f..          -....-.-..--.                        0



              0.0                0.5                    1.0               1.5               2.0                 2.5                 3.0

                                        Distance from Northpoint Transmitter (miles)




     In Figure 3 the AT/T of the EchoStar receiver, as a result of the Northpoint interference,
  hown, also as a function of the distance of the receiver from the Northpoint transmitter. The
  ling with distance is the same as that used in Figure 2 above. The reference point for this data
  1e AT/T value of 51.6% for the case of 1.2 mile distance, as derived in Table 2 above. The
  mally accepted interference criterion, in the case of co—Primary services, is a AT/T value of
  . Even at a distance of 3 miles, the Northpoint interference causes a AT/T of approximately




                                                                     Page 11 of 25


                     Figure 3 — EchoStar Receiver AT/T Caused By Northpoint Interference


         160                                                       —                             .                  ,
         140 .

         120 L ul ol lc clclccl Xucccccc c css e

         100 .
; T /T
 (%)      80 |

          6O L 22 c ul lc clull uc ulc cce es M     e l l en n n e e e e e n e e e e e e e e e e e e e es e e e e

         40 L.

         20 |



               0.0             0.5            1.0            1.5              2.0              2.5              3.0 _
                                       Distance from Northpoint Transmitter (miles)                                     ‘



    EchoStar will soon submit an analysis using the limited observations that were possible
ing the Northpoint experiment to measure the effect from Northpoint‘s operations on
ioStar‘s DBS service in other U.S. cities.


    Conclusions
    The DIRECTV/EchoStar measurements of interference show conclusively that the
posed Northpoint system would cause harmful interference to EchoStar subscribers at
‘ances of several miles from the Northpoint transmitters. The effect of this interference will
y at different locations across the USA depending on the rain margin that exists on the
10Star links at those locations. These variations in rain margin have been deliberately
igned into the EchoStar system in order to closely match the climatic regions of the USA.
er regions ofthe USA will suffer significantly greater from Northpoint interference than the
shington DC situation that was measured.

    The results presented here are based on limited measurements made by EchoStar in the
shington DC area. For various reasons associated with Northpoint‘s selection of its test
ismitter site, EchoStar was unable to comprehensively measure the Northpoint interference
a range of possible interference geometries. Therefore we cannot be certain that the results
sented here represent the worst interference levels that existed. It is quite possible that even
her levels of interference could exist in practical situations.




                                               Page 12 of 25


      The measured results, and the conclusions based on further analysis, should come as no
  prise. EchoStar and other parties have consistently informed the FCC that the introduction of
  biquitous terrestrial service, such as the proposed Northpoint one, into the frequency bands       *
  sady in use for DBS services, is simply not practical. The resulting interference to the
  umbent Primary DBS service would be disastrous and the billions of dollars of investment
  :ady made by the DBS operators would be effectively wasted.




       The conclusions drawn in this report have a weakness: we cannot be certain that the
  1al interference levels that might occur if the Northpoint system were ever deployed would
   be higher than those measured here. On the other hand, we know, with a high degree of
  ifidence, that they will never be lower. This weakness is a direct result of the poorly defined
  | controlled test transmissions that Northpoint has conducted, and the deliberate choice by
  thpoint of a test site and test arrangement that conceals the true interference that would occur
  ractice.

      In light of this fact, EchoStar believes that further tests would more accurately define and
  10nstrate the actual interference levels that would occur in a real—life deployment scenario.
  wever, EchoStar also believes that the evidence presented here, together with the previous
~ missions to the Commission by the DBS operators and their proponents, demonstrates
  ady the incompatibility of the proposed Northpoint system with the fully operational DBS
  tems.

      Further tests should be based on the following principles:

      The DBS operators should be in control of the test transmitter so they fully understand its
      technical characteristics, and the features of the test installation.

      The test transmitter should use the actual Northpoint transmit antenna so as to ensure that
      its sidelobe characteristics are truly representative of the antennas Northpoint is
      proposing to deploy. Northpoint should define the possible pointing directions and the
      beam tilt for this antenna that are the basis of their proposed system.

      The site chosen for the test transmitter should be one that permits full access up to quite
      close range for the DBS test receivers in all azimuth directions (some exceptions to this
      could be permitted provided they were for very limited ranges of azimuth directions).

      The structure on which the test transmit antenna is installed should be such thatthere is
      no building blockage in any azimuth direction and for quite high elevation angles from
      the DBS test antennas to the test transmitter (some exceptions could be permitted
      provided they were for very limited ranges of azimuth directions).




                                           Page 13 of 25


    to

     Many of the points raised by Northpoint in its letter to the FCC have been addressed in
ne detail above. These will be reiterated here for completeness. In addition, the following
tion will address all the other points of contention arising from the Northpoint letter.

        Northpoint‘s refusal to consider significant loss of link availability as harmful
        interference goes against all common sense and normal engineering practice.‘ It sets
        the scene for a whole new regime whereby Secondary services could be introduced in
        bands where there are incumbent Primary services, cause devastation to the reliability
        of those services, and still not be considered as causing harmful interference.

        Northpoint‘s assertion that "... the "peak" signal strength recorded by the consumer
        set top box is a transient value well above the average value ofthe signal strength
        indicator ...‘is simply incorrect. As Northpoint and its engineers well know, rain
        attenuation, which causes the more significant link attenuation (compared with that
        due to clouds alone) is a phenomenon with a well known statistical pattern, whether it
        be on a satellite or a terrestrial radio link. The effect of these statistics is that the link
        attenuation is very low for large percentages of the time, and therefore the signal
        strength meter on a DBS receiver will in fact be near to the peak value for the vast
        majority of the time. As an illustration of this, for an EchoStar DBS receiver located
        in the Washington DC area and receiving signals from the EchoStar satellite at 61.5°
        W.L., the rain attenuation will be less than 0.5 dB for 96.8% of the time, and less than
        1 dB for 99.0% of the time (based on ITU rain models). This means that the signal
        strength meter reading will only drop more than 0.5 dB below peak for an average of
        46 minutes in a 24 hour period, and more than 1 dB below peak for an average of 14
        minutes in a 24 hour period. In fact the average rain attenuation (i.e., for 50% of the
        time) is a small fraction of a dB, and so the Northpoint statement cited above is
        completely untrue and very misleading.

      _ Northpoint also suggests that there could be significant fluctuation in the received
        signal level from the satellite due to variations in the EchoStar receive antenna
        orientation. This is simply not the case. The test antenna was a standard 45 cm
        diameter one, and therefore insensitive to any small variations in the pointing of the
        antenna. The test antenna was carefully pointed to the EchoStar satellite and
        consistently gave the same signal strength meter readings in the absence of
        Northpoint interference.

        It is therefore highly unlikely that, between the consecutive measurements made by
        EchoStar of the Northpoint interference, the satellite signal path attenuation changed
        by any measurable amount, particularly in light of the fact that the weather was good



    Letter from Northpoint counsel to FCC dated October 7, 1999 (page 4, last paragraph).

    Letter from Northpoint counsel to FCC dated October 7, 1999 (page 5, 1" paragraph).



                                            Page 14 of 25


    during the test results presented here. This statement is supported by the detailed
    measurement data given in Annex 1, and particularly by reference to Figure A—3 of
    that annex, where the exact timing of the signal strength meter readings is given. It
    can be seen that the measurements were made at approximately two to three minute
    intervals," and the signal strength meter reading returned to the peak level
    immediately after the Northpoint interference occurred, on both occasions when the
    Northpoint transmitter was turned on during the test period.

    In conclusion, the EchoStar measurements are not concealing any inherent variation
    in the received signal level from the satellite, but clearly demonstrate the effect of the
    Northpoint interference alone.

    Northpoint also questions whether in fact the Northpoint transmitter was turned on at
    times when claimed DIRECTV and EchoStar claim they measured Northpoint
    interference.‘" As explained in Annex 1, EchoStar took great care in its
    measurements to ensure that it knew when the Northpoint transmitter was turned on
    and when it was off. A special Northpoint monitoring antenna was set up which
    clearly showed the Northpoint signal spectrum on a spectrum analyzer whenever the
    Northpoint transmitter was turned on. For this reason it was not necessary for
    DIRECTV and EchoStar to contact Northpoint (or DCE) during the tests to request
    that the Northpoint transmitter be turned on or off.

    There is therefore no doubt that the interference measured by the DBS operators was
    due to the Northpoint transmissions, and that alone. Northpoint‘s statementthat "... it
    is possible (probably likely) that the data was not in fact collected when the
    Northpoint transmitter was on and then off ..." ‘‘ is completely unfounded and
    factually incorrect.

    Northpoint suggests that the measurements reported here were based on "simulated"
    interference using an additional reflector to redirect the interfering signal into the
    EchoStar antenna. This is not the case. Annex 1 reports on the use of an aluminum
    shield that was used to block the interfering signal path, as an additional means of
    verifying the source of the interference. This shield was not used when the actual
    measurement of the Northpoint interference level was made.

    Northpoint makes an argument in its letter that suggests that harmful interference
    should be considered to be acceptable if it only occurs in a small part of the service
    area."" This is a totally unacceptable philosophy and the Commission should firmly


This fact confirms that Northpoint‘s claims that "... it is likely that the DBS datafor "Northpoint on" and
"Northpoint off" was collected several hours apart ..." is completely incorrect.

Letter from Northpoint counsel to FCC dated October 7, 1999 (page 5, 2 and 3"" full paragraphs).

Letter from Northpoint counsel to FCC dated October 7, 1999 (page 5, last paragraph).

Letter from Northpoint counsel to FCC dated October 7, 1999 (page 6, 1" full paragraph).


                                         Page 15 of 25


    reject this notion.‘* The DBS satellite service exploits one of the greatest assets of
    communications satellites — the ability to provide ubiquitous service of the same high
    quality over the entire service area. To suddenly take away this key feature would be
    devastating for the DBS service operators. The harmful levels of unacceptable
    interference have been shown in this report to occur up to several miles distance from
    the Northpoint transmitter. In a typical urban or suburban area, where it would be
    expected that numerous Northpoint transmitters are proposed to be located, the
    Northpoint transmissions would cause harmful interference to large numbers of DBS
    subscribers — a totally unacceptable situation.

    We are in agreement with Northpoint regarding its observation that West Potomac
    Park, where the EchoStar interference tests were performed, is uninhabited (from a
    DBS subscriber point of view).‘* Again, the illusory expectation that NorthPoint
    could likewise locate all of its transmitters in deserted areas or close to rivers in the
    midst of the densely populated areas it wants to serve cannot be a rational basis for
    nationwide licensing.

    Northpoint states that "... Emboldened by their inconsistent (emphasis added) and
    erroneous (emphasis added) data, the DBS operators then proceed to draw
    conclusions about the impact ofthe Northpoint system on DBS as a whole ..." . The
    results presented in this report are neither inconsistent nor erroneous, as is evidenced
    by the detailed measurement data and careful analysis presented here. Neither are our
    conclusions inappropriate concerning the impact of the Northpoint interference on the
    DBS service as whole. The only extrapolation we have used beyond the actual
    measurement data is to assess the variation in interference level as a function of
    distance from the Northpoint transmitter. In drawing that inference, we have used the
    simple "inverse square of distance" propagation law that Northpoint itself makes
    reference to.‘" In summary there are no "leaps of faith" required to fully understand
    the EchoStar measurement results.

    Northpoint makes much about a semantic difference between "link margin" and "rain |
    margin."‘‘ We agree that rain attenuation raises the receive system noise temperature
    of the DBS link, and we have never claimed otherwise. Indeed this factor is fully



Neither is it clear that such harmful interference would occur in only a small part of the service area,
especially in a situation where multiple Northpoint transmitters were operating to provide contiguous
Northpoint service across the Northpoint service area.

Letter from Northpoint counsel to FCC dated October 7, 1999 (page 6, 2 full paragraph).

Letter from Northpoint counsel to FCC dated October 7, 1999 (page 6, 3"" full paragraph).
Northpoint states that "... DBS undoubtedly knows that simple attenuation ofthe Northpoint signal as it
travels through space ..." in the letter from Northpoint counsel to FCC dated October 7, 1999 (page 6, 1"
full paragraph).

Letter from Northpoint counsel to FCC dated October 7, 1999 (pages 6 and 7).


                                          Page 16 of 25


        taken account of in all the link budgets presented above. Nevertheless, even with this
        factor included the harmful interference due to Northpoint interference is a reality and
        occurs at the levels given above.

    e   Again Northpoint makes a completely inaccurate statement that "... the DBS
        operators base a 0.5 dB link degradation on an interpretation ofthe signal strength
        pointer which has no basis infact ....""® The signal strength meter of the EchoStar
        test receiver was carefully calibrated, as explained in Annex 1, and it is a perfectly
        accurate way of measuring the DBS link degradation due to theNorthpoint
        interference. The calibration curve in Figure A—4 of Annex 1 is quite linear, and
        gives accurate relative C/N measurements within a very small fraction of a dB. As
        Annex 1 shows, the link degradation measured under essentially clear—sky conditions
        was 2.1 dB (not 0.5 dB as Northpoint suggests), a value that is much greater than the
        possible error of the measurement set—up.

    e   Northpoint essentially argues the interference criterion applied to NGSO interference
        (i.e., 10% increase in unavailability of the DBS link) is totally inappropriate for use in
        assessing the allowable interference from Northpoint.‘" Secondary services are, by
        definition, services that are not expected to significantly interfere with Primary
        services. Northpoint‘s argument that it would be within its bounds as a Secondary
        service provided it does not cause "serious degradations or repeated interruptions" to
        a DBS link clear—sky is complete nonsense. It is equally possible for
—       the DBS operator to unequivocally demonstrate that there will be times for all DBS
        receivers when they are critically near to losing signal (due to rain fades), and the
        introduction of the Northpoint interference forces the DBS receiver to lose signal.
        Clearly in this case the Northpoint interference is causing a "serious degradation" of
        the DBS link, and therefore is rightfully judged as causing harmful interference.
        Therefore it is necessary to move beyond the simple definition of harmful
        interference in order to determine acceptable levels of interference, and this is the
        reason why interference criteria, such as the one applicable to NGSO, have been
        developed.

    e   Northpoint resorts to some necessarily creative ideas when suggesting that perhaps
        the 10% increase in unavailability criterion could be interpreted as an average across
        all the DBS subscribers rather than a level to protect all subscribers *°. Unfortunately
        the assertion that this is the way the criterion is used in the NGSO interference
        situation is completely wrong. The 10% criterion as applied to NGSO systems is
        supposed to be met for even the most disadvantaged DBS link, and this is the basis
        for the submission of sensitive DBS links to the ITU‘s Joint Task Group 4—9—11
        which has been responsible for studying this matter. The reason for this is again that



    Letter from Northpoint counsel to FCC dated October 7, 1999 (page 7, 1" full paragraph).

    Letter from Northpoint counsel to FCC dated October 7, 1999 (page 7, 2nd paragraph).

    Letter from Northpoint counsel to FCC dated October 7, 1999 (page 8, .1" paragraph).



                                            Page 17 of 25


    DBS is a ubiquitous service that must be protected across its service area, and not just
    some percentage of it. If this "average" idea were to be accepted it would logically
    mean that a DBS subscriber has a 50% chance of getting the proper service quality
    that he expects, and which the DBS service provider offers —— a horrifying prospect for
    the DBS operator (and the subscriber).

e   Northpoint correctly makes the observation that the interference from Northpoint is
    essentially constant with time, and is therefore unlike the time—varying NGSO
    interference *‘. This would indicate that a more conventional interference criterion,
    such as that used in the past for static interference situations, should be used. In this
    case the well—established AT/T criterion, which limits the interference to 6% of the
    clear—sky system noise temperature, could be a candidate criterion. Alternatively, the
    kind of interference criterion included in the ITU‘s Appendix S$30 Plan, which limits
    the interference to a value that does not degrade the clear—sky C/(N+1T) by more than
    0.25 dB, may be more appropriate in this DBS scenario. However, it can easily be
    shown that the imposition of either of these two criteria would place much greater
    interference constraints on a service such as Northpoint. In fact, the DBS operators
    are being generous to Northpoint by even suggesting that the 10% unavailability
    criterion might be appropriate.

e   Northpoint states ** that the DBS operators erroneously reference international
    proceedings in their discussion of Appendix S30 which suggest that terrestrial
    systems should not operate in the 12.2 — 12.7 GHz. The existence of both BSS and
    terrestrial FS allocations in the international table of frequency allocations in the 12.2
    —— 12.7 GHz band does not mean that BSS and FS services are compatible within the
    same service area and operating at the same frequency. It is well recognized
    internationally that the ITU Appendix $30 Plan for BSS does not support the use of
    terrestrial FS services in countries where assignments in the Plan are made for the
    provision of the BSS. The only reason there is a co—primary ITU allocation to the
    BSS and FS in this band is that certain countries were not assigned the entire 500
    MHz of spectrum in the case of Regions 2 and 3, or the entire 800 MHz of spectrum
    in the case of Region 1. In countries where all the frequencies were not assigned for
    BSS that country is able to use those unassigned frequencies for other services such
    as FS, the MS (terrestrial mobile service) or BS (terrestrial broadcasting service),
    which are also allocated on a co—primary basis, but clearly not all compatible with
    each other on a co—frequency co—coverage basis. It is for this reason that the
    Appendix S$30 interference criteria to protect the BSS from the terrestrial FS takes the
    form of a power flux density limit at the edge of the BSS service area. In the USA
    and in the countries that border the USA (Canada and Mexico) the entire 500 MHz,
    i.e. all 32 BSS channels, were assigned in the Appendix S$30 Plan for the BSS and




Letter from Northpoint counsel to FCC dated October 7, 1999 (page 8, 2"" paragraph).

Letter from Northpoint counsel to FCC dated October 7, 1999 (page 8, last paragraph).



                                        Page 18 of 25


        therefore terrestrial FS in these countries was never envisioned in the 12.2 — 12.7
        GHz band.




     This document, which was only recently made available, provides Northpoint‘s own
asurement results and conclusions regarding the interference arising from the Northpoint tests
Nashington DC. We will be providing a detailed response to this report as soon as possible,
 in the meantime we will address here the fundamental failings in this report, which
»ctively destroy all of the arguments of Northpoint.




Northpoint‘s self—contradictions in this respect are alarming. On the one hand Northpoint
claims that it deliberately constructed its test so that there were no inhabitants in the areas
that would be most affected by harmful interference from the Northpoint test transmitter.
Then Northpoint argues that the lack of subscriber complaints somehow vindicates its claim
that the Northpoint system will not cause any problem to actual DBS subscribers if it were
ever to be deployed across the USA. This inconsistency is remarkable, but it permeates
throughout the entire story told by Northpoint.




Most of Northpoint‘s conclusions are based on the premise that statistical averaging is a
suitable way to assess whether the Northpoint interference is acceptable or not. This is
completely inappropriate for assessing the impact to the DBS service from a proposed
Secondary ubiquitous service such as Northpoint. Earlier in this report we have explained
the crucial importance to the DBS operator in offering a ubiquitous service, and we will not
repeat those arguments again here. Statistical averaging is a totally invalid method for
assessing harmful interference into ubiquitous users, as it would destroy the presumption that
a subscriber can rely on the service quality offered by the DBS operator. Instead a subscriber
could find that, in fact, the DBS dish service he has just purchased will not work reliably (if
at all) where he has planned to install it. In such a situation the subscriber will take no
comfort from the fact that other subscribers are in a better position.




Northpoint is proposing a radically different approach to assessing compatibility between
different radio services. Their approach completely ignores the fundamental measure of
service quality in the service that would be interfered with, which is to determine the impact
on the quality of the affected link. Northpoint is effectively saying that all the technical
bases on which compatibility is normally assessed, both by the FCC and in other jurisdictions


                                       Page 19 of 25


throughout the world, are no longer appropriate. Instead a crude averaging across all the
variables Northpoint can think of is the basis of the Northpoint proposal. It is not surprising
that Northpoint has to resort to this, as their proposed system was clearly completely
incompatible with DBS from the outset, necessitating this revolutionary stance.




                                       Page 20 of 25


     A team of DIRECTV and EchoStar engineers monitored Northpoint‘s experimental
ismissions in the Washington, D.C. area during the week of August 9 and the week of
tember 6, 1999. The tests were primarily performed at the "polo field" — a convenient
ition on the northeast corner of West Potomac Park, just south of Independence Avenue and
ut 1/3 mile south of the Lincoln Memorial. The coordinates of the polo field are Latitude
53.169‘N and Longitude 77°02.631‘°W. The polo field test site was more than 1.2 miles to the
th east of Northpoint‘s test transmitter which was located on top of the USA Today building
tosslyn, VA.

loment       Descripti

    Figure A—1 gives the block diagram of the equipment used to calibrate the EchoStar
grated receiver decoder (model 4000) and to measure the Northpoint interference. This
ipment consisted of an 18 inch (45 cm) DBS antenna, LNB (Low Noise Block
vnconverter), IRD (Integrated Receiver Decoder) Model 4000, a two—way splitter, a video
1itor and a spectrum analyzer. The DBS antenna was aligned with EchoStar‘s satellite
ited at 61.5°W.L. The LNB down—converted the 500 MHz R.F. signal from the 12.2—12.7
z band to an IF frequency range of 950—1450 MHz. The signal was then routed from the
mna/LNB to the IRD via a two—way splitter and 100 feet of RG—6 coaxial cable. The other
ut ofthe splitter was routed to a spectrum analyzer via 6 feet of RG—6 coaxial cable. A DC
k and 50—to—75 ohm transformer were used on the input to the spectrum analyzer.

                         Figure A—1 — EchoStar Calibration System Block Diagram
         ran<farmer




                                               Transformer


                                                    Spectrum Analyzer
                                               pe

                                                                                  Monitor

                                                    Integrated Receiver     im
                                                     Decoder (4000)




                                            Page 21 of 25


ibration   Proced

    Initially the intrinsic noise levels of the equipment were measured. Power levels were
orded, using a spectrum analyzer, for the spectrum analyzer noise floor, LNB noise floor and
snna noise threshold signal levels. The spectrum analyzer noise floor was measured with the
ut to the spectrum analyzer removed. The LNB noise floor was measured when the antenna
; pointed well away from the 61.5°W.L. orbital position to clear sky. The spectrum analyzer
ings used are summanized in Figure A—2. The measured spectrum analyzer and LNB noise
)r values were approximately —73.5 dBm and —71.1 dBm for a 24 MHz bandwidth,
ectively. The antenna signal strength reading was approximately 40 for these measurements
»re no satellite signal was present.

                                                   Figure A—2: Spectrum Analyzer Settings


                                            Parameters                                         Settings
                                                                                              950 MHz




                pan
            S                                                                                       .0

     The EchoStar receiver signal strength meter was then calibrated as follows. Firstly, the
i0Star antenna pointing was adjusted to perfectly align with the 61.5°W.L. orbital position,
. the carmer—to—noise (C/N) ratio was measured on the spectrum analyzer and recorded
sther with the signal strength meter reading. Then the EchoStar antenna was incrementally
ited away from the 61.5°W.L. orbital position and the changes in C/N ratio, and
responding signal strength meter readings, were recorded. The results obtained are shown in
ure A—3.

                Figure A—3: Calibration of the EchoStar IRD 4000 Signal Strength Meter
                  Signal Strenght Reading




                                            0.00   2.00   4.00    6.00      8.00    10.00   12.00        14.00   16.00
                                                                         CIN (dB)




                                                                 Page 22 of 25


   Measurements

        The EchoStar signal strength meter was used to measure the signal—to—noise ratio for the —
   owing three cases: (1) Northpoint transmitter OFF, (2) Northpoint Transmitter ON (with
   0Star antenna unshielded, (3) Northpoint transmitter ON (with EchoStar antenna shielded).
   : "shielded" case was measured using a large piece of aluminum material held up so as to
   ipletely block the possible Northpoint interfering signal from the EchoStar DBS antenna
   rture.

       The EchoStar signal strength meter readings from a sequence of measurements are given
   ‘igure A—4. The initial signal strength reading was 93/94 (first three diamond shaped data
   ats) with the Northpoint transmitter turned off. The signal strength degraded by
   Toximately three counts when the Northpoint transmitter was turned on, unshielded (first two
   are shaped data points). When the Northpoint transmitter was shielded, the signal strength
   reased to the original signal strength of 93/94 (first triangular shaped data point).

                             Figure A—4: EchoStar Signal Strength Meter Readings
                                                          (9/9/99)
         95


         94


         93


         92


     % a1
     &                                                                                                 —@—x OFF
     2 90                                                                                              —B— TX ON—
     i                                                                                                     Tx OnSh
     " a




              B                                    S   es

         tXA      9272   FY°X14   —#°ROZ   9K00   93853     #41:     G44:.38   94731   Y502M   98%17



         At this point it was realized that the DIRECTV antenna was possibly shielding the
  10Star antenna from the interfering Northpoint signals. The DIRECTV antenna was then
  a0ved from its antenna mount and the signal strength measurements were continued. The
  nal strength reading remained at 93/94 (second triangular shaped data point) with the
  rthpoint transmitter turned off. The signal strength then decreased to 86 (eight count
  :rease) when the Northpoint transmitter was turned on, unshielded (second two square shaped
_ a points). When the Northpoint transmitter was then shielded, the signal strength meter
  ding returned to 93/94 (third tmangular shaped data point).



                                                  Page 23 of 25


     It is not exactly clear why the signal strength meter readings differed for the cases when
 Northpoint transmitter was turned on. Two plausible explanations of why the data changed
i1d be either (a) the Northpoint transmit power was changed, or (b) the DIRECTV antenna
s shielding the Echostar antenna from the highest level of interfering signal when it was
unted next to the EchoStar antenna. We believe it was due to the latter.

     Using the calibration curve of Figure A—3, the C/N ratios were calculated for a range of
nal strength meter readings from 95 down to 80. From these C/N values (which can also be
isidered as C/(N+1)), the C/N degradation due to the interference was calculated, and from this
 carrier—to—interference (C/T) was calculated. These calculations are shown in Figure A—5
ow. From this data it can be seen that an 8 point reduction in the signal strength meter
ding is equivalent to a reduction in C/N (from 13.8 to 11.7 dB) of 2.1 dB, which results from
/1 of 16.02 dB.




                                       Page 24 of 25


     Figure A—5: Calculation of C/I Based on Signal Strength Meter Reading



copmyerangeol _Stovam_|           OM         OMdedradaton.| tervedo69
                    as           14.03
                    94            13.8        AS


     —1             93            13.5               0.3             _26.68


     2             _a2            13.3               0.5           22.90

     —3             91             13                0.8           __24.40

     4              30            12.8                1               19.75

     —9             89            12.5               1.3              18.88


     —6             88            12.2               1.6              17.77


     —7             87            11.9               1.9              16.84


     —8             86            11.7               2.1              16.02


     —9             85            11.4               2.4              15.52


    =10             84            11.1               2.7              14.83


    —11             83            10.8               3                14.19


    —12             82            10.5              3.3               13.60


    —13             81           10.25_             3.55              13.05


    —14             80             10               3.8               12.61




                               Page 25 of 25


                  CERTIFICATION OF PERSON RESPONSIBLE
               FOR PREPARING ENGINEERING INFORMATION


       I hereby certify that I am the technically qualified person responsible for
preparation of the engineering information contained in the foregoing submission, that I
am familiar with Part 100 of the Commission‘s rules, that I have either prepared or
reviewed the engineering information submitted in this pleading, and that it is complete
and accurate to the best of my knowledge and belief.




                                                       Aechark Gamits
                                                       Richard J. Barnett, PhD, BSc
                                                       Telecomm Strategies, L.L.C.
                                                       4806 Fort Sumner Drive
                                                       Bethesda, Maryland 20816
                                                       (301) 229—0204


Dated: October 28, 1999