DescriptionCategoryDate
Dismissal Without Prejudice generated [Jun 07, 2001]Correspondence2002-12-23
Test parametersText Documents2001-05-24
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Cisco Systems

Address
Attention: David A. Case
Street Address: 320 Springside Drive
P.O. Box:
City: Akron
State: OH
Zip Code: 44333
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Case
First Name: David
Title: Senior Radio Compliance Engineer
Phone Number: 330-664-7396

Explanation
Please explain in the area below why an STA is necessary:
System is a Part 15 Carreir Current system being developed for testing of concept and for preliinary EMC evaluationas well as final FCC verification which must be done on site per FCC rules. All EMI trouble shooting will need to be done on site as well as review of operation feasilbility. System will consist of pole mounted units which will be connected to several systems installed in several faciliities.

Purpose of Operation
Please explain the purpose of operation:  To set up and test several experimental Carrier Current transmitters systemns for both regulatory evaluation and project concept evaluation. System will consist of several types of installation to meet the typical set up for both FCC compliance testing and product evaluation. System will need to be evalated in several regional locations to determine feasiblilty of system.

Information
Callsign: WC2XQW
Class of Station:
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 08/01/2001
Operation End Date: 05/31/2002

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Cisco Systems CPE Units 12 Yes
Cisco Systems Head Ends 40 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): David A. Case
Title of Applicant (if any): Senior Radio Compl
Date: 2001-05-23 11:46:56.86

Station Location
City State Latitude Longitude Mobile Radius of Operation
North      West      Nationwide
Datum:  NAD 27
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1.70500000-38.00000000 MHz N/A N/A