Aerospace Corporation

1798-EX-ST-2017

Status: Granted

WL9XBV
2018-03-20

Documents and Communications: [refresh]

DescriptionCategoryDate
Grant E-mail Notification generated [Mar 20 2018]Correspondence2018-03-20
Grant E-mail Notification generated [Mar 20 2018]Correspondence2018-03-20
Application Form:
OET Special Temporary Authority Report
FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR SPECIAL TEMPORARY AUTHORITY

Applicant Name
Name of Applicant:  Aerospace Corporation

Address
Attention: Kathy Hollison
Street Address: 2310 E El Segundo Blvd
P.O. Box:
City: El Segundo
State: CA
Zip Code: 90245
Country:
E-Mail Address: [email protected]

Best Contact
Give the following information of person who can best handle inquiries pertaining to this application:  
Last Name: Hollison
First Name: Kathleen
Title: Spectrum Staff
Phone Number: 310-416-7199

Explanation
Please explain in the area below why an STA is necessary:
A STA is necessary due to a short development and test period. The test will be accomplished at a low power to do initial validation of the test system. Further testing will be conducted on a separate frequency authorization.

Purpose of Operation
Please explain the purpose of operation:  LTE emulation transmitter test. The Special Temporary Authority is for an LTE emulation transmitter test. The LTE emulation transmitter test will prepare the Aerospace Corporation to understand cellular use impact on the services that utilize the frequency band from 1695 to 1710 MHz. This test will validate Aerospaces capability to assess the impact of cellular migration into the pre-defined AWS-3 coordination zones. This test will include a LTE-like transmitter mounted to a vehicle which will function as a cellular user. The test will be accomplished at low power levels (EIRP less than 20 dBm). The test will be performed at the Aerospace Corporations El Segundo Campus and will greatly enhance our understanding of the system and improve the equipment for future testing.

Information
Callsign: WL9XBV
Class of Station: FX
Nature of Service: Experimental

Requested Period of Operation
Operation Start Date: 02/02/2018
Operation End Date: 08/01/2018

Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit:  
Manufacturer Model Number No. Of Units Experimental
Experimental Custom 1 Yes

Certification
Neither the applicant nor any other party to the application is subject to a denial of Federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. Section 862, because of a conviction for possession or distribution of a controlled substance. The applicant hereby waives any claim to the use of any particular frequency or electromagnetic spectrum as against the regulatory power of the United States because of the prvious use of the same, whether by license or otherwise, and requests authorization in accordance with this application. (See Section 304 of the Communications Act of 1934, as amended.) The applicant acknowledges that all statements made in this application and attached exhibits are considered material representations, and that all the exhibits part hereof and are incorporated herein as if set out in full in this application; undersigned certifies that all statements in this application are true, complete and correct to the best of his/her knowledge and belief and are made in good faith. Applicant certifies that construction of the station would NOT be an action which is likely to have a significant environmental effect. See the Commission's Rules, 47 CFR1.1301-1.1319.
Signature of Applicant (Authorized person filing form): Kathleen Hollison
Title of Applicant (if any): Spectrum Staff
Date: 2017-12-18 00:00:00.0

Station Location
City State Latitude Longitude Mobile Radius of Operation
EL Segundo California North  33  25  45 West  118  22  29
Datum:  NAD 83
Is a directional antenna (other than radar) used?   No
Exhibit submitted:   No
(a) Width of beam in degrees at the half-power point:  
(b) Orientation in horizontal plane:  
(c) Orientation in vertical plane:  
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?   No
(a) Overall height above ground to tip of antenna in meters:  
(b) Elevation of ground at antenna site above mean sea level in meters:  
(c) Distance to nearest aircraft landing area in kilometers:  
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action Frequency Station Class Output Power/ERP Mean Peak Frequency Tolerance (+/-) Emission Designator Modulating Signal
New 1695.00000000-1710.00000000 MHz FX 0.100000 W 0.100000 W P 1.22000000 % 10M0G9W LTE

14452

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC