Boeing

1583-EX-ST-2020

Status: Pending

N/A
2020-10-12

Documents and Communications: [refresh]

DescriptionCategoryDate
E-Mail generated [Oct 12 2020]Correspondence2020-10-12
FAA Coordination 117MhzPre Coordination Document2020-10-12
FAA Coordination 118MhzPre Coordination Document2020-10-12
Test DescriptionText Documents2020-10-12
Incoming generated [Oct 12 2020]Correspondence2020-10-12
Grant E-mail Notification generated [Oct 28 2020]Correspondence2020-10-28
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Boeing

Address
Attention: Lance Benjamin
Street Address:
P.O. Box: 3707
City: Seattle
State: WA
Zip Code: 98124
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Benjamin
First Name: Lance
Title: Spectrum Manager
Phone Number: 206-544-1788

Explanation
Please explain in the area below why an STA is necessary:
Requesting STA to perform necessary aircraft testing.

Purpose of Operation
Please explain the purpose of operation:  Testing equipment. The test is performed in order to verify non-interference (electromagnetic compatibility) between the VHF Data Broadcast (VDB) and VHF communication equipment by using the highest VDB broadcast frequency (117.950 MHz) and transmitting VHF communication at the lowest frequency (118.000 MHz). This test will be conducted during a GLS approach into the approved airfield.

Information
Callsign: WR9XEA
Class of Station: FX MO
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 11/09/2020
Operation End Date: 05/09/2021

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
TELERAD EM9009 1 No
Rockwell Collins Inc VHF-2100 1 No

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Joel Thorsheim
Title of Applicant (if any): Spectrum Management- Senior Manager
Date: 2020-10-12 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
Great Falls Montana North  47  28  58 West  111  22  14
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 117.95000000- MHz FX N/A 50.000000 W M 14K0G7D

City State Latitude Longitude Mobile Radius of Operation
Great Falls Montana North  47  28  58 West  111  22  14 25nm of ground station, Great Falls, MT 46.50
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
Modified 118.00000000- MHz MO N/A 25.000000 W M 6K00A3E

19179

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC