| Please explain the purpose of operation: |
Demonstration at APCO conference
The demonstration will conform to the following parameters: 1. Operation will be confined to the vicinity of the Minneapolis Convention Center, 1301 Second Avenue South, Minneapolis, MN 55403. The equipment would include a base station and associated antenna located at the demonstration site, along-with a small number of portable units operating at no more than 1.5 kilometers from the base site. 2. We are requesting authority from the FCC to operate over the 758-768/788-798 MHz band, which is currently licensed on a nationwide basis to the PSST and is unlicensed D block spectrum. 3. Operation will occur between August 16th through August 22nd , 2012, allowing time during that period for setup and testing, demonstrations, and teardown. 4. Alcatel-Lucent has analyzed information from the FCC ULS databases and has determined that the proposed operation would not interfere or create a significant potential for interference with any public safety operations in the 700 MHz band. Specifically we found no active public safety licenses authorizing operation in the Minneapolis, Minnesota area on frequencies that are co-channel to those proposed in this STA request. |