Exhibits 1 & 2

3545-EX-PL-1993 Text Documents

BNR, INC.

1999-11-18ELS_24086

                                     BNR INC.

                                  EXHIBIT NO. 1

This is a request for Experimental License Authorization under Section
5.202 (i) of the regulations for the development of radio technique,
equipment, operational data or engineering data related to an existing or
proposed radio service.

Particulars   of    rati

The Microcell Live Air Testing program will be a continuous experimental
development program used to develop new and improved radio communication
systems and equipment. The test program will focus primarily upon developing
microcell systems inside buildings that will expand the versatility of Cellular radio
equipment and will improve the spectrum efficiency of Cellular systems. BNR will
closely coordinate testing with the A and B Cellular operators to avoid
interference and to improve the next generation of Cellular equipment.

  Frequencies Used

  Initially BNR plans to test on the following Cellular frequencies:
  877.110 MHz —— Channel #237
  877.740 MHz —— Channel #258
  878.370 MHz —— Channel #279
  879.000 MHz —— Channel #300
  890.340 MHz —— Channel # 678
  890.970 MHz —— Channel # 699
  869.550 MHz —— Channel # 1008

  The testing program will not use more than seven (7) Cellular channels during
  any period of time. However as the Dallas area Cellular A and B operators
  may need to revise spectrum usage for their customer needs from time to time,
  BNR seeks authority to test in the Cellular spectrum in the following ranges;
  824 to 849 MHz and 869 to 894 MHz.

  Maximum R.F. Output

  The maximum R.F. output of portable transmitters will not exceed the power
  limitation for commercially available cellular phones, being six hundred (600)
  milliwatts. All portable transmitters used in the testing program will transmit
  with power of six (6) milliwatt (7.8dBm) or less.

  Base station maximum output is 1W at the transmitter. Maximum ERP at
  antenna will be 12dBm.

  The radio signal strength from base station emissions measured 100 meters
  outside the building shall be —95dBm or less.


 Maximum Effective Radiated Power (from the antenna)

 12dBm

 "Mean" or "Peak"

 Mean

 Type of Modulation

 Standard Cellular AMPS operation, FM

 Description of Necessary bandwidth

 Standard Cellular AMPS operation, 30kHz

                       Summary of Technical Information

   A 16.5 dB clutter loss due to buildings was included in the calculations of the
   expected received signal strength. The ERP used at the testing sight is the
   maximum available using the equipment provided by Novatel. The cell site
   specific data is as follows:

   Latitude                             32° 58‘ 47" N
   Longitude                            96° 42‘ 36" W
   Site Elevation at Ground Level  649‘ (197.82 Meters) (above sea level)
   Peak Building Height (NT Tower) 884‘ (289.44 Meters) (above sea level)
   Antenna Height (BNR Building)        35° (10.67 Meters) (max height, inbuilding)
   Antenna Height (NT Tower)            60‘ (18.29 Meters) (max height, inbuilding)
   Antenna Type/Gain                    Directional; 6dB Gain
   TX Line Length (BNR Building)        300 Feet
   TX Line Length (NT Tower)            600 Feet
   Transmitter Power                    1 watt (Maximum)
   Combiner Loss                        10 dB
   Duplexer Loss                        2 0B
   TX Line Loss (0.5" inch foam)        7.2 dB (BNR Building)
   TX Line Loss (0.5" inch foam)        14.4 dB (NT Tower)
   Connector Loss                       2.50B
   Attenuator range                     1—10dB
   ERP                                  12dBm

The test location is the BNR/NT office complex, composed of a three story BNR
building whose street address is 2201 Lakeside Blvd., Richardson, Tx., and the
connected fourteen story NT tower whose street address is 2221 Lakeside
Blvd., Richardson, Texas. Both buildings have the same Latitude and longitude
coordinates. In the NT Tower, the RF will only be radiated within the 5th floor, at
a height of 60 ft above ground level.


The Test location is on the East side of U.S. Highway 75 (a/k/a Central
Expressway). There are numerous office buildings (whose total heights above
sea level are higher than the maximum height of antennas to be used in the
test) that are located between the test sight and the nearest aircraft landing
area. Further natural formations and trees between the test sight and the
nearest aircraft landing area will tend to shield the antenna from aircraft and
minimize the aeronautical hazard to aircraft.


                                    BNR INC.

                                  EXHIBIT NO. 2

BNR INC. is the Research and Development Subsidiary of Northern Telecom,
which is one of the largest manufacturers of telecommunication equipment in the
World. As part of the world wide development of enhanced telecommunication
equipment the Richardson laboratory is initiating an in—depth testing program to
develop microcell equipment that will use traditional cellular frequencies, for
inbuilding, low—power cellular uses and operation. Microcell development can
increase the versatility of Cellular equipment for the general population and can
increase the spectrum efficiency of equipment using the frequency channels
allocated to the A and B cellular providers in the United States.

program will test in—building, low—power, microcell systems for radios
operating in the current cellular spectrum bands. The program will include
in—depth testing of the following three major areas for microcell systems:

       1) Inbuilding RF propagation for the United States Cellular spectrum.
       2) Coexistence of inbuilding, low—power, transmissions with the existing
          Celico Macrocell systems.
       3) Determination of spectrum re—use factors for Microcell applications.

The testing will be conducted entirely within the new 1,000,000 sq. ft. BNR/NT
complex located at 2201 and 2221 Lakeside Blvd., Richardson, Texas.

The testing program will initially use the following equipment:
1. NT4O based MTSO switch incliding the Intelligent Cellular Peripheral (ICP)
2. One (1) Cell Site ICRM based Controller
3. Eight (8) NT Radios operating at 1 watt max. The maximum ERP at the
   antenna will be 12dBm.
4. Associated cellsite equipment :
    + High stabilility Master Ocsillator, 4.8MHz, providing a stable clock source
      for the radios to synthesize their RF channels.
       Broadband Transmit Combiner, isolators, filters, duplexor
   &




       Receive Multicoupler, splitters and filters
   M




      Cell Site Monitor to monitor presence of the control channel
    + Commercial power supplies
5. Multiple indoor low power antenna locations inside the BNR and NT buildings

As the test program matures as many as 32 Motorola MicroTak® handsets may
be used in the test program, together with a variety of commercially available
cellular telephones.

program include developing new equipment and techniques for
microcell systems. The test program will explore methods to provide complete
inbuilding coverage for users without requiring an excessive number of base
stations within the building. it is important to test different RF propagation
environments under different conditions, and characterize the RF propagation


inside buildings under different conditions. To maximize efficiency it is critical to
control the spillage of the RF to ensure that the same spectrum can be reused
within as short of a distance as possible to provide coverage to business offices
while using as few cellular channels as possible.

Microcell technology developed from the program will provide economic
inbuilding services while avoiding conflict with external cellular macrocell
systems.

ofincludes future systems that
will greatly expand the number of customers that can use the cellular frequencies
while being served by a system that greatly expands the efficiency and versatility
of radio communication.



Document Created: 2001-08-10 14:06:53
Document Modified: 2001-08-10 14:06:53

© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC