Toggle navigation
FCC.report
IBFS
ELS
FCC ID
Contact
About
FCC.report
›
ELS
›
Aerospace Corporation, The
›
0583-EX-CN-2020
Aerospace Corporation, The
0583-EX-CN-2020
Status: Pending
N/A
2020-07-08
Filing Notes:
Description
Date
New experimental for Slingshot-1 CubeSat for the purpose of conducting individual experiments in space.
2021-02-10
New Experimental on 914.7 MHz for two CubeSatelllites AeroCube-15a and AeroCube-15b to demonstrate rapid development of a small size, weight and power (SWAP), low cost optical sensor in low earth orbit.
2019-08-22
Documents and Communications:
[
refresh
]
Description
Category
Date
E-Mail generated [Jul 8 2020]
Correspondence
2020-07-08
13 NOAA waiver
Pre Coordination Document
2020-07-08
9 ASDR2 bandwidth
Pre Coordination Document
2020-07-08
10 GPS SDR bandwidth
Pre Coordination Document
2020-07-08
11 BCT SDR bandwidth
Pre Coordination Document
2020-07-08
1 Slingshot1 ODAR signed
Pre Coordination Document
2020-07-08
3 Slingshot1 DAS202 output
Pre Coordination Document
2020-07-08
8 Blinker AdvRadio bandwidth
Pre Coordination Document
2020-07-08
6 Slingshot1 API cover letter
Pre Coordination Document
2020-07-08
2 Slingshot1 Mission Statement
Pre Coordination Document
2020-07-08
5 Slingshot1 ITU cost recovery
Pre Coordination Document
2020-07-08
7 FAA sketch and antenna figures
Pre Coordination Document
2020-07-08
5 Slingshot1 ITU cost recovery v2
Pre Coordination Document
2020-07-08
12 Analysis of AeroCube Non Interference with Protected 902 928 MHz Band
Pre Coordination Document
2020-07-08
Incoming generated [Jul 9 2020]
Correspondence
2020-07-09
E-Mail generated [Jul 16 2020]
Correspondence
2020-07-16
E-Mail generated [Jul 21 2020]
Correspondence
2020-07-21
E-Mail generated [Jul 23 2020]
Correspondence
2020-07-23
Incoming generated [Jul 20 2020]
Correspondence
2020-07-20
Incoming generated [Jul 23 2020]
Correspondence
2020-07-23
Incoming generated [Jul 23 2020]
Correspondence
2020-07-23
Incoming generated [Jul 23 2020]
Correspondence
2020-07-23
4 Slingshot1 NTIA forms v2
Pre Coordination Document
2020-07-23
7 FAA sketch and antenna figures v2
Pre Coordination Document
2020-07-23
17 Slingshot1 antenna pattern at 2250 MHz
Pre Coordination Document
2020-07-23
4 Slingshot1 NTIA forms
Text Documents
2020-07-20
3 Slingshot1 DAS310 output
Text Documents
2020-07-20
1 Slingshot1 ODAR v2 signed
Text Documents
2020-07-20
2 Slingshot1 Mission Statement v2
Text Documents
2020-07-20
15 Slingshot1 antenna pattern at 915 MHz
Text Documents
2020-07-20
16 Slingshot1 antenna pattern at 2280 MHz
Text Documents
2020-07-20
14 Ground station antenna pattern at 915 MHz
Text Documents
2020-07-20
12 Analysis of Non Interference with Protected 902 928 MHz Band
Text Documents
2020-07-20
E-Mail generated [Aug 3 2020]
Correspondence
2020-08-03
Incoming generated [Aug 3 2020]
Correspondence
2020-08-03
Incoming generated [Aug 3 2020]
Correspondence
2020-08-03
7 FAA sketch and antenna figures v3
Pre Coordination Document
2020-08-03
18 FAA Coordination Number 200447 NG T200424
Pre Coordination Document
2020-07-29
19 Ground station antenna pattern at 5020 MHz
Pre Coordination Document
2020-08-03
20 Ground station antenna pattern at 2055 MHz
Pre Coordination Document
2020-08-03
14 Ground station antenna pattern at 915 MHz polar
Text Documents
2020-08-05
19 Ground station antenna pattern at 5020 MHz polar
Text Documents
2020-08-05
20 Ground station antenna pattern at 2055 MHz polar
Text Documents
2020-08-05
Slingshot1 API SpaceCap07232020
Microsoft Access Database
2020-08-07
4 Slingshot1 NTIA forms v3
Text Documents
2020-08-07
7 FAA sketch and antenna figures v4
Text Documents
2020-08-07
21 Slingshot1 antenna pattern at 5020 MHz
Text Documents
2020-08-06
E-Mail generated [Aug 12 2020]
Correspondence
2020-08-12
E-Mail generated [Aug 20 2020]
Correspondence
2020-08-20
Incoming generated [Aug 12 2020]
Correspondence
2020-08-12
4 Slingshot1 NTIA forms v5
Text Documents
2020-08-18
E-Mail generated [Sep 3 2020]
Correspondence
2020-09-03
Incoming generated [Aug 28 2020]
Correspondence
2020-08-28
Incoming generated [Sep 4 2020]
Correspondence
2020-09-04
Slingshot1 API SpaceCapv9 08272020
Microsoft Access Database
2020-08-28
22 Additional data for API
Text Documents
2020-08-28
Correspondence w Applicant
Text Documents
2020-09-04
1 Slingshot1 ODAR v4 signed
Text Documents
2020-09-04
2 Slingshot1 Mission Statement v3
Text Documents
2020-08-28
12 Slingshot1 transmitter ERP and field strength
Text Documents
2020-08-28
E-Mail generated [Feb 8 2021]
Correspondence
2021-02-08
Incoming generated [Feb 8 2021]
Correspondence
2021-02-08
Grant E-mail Notification generated [Feb 10 2021]
Correspondence
2021-02-10
AHaB reentry analysis
Pre Coordination Document
2021-02-04
2 Slingshot1 Mission Statement v4
Pre Coordination Document
2021-02-04
Application Form:
FCC FORM 442
FCC FORM 442 - FEDERAL COMMUNICATIONS COMMISSION
APPLICATION FOR NEW OR MODIFIED RADIO STATION UNDER PART 5 OF FCC RULES - EXPERIMENTAL RADIO SERVICE (OTHER THAN BROADCAST)
Approved by OMB
3060 - 0065
Expires 09/30/98
Applicant's Name (company):
Aerospace Corporation, The
File No.:
0583-EX-CN-2020
Mailing Address
Attention:
David Hinkley (M2-241)
Street Address:
2310 E. El Segundo Blvd
P.O. Box:
City:
El Segundo
State:
CA
Country:
Zip Code:
90245
E-Mail Address:
david.a.hinkley@aero.org
Application Purpose
Application is for:
NEW LICENSE
For Modification indicate below
File No.:
Callsign:
WL2XEM
Government Contract
Is this authorization to be used for fulfilling the requirement of a government contract with an agency of the United States Government? If "YES", include as an exhibit a narrative statement describing the government project, agency and contract number.
No
Foreign Government Use
Is this authorization to be used for the exclusive purpose of developing radio equipment for export to be employed by stations under the jurisdiction of a foreign government? If "YES", include the contract number and the name of the foreign government concerned as an exhibit.
No
Research Project
Is this authorization to be used for providing communications essential to a research project? (The radio communication is not the objective of the research project)? If "YES", include as an exhibit the following information:
A description of the nature of the research project being conducted.
A showing that the communications facilities requested are necessary for the research project involved.
A showing that existing communications facilities are inadequete.
Yes
Exhibit Information
If all the answers to Items 4, 5, 6 are "NO", include as an exhibit a narrative statement describing in detail the following items:
The complete program of research and experimentation proposed including description of equipment and theory of operation.
The specific objectives sought to be accomplished.
How the program of experimentation has a reasonable promise of contribution to the development, extension, expansion or utilization of the radio art, or is along line not already investigated.
Estimated Duration
Give an estimate of the length of time that will be required to complete the program of experimentation proposed in this application:
24 Months
Environmental Impact
Would a commission grant of this application come within Section 1.1307 of the FCC Rules, such that it may have a significant environmental impact? If "YES", include as an exhibit an Environmental Assessment as required by Section 1.1311.
No
Manufacturer
List below transmitting equipment to be installed (if experimental, so state) if additional rows are required, please submit equipment list as an exhibit :
Manufacturer
Model Number
No. Of Units
Experimental
The Aerospace Corporation
ASDR2
1
Yes
The Aerospace Corporation
ADVradio
1
No
The Aerospace Corporation
GPS SDR
1
Yes
Blue Canyon Technologies
BCT SDR
1
No
Station ID
Is the equipment listed in Item 10 capable of station identification pursuant to Section 5.115?
No
Applicant Type
Applicant is:
Corporation
Foreign Government
Is applicant a foreign government or a representative of a foreign government?
No
License Denied or Revoked
Has applicant or any party to this application had any FCC station license or permit revoked or any application for permit, license or renewal denied by this Commission?
If "YES", include as an exhibit a statement giving call sign of license or permit revoked and relate circumstances.
No
Owner and Operator
Will applicant be owner and operator of the station?
Yes
Contact Information
Give the following information of person who can best handle inquiries pertaining to this application:
First Name:
david
Last Name:
hinkley
Title:
PICOSAT Project Leader
Phone Number:
3103365211
E-Mail Address:
david.a.hinkley@aero.org
Drug Abuse Question
APPLICANT ANTI-DRUG ABUSE CERTIFICATION: By checking "YES", the individual applicant certifies that he or she is eligible for this license. This requires that he or she is not subject to a denial of federal benefits, including FCC benefits, as a result of a drug offense conviction pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. 862. A non-individual applicant, e.g., corporation. partnership or other unincorporated association, certifies that no party to the application is subject to a denial of federal benefits, pursuant to that section. For definition of a "party" for these purposes, see 47CFR 1.2002(b).
Yes
Certification
THE APPLICANT CERTIFIES THAT:
Copies of the FCC Rule Parts 2 and 5 are on hand; and
Adequete financial appropriations have been made to carry on the program of experimentation which will be conducted by qualified personnel; and
All operations will be on an experimental basis in accordance with Part 5 and other applicable rules, and will be conducted in such a manner and at such a time as to preclude harmful interference to any authorized station; and
Grant of the authorization requested herein will not be construed as a finding on the part of the Commission:
that the frequencies and other technical parameters specified in the authorization are the best suited for the proposed program of experimentation, and
that the applicant will be authorized to operate on any basis other than experimental, and
that the Comission is obligated by the results of the experimental program to make provision in its rules including its table of frequency allocations for applicant's type of operation on a regularly licensed basis.
THE APPLICANT FURTHER CERTIFIES THAT:
All the statements in the application and attached exhibits are true, complete and correct to the best of the applicant's knowledge; and
The applicant is willing to finance and conduct the experimental program with full knowledge and understanding of the above limitations; and
The applicant waives any claim to the use of any particular frequency or of the electromagnetic spectrum as against the regulatory power of the USA.
Name of Applicant:
Aerospace Corporation, The
Signature (Authorized person filing form):
Mr. David Hinkley
Signature Date (Authorized person filing form):
07/08/2020
Title of Person Signing Application:
Sr. Project Leader
Classification:
Authorized employee
WILLFUL FALSE STATEMENTS MADE ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(A)(1)), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503).
NOTIFICATION TO INDIVIDUALS UNDER PRIVACY ACT OF 1974 AND THE PAPERWORK REDUCTION ACT OF 1980
Information requested through this form is authorized by the Communications Act of 1934, as amended, and specified by Section 308 therein. The information will be used by Federal Communications Commission staff to determine eligibility for issuing authorizations in the use of the frequency spectrum and to effect the provisions of regulatory responsibilities rendered by the Commission by the Act. Information requested by this form will be available to the public unless otherwise requested pursuant to 47 CFR 0.459 of the FCC Rules and Regulations. Your response is required to obtain this authorization.
Public reporting burden for this collection of information is estimated to average four (4) hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden to the Federal Communications Commission, Records Management Branch, Paperwork Reduction Project (3060-0065), Washington DC 20554. DO NOT send completed applications to this address. Individuals are not required to respond to this collection unless it displays a currently valid OMD control number.
THE FOREGOING NOTICE IS REQUIRED BY THE PRIVACY ACT OF 1974, P.L. 93-579, DECEMBER 31, 1974, 5 U.S.C. 552a(e)(3), AND THE PAPERWORK REDUCTION ACT OF 1980, P.L. 96-511, DECEMBER 11, 1980, 44 U.S.C. 3507.
Station Location
City
State
Latitude
Longitude
Mobile
Street (or other indication of location)
County
Radius of Operation
0
Vandenberg
California
North 34 38 55
West 120 36 53
LOS ANGELES
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
Yes
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane (degrees from True North):
(c) Orientation in vertical plane (degrees from horizontal):
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
None
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
Modified
2055.00000000- MHz
FX
9.000000 W 8960.000000 W
P
0.01600000 %
4M91G1D
QPSK
City
State
Latitude
Longitude
Mobile
Street (or other indication of location)
County
Radius of Operation
0
Bryan
Texas
North 30 38 35
West 96 28 21
Texas A&M University
BRAZOS
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
Yes
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane (degrees from True North):
(c) Orientation in vertical plane (degrees from horizontal):
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
Modified
914.70000000- MHz
FX
9.000000 W 1084.000000 W
P
0.00016000 %
1M09F1D
2-MSK
City
State
Latitude
Longitude
Mobile
Street (or other indication of location)
County
Radius of Operation
0
Gainsville
Florida
North 29 37 37
West 82 21 39
University of Florida
ALACHUA
Datum:
NAD 83
Is a directional antenna (other than radar) used?
Yes
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane (degrees from True North):
(c) Orientation in vertical plane (degrees from horizontal):
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
914.70000000- MHz
FX
9.000000 W 1084.000000 W
P
0.00016000 %
1M09F1D
2-MSK
City
State
Latitude
Longitude
Mobile
Street (or other indication of location)
County
Radius of Operation
0
Nongeostationary
Space Station
North
West
NonGeoStationary, SP
Datum:
NAD 83
Is a directional antenna (other than radar) used?
No
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane (degrees from True North):
(c) Orientation in vertical plane (degrees from horizontal):
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
Modified
914.70000000- MHz
MO
1.300000 W 1.200000 W
P
0.01600000 %
1M09F1D
2-MSK
City
State
Latitude
Longitude
Mobile
Street (or other indication of location)
County
Radius of Operation
0
Nongeostationary
Space Station
North
West
NonGeoStationary, SP
Datum:
NAD 83
Is a directional antenna (other than radar) used?
No
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane (degrees from True North):
(c) Orientation in vertical plane (degrees from horizontal):
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
Modified
2280.00000000- MHz
MO
2.000000 W 7.500000 W
P
0.01600000 %
4M91G1D
QPSK
City
State
Latitude
Longitude
Mobile
Street (or other indication of location)
County
Radius of Operation
0
Nongeostationary
Space Station
North
West
NonGeoStationary, SP
Datum:
NAD 83
Is a directional antenna (other than radar) used?
No
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane (degrees from True North):
(c) Orientation in vertical plane (degrees from horizontal):
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
Modified
5020.00000000- MHz
MO
7.000000 W 25.700000 W
P
0.01600000 %
16M3G1D
BPSK
City
State
Latitude
Longitude
Mobile
Street (or other indication of location)
County
Radius of Operation
0
Nongeostationary
Space Station
North
West
Non-geostationary
Space Station
Datum:
NAD 83
Is a directional antenna (other than radar) used?
No
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane (degrees from True North):
(c) Orientation in vertical plane (degrees from horizontal):
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
Modified
2248.00000000-2252.00000000 MHz
MO
2.000000 W 5.800000 W
P
0.01600000 %
3M23G1D
OQPSK
City
State
Latitude
Longitude
Mobile
Street (or other indication of location)
County
Radius of Operation
0
NONGEOSTATIONARY
Space Station
North
West
Nongeostationary
Datum:
NAD 83
Is a directional antenna (other than radar) used?
No
Exhibit submitted:
No
(a) Width of beam in degrees at the half-power point:
(b) Orientation in horizontal plane (degrees from True North):
(c) Orientation in vertical plane (degrees from horizontal):
Will the antenna extend more than 6 meters above the ground, or if mounted on an existing building, will it extend more than 6 meters above the building, or will the proposed antenna be mounted on an existing structure other than a building?
No
(a) Overall height above ground to tip of antenna in meters:
(b) Elevation of ground at antenna site above mean sea level in meters:
(c) Distance to nearest aircraft landing area in kilometers:
(d) List any natural formations of existing man-made structures (hills, trees, water tanks, towers, etc.) which, in the opinion of the applicant, would tend to shield the antenna from aircraft:
Action
Frequency
Station Class
Output Power/ERP
Mean Peak
Frequency Tolerance (+/-)
Emission Designator
Modulating Signal
New
2248.00000000-2252.00000000 MHz
MO
2.000000 W 5.800000 W
P
0.01600000 %
3M23G1D
OQPSK
63189
© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC