This modification application for Station WE2XBV is submitted to:

   -   Correct the geographic coordinates from:

                     40-52-00 N.Lat.; 73-22-10 W.Long.
                 to: 40-51-48 N.Lat.; 73-22-26 W.Long.

                              Note: The transmitter is not being moved, this is only a minor correction
                              of the coordinates on the license to reflect the actual location of the
                              transmitting facilities, which is only 527m (approx.) from the
                              coordinates on the license. BAE Systems discovered the slight
                              inadvertent discrepancy while preparing to renew the license.

   -   Confirm that the only government contract associated with the license at this time is the
       following contract:

                      Customer/Agency:        U.S. Navy
                      Contract No.:           N00019-09-C-0019
                      Contract POC:           Denny Mai – 301-757-4353

              Accordingly, it is requested that Special Condition 13 be updated to reflect only
              the above contract.

   -   Request update to the “Stop Buzzer” information at Special Condition 12 to reflect the
       following:

                      Primary:        Mr. Jim Milligan (631) 262-8361
                      Secondary:      BAE Systems Emergency Services Center (603) 885-3842

              Accordingly, it is requested that Special Condition 12 be updated to reflect the
              above “Stop Buzzer” information.

   -   Finally, this is to confirm that although the original license application explained that the
       operations under the license would occur in an anechoic chamber with the door open,
       operations have been and continue to be conducted in a fully shielded anechoic chamber
       with the door closed. If and when operations occur in the future with the chamber door
       open, or outside the chamber, BAE Systems will pursue the various coordination and
       consent conditions specified on the license.



Document Created: 2018-12-05 07:49:24
Document Modified: 2018-12-05 07:49:24

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC