Technical Description

0245-EX-ST-2018 Text Documents

Booz Allen Hamilton

2018-02-12ELS_204703

                          Request for Special Temporary Authority

Booz Allen Hamilton, requests an FCC-issued Special Temporary Authority (STA) in
order to conduct technical development, testing, and demonstration of LTE
communications for special facility security operations.

Booz Allen Hamilton is actively engaged in the development of LTE technology for
Public Safety and FirstNet applications and is extending this technology into a number
of defense- and government-related applications.

The proposed operations will be conducted from March 5 through March 30, 2018 on
and around the United States Marine Corps facility located on Camp Pendleton,
California. Operations will be itinerant and temporary in nature and will involve setting
up a temporary LTE network to provide network communications in a military
environment. The goal of the LTE demonstration is to provide a validated, credible, and
repeatable demonstration of how LTE technology can be used to provide advanced
communications to a variety of security and public safety operations.

This environment is directly analogous to operating environments that will be faced by
FirstNet in terms of providing advanced communications for public safety users
operating in rural and industrial areas. As such, supporting this demonstration will
provide useful information to FirstNet, Industry, and US Government agencies involved
in emergency and disaster response such as the US Coast Guard, National Guard,
FEMA, and other US military branches.

The proposed operations would consist of one temporary deployable single-sector 700
MHz Band 14 LTE macrocell.

The vendor providing the macrocell and user equipment is General Dynamics. Booz
Allen Hamilton, will be providing system integration and testing services and will be
responsible for the over the air operation of the system.

Band 14 is desired for conducting this testing for the following reasons:

          700 MHz provides optimal propagation characteristics for maximum coverage
           range.
          Band 14 is currently awaiting deployment in areas outside the BTOP test sites
           and thus presents a low probability of causing or receiving interference during
           testing.

Benefits to FirstNet in providing this STA concurrence include:

          Formal testing under rigorous test conditions will provide useful information
           on LTE user experience and system operation under real-world conditions


Request for STA Technical Description                                                      1


          Operational testing of vendor LTE devices will provide useful feedback for
           further product development.
          Firsthand demonstration to the US Government of the benefits of LTE
           technology that may inform future relationships between the Government and
           FirstNet.

The technical parameters of the proposed system include:

          10 MHz Bandwidth, 2 x 2 MIMO
          2 x 20W
          Downlink frequency band 758 – 768 MHz
          Uplink frequency band 788 – 798 MHz
          Single-sector omnidirectional temporary base station operation
          Antenna height above ground of no more than 6 meters
          User devices to include integrated modems, USB dongles, and LTE routers
           for use with laptop computing devices and video sources and displays
          Operation of mobile devices within 5km of base station location

The proposed operation is not expected to cause any harmful interference since the
FCC ULS database does not show any co-channel licensed users of the 758-768 and
788-798 MHz Band 14 spectrum within 70 kilometers of the proposed operational
location in Oceanside, CA. The LA-RICS LTE system is the nearest BTOP site and
they will be notified via the California SWIC..

As with all STA operations, Booz Allen Hamilton understands that operations are
secondary to those of licensed users such as FirstNet, and that demonstration
operations must cease in the event that FirstNet or other licensed users experience
interference. Booz Allen Hamilton will retain the ability to shut the system off in the
event that interference is reported. The single point of contact for this STA operation is:


               Alan Kolackovsky
               Senior Technologist
               Booz Allen Hamilton
               619-847-8029
               kolackovsky_alan@bah.com




Request for STA Technical Description                                                     2



Document Created: 2018-02-12 11:18:44
Document Modified: 2018-02-12 11:18:44

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC