Incoming generated [Feb 21 2018]

0066-EX-CN-2018 Correspondence

Capella Space Corporation

2018-02-21ELS_205265

From: Ken Oyadomari

To: Behnam Ghaffari
Date: February 21, 2018

Subject: FCC File No. 0066-EX-CN-2018
----------------------------------------------------------------------------------------------------------------
Message:

Behnam,

I've made a small amendment to our application based on your previous comments. I've also added
Exhibit 2, which describes the ground station performance and locations. Finally, please remove [7
Capella Space Corp List of Appendixes Exhibits].

With respect to first item on my previous email, we are going to process those frequency bands entered
on the application (Form 442). Please disregard this item.
Understood

As for second item, if these 2 bands are being used only to receive then there is no need to put them on
the application. Our licenses are being authorized only for transmission. However, I noticed for
9400-9900 MHz band, you have entered 8222.4 kW and 0 ERP. Please clarify this.
The 9400-9900 MHz band with the 0 ERP is also a receive frequency. I have amended our application to
to remove the receive frequencies.

Now, is there ground station(s) associated with your operation? If yes, you would need to go back to your
application and open new location(s) and enter the required parameters for the intended location(s) (i.e.
coordinates, freq bands, ERP, emission designator(s)).
All of the ground station locations are outside of the US and utilize pedestal antennas. To simplify this
submission I've added Exhibit 2 to our application. This Exhibit describes the ground station parameters


Provide the following information with respect to the satellite(s):
1. Satellite coverage (Narrow Beam(NB) or Earth Coverage(EC))
Narrow Beam

2. Receiver antenna gain
Gain: 4.2dBi

3. Beamwidth of the receiver antenna at the half power points
Beamwidth 3dB: 102degs

6. The number of satellites in the system
Satellites covered in conventional experimental license: 2

4. Apogee and Perigee in kilometers
5. Orbital period in hours
7. Inclination angle
Two launches:
- SSO-A: SSO 10:30 575km
- PSLV 9: SSO 10:00 630km


Please provide the following information with respect the transceiver ground-station antenna(s):

1. Transmitter antenna gain (dbi)


EIRP: 44.8 dBW
Gain: 35.7dBi

2. Beamwidth of transmitter antenna at the half-power points
~ 2.8 degs

3. Transmitter antenna azimuth
4. Elevation of transmitter antenna MSL (in meters)
5. Elevation of transmitter antenna AGL (in meters)
The ground station antenna is on a pedestal and does not have a set azimuth or elevation. These
parameters change as the ground station antenna tracks the satellite.