CP Communications

0373-EX-ST-2020

Status: Pending


2020-02-28

Documents and Communications: [refresh]

DescriptionCategoryDate
E-Mail generated [Feb 28 2020]Correspondence2020-02-28
AFTRCC Coord CP79680Pre Coordination Document2020-02-28
Dismissal Without Prejudice generated [Mar 18 2020]Correspondence2020-03-18
Dismiss E-mail Notification generated [Mar 19 2020]Correspondence2020-03-19
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  CP Communications

Address
Attention: Henry Cohen
Street Address: 1401 Front St
P.O. Box:
City: Yorktown Heights
State: NY
Zip Code: 10598
Country: United States
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Cohen
First Name: Henry
Title: FCM
Phone Number: 800.762.4254

Explanation
Please explain in the area below why an STA is necessary:
Applicant is a television microwave and communications equipment rental company which provides video, audio and communications for broadcast, satellite broadcast and cablecast of sporting and other large special events. Applicant has certain LTTS, BAS and private wireless licenses for this purpose, however, the spectrum demands at large events, along with the the limited LTTS/BAS spectrum, makes it necessary to make coordinated, temporary use of additional channels in the 1.4GHz and 3200-3550 MHz band. Such is necessary to have sufficient video relay from RF cameras at numerous locations within large venues (such as golf courses, arenas, stadiums, convention centers), and/or highly congested events while allowing normal concurrent ENG use of the BAS spectrum .

Purpose of Operation
Please explain the purpose of operation:  Provide audio and portable video at Google developer conference.

Information
Callsign:
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 03/31/2020
Operation End Date: 04/07/2020

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Various Various 4 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Henry Cohen
Title of Applicant (if any): FCM
Date: 2020-02-28 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
San Francisco California North  37  47  2 West  122  24  4 Moscone Center 0.16
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 1445.00000000- MHz MO N/A 250.000000 mW M 10M0D7W
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 1465.00000000- MHz MO N/A 250.000000 mW M 10M0D7W
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 3200.00000000-3550.00000000 MHz MO N/A 1.000000 W M 10M0D7W

17257

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC