Cisco Systems

1118-EX-ST-2015

Status: Grant Expired Due to New License

WJ9XDC
2015-10-15

Documents and Communications: [refresh]

DescriptionCategoryDate
Grant E-mail Notification generated [Oct 16 2015]Correspondence2015-10-16
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Cisco Systems

Address
Attention: David Case
Street Address: 4125 Highlander Parkway
P.O. Box:
City: Richfield
State: OH
Zip Code: 44720
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Case
First Name: David
Title: Senior Technical Leader
Phone Number: 330 523 2139

Explanation
Please explain in the area below why an STA is necessary:
Short term test less then 2 weeks.

Purpose of Operation
Please explain the purpose of operation:  To verify radio hand offs between Wi-Fi and LTE systems on railroad trains.

Information
Callsign: WJ9XDC
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 10/13/2015
Operation End Date: 11/10/2015

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
VoyagerCell 4GAP1000X 6 No
Klas Telecom EnodeB 12 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): David A. Case
Title of Applicant (if any): Senior Technical LEader
Date: 2015-10-09 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
North      West      5km at Transport Technical Center Pueblo CO
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 698.00000000-704.00000000 MHz MO N/A 1.000000 W M 5M00X7X LTE
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 728.00000000-734.00000000 MHz MO N/A 1.000000 W M 5M00X7X LTE
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 746.00000000-757.00000000 MHz MO N/A 1.000000 W M 10M0X7X LTE
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 746.00000000-757.00000000 MHz MO N/A 1.000000 W M 5M00X7X LTE
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 776.00000000-787.00000000 MHz MO N/A 1.000000 W M 10M0X7X LTE
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 776.00000000-787.00000000 MHz MO N/A 1.000000 W M 5M00X7X LTE

City State Latitude Longitude Mobile Radius of Operation
North      West      5km at Transport rail center of Test Center
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 824.00000000-849.00000000 MHz MO 2.000000 W N/A M 10M0XXX OFDM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 824.00000000-849.00000000 MHz MO 2.000000 W N/A M 200KG7W CDMA
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 869.00000000-894.00000000 MHz MO 2.000000 W N/A 10M0XXX OFDM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 869.00000000-894.00000000 MHz MO 2.000000 W N/A 200KG7W CDMA
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 869.00000000-894.00000000 MHz MO 2.000000 W N/A 200KG7W CDMA
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2500.00000000-2570.00000000 MHz MO 2.000000 W N/A M 10M0XXX OFDM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2500.00000000-2570.00000000 MHz MO 2.000000 W N/A M 20M0XXX OFDM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2620.00000000-2690.00000000 MHz MO 2.000000 W N/A M 10M0XXX OFDM
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 2620.00000000-2690.00000000 MHz MO 2.000000 W N/A M 20M0XXX OFDM

39153

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC