Broad Comm Inc.

0079-EX-ST-2018

Status: Grant Expired Due to New License

WM9XFC
2018-01-18

Documents and Communications: [refresh]

DescriptionCategoryDate
Grant E-mail Notification generated [Jan 18 2018]Correspondence2018-01-18
Grant E-mail Notification generated [Jan 18 2018]Correspondence2018-01-18
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Broad Comm Inc.

Address
Attention: Louis Libin
Street Address: 382 Forest Avenue
P.O. Box:
City: Woodmere
State: NY
Zip Code: 11598
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Libin
First Name: Louis
Title: President
Phone Number: (516) 374-6700

Explanation
Please explain in the area below why an STA is necessary:
Please explain in the area below why an STA is necessary: This regards a request by Broad Comm, Inc. (Broad Comm) for Special Temporary Authority (STA) to allow use of 4 frequencies in the 6 GHz band for the purpose of providing video coverage of Super Bowl 52nd being held at the U.S. Bank Stadium, Minneapolis, MN for the period of February 1 through 5, 2018 including setup, testing and the actual event. The specific frequencies being requested are needed to be compatible with the equipment normally used in conjunction with this type of event. The FCC has granted Broad Comm and others similar requests for several previous events. The number of frequencies and units requested is minimum to satisfy the needs of this activity

Purpose of Operation
Please explain the purpose of operation:  Provide video coverage of Super Bowl 52nd for the period of February 1 through 5, 2018

Information
Callsign: WM9XFC
Class of Station: MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 02/01/2018
Operation End Date: 02/05/2018

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Nucomm or equivalent 23PT3-L02-1TO 4 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Louis Libin
Title of Applicant (if any): President
Date: 2018-01-15 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
North  44  58  25 West  93  15  27 U.S. Bank Stadium, Minneapolis, MN 1.00
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 6437.50000000- MHz MO N/A 50.000000 mW M 8M00D7W
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 6462.50000000- MHz MO N/A 50.000000 mW M 8M00D7W
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 6487.50000000- MHz MO N/A 50.000000 mW M 8M00D7W
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 6512.50000000- MHz MO N/A 50.000000 mW M 8M00D7W

19186

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC