          PROPOSED
        RHINO III LAYOUT
             FOR
LIMITED TECHNICAL ASSESSMENT
        DEPLOYMENT TO
 KLAMATH FALLS AIRPORT (LMT)



                   January 9, 2006




    Advanced Navigation & Positioning Corporation
           11 Third Street Œ Hood River, Oregon 97031
            Phone: 541-386-1747 Œ Fax: 541-386-2124
         Email: info@anpc.com Œ Website: www.anpc.com




                                  LMT RHINO DEPLOYMENT PROPOSAL


This TTLS (Rhino™) installation option for the LTA deployment to Klamath Falls Airport was
arrived at by applying the system siting criteria after soliciting inputs from Airport
Management and the FAA Spectrum Office. The additional considerations that this proposal
incorporates are:

    •   (FAA) The best location for the TTLS would be at the north end of the airport, north
        of taxiway E and preferably east of the runway.
    •   (FAA) The 1030/1090 MHz components of the TTLS need to be located at least 2000
        feet from the ASR/PAR/IFF system.
    •   (Airport Manager) Prefer to utilize the abandoned runway to prevent damage to soft,
        wet soils around the airfield.
    •   (Airport Manager) Keep components and activities clear of airport restricted areas.

The following three figures depict the proposal. Figure 1 identifies the TTLS location relative
to the entire airfield. Figure 2 is to show the vehicle access to the area. The TTLS
component layout is detailed in Figure 3.




                               Control
                               Tower
 Rhino Set-up
 Area




                                                                        ASR / IFF




Figure 1: LMT airport layout. The proposed Rhino location is shown on the abandoned runway as a red circle.

The proposed area shown in Figure 1 meets all of the requirements presented by the stake
holders in the operation. The one trade-off in this proposal is that the Rhino equipment
siting does not meet the requirements necessary to ensure a Category I Approach System
to Runway 14, but it will provide signal accuracies for 300’ minimums to either runway
(depending on TERPS and aircraft).

At this location, all equipment will be clear of the RSA, and all towers, tents, and operation
areas will be outside the OFA. The site is in excess of 4100 feet from the ASR/PAR/IFF.
All operations will be outside of the Runway 32 ILS localizer critical area.




                                                                                                    Page 1


                                   LMT RHINO DEPLOYMENT PROPOSAL




                                                                         Control
                                                                         Tower
                                                       Rhino Set-up
                                                       Area




Figure 2: Detail of access roads to deployment site.

Figure 2 is included to detail access to the Rhino location. The area can be accessed without
using taxiways, or crossing the runway.




                                                        Page 2


                                 LMT RHINO DEPLOYMENT PROPOSAL




                                                           BITE
                                                  Base


                                   ESA
                                                                       ATA




                                            ASA




Figure 3: Detailed layout of Rhino components.

The positions of the components are specified as a setback from threshold and an offset
from runway centerline. The proposal locates all of the components on the abandoned
pavement except the BITE antenna. The location for the BITE was elevated and drained
during the early January site visit and should support the foot traffic necessary to set-up the
assembly.

   Assembly             Distance (feet)                Offset (feet)          Terrain
ASA                   1990                           310 left           Pavement
ESA                   1990                           500 left           Pavement
Base                  2015                           410 left           Pavement
ATA                   2280                           310 left           Pavement
BITE                  2265                           500 left           Soil

The locations in the table are used to identify an area to erect each assembly. The position
can be adjusted to facilitate set-up. The precise locations will be surveyed after set-up is
complete.




                                                                                        Page 3