| Please explain the purpose of operation: |
The demonstration will conform to the following parameters:
1. Operation will be confined to the immediate vicinity of the Reno, Nevada police and fire public safety facility. Alcatel-Lucent will be demonstrating the LTE network in conjunction with other law enforcement agencies in the Nevada area. The equipment would include a base station and associated antenna located at the demonstration site, along-with a small number of portable units operating at no more than 1.5 kilometers from the base site.
2. We are requesting authority from the FCC to operate over the 758-768/788-798 MHz band, which is currently licensed on a nationwide basis to the PSST and is unlicensed D block spectrum.
3. Operation will occur between September 18 ?20, 2011, allowing time during that period for setup and testing, demonstrations, and teardown.
4. Alcatel-Lucent has analyzed information from the FCC?s ULS databases and has determined that the proposed operation would not interfere or create a significant potential for interference with any public safety operations in the 700 MHz band. Specifically, we found no active public safety licenses authorizing operation in the Reno, Nevada area on frequencies that are co-channel to those proposed in this STA request. |