Exhibit 1 as amended

0002-EX-ML-2003 Text Documents

AIRNET COMMUNICATIONS CORP.

2003-01-09ELS_59691

                                                                                     WA2XSN
                                                                     FILE NO. 0002-EX-ML-2003
                                            EXHIBIT 1

                      PURPOSE OF MODIFICATION APPLICATION
                     (Amended and Restated as of 3:20 p.m. January 9, 2003)

        By this application, Airnet seeks modification of its authorization for experimental station
WA2XSN to (1) delete the existing base station antenna site, (2) add a base station antenna site,
(3) add 100 watt mobile operations (including itinerant and occasional operations at fixed points)
in the 1842-1850 MHz base station band within a 15 kilometer radius of the new base station site
(item 2), and (4) add 100 watt fixed operations in the 1747-1755 MHz mobile band.

         The authorization should list the frequencies as follows:

                               Station         Emission              Authorized
         Frequency             Class           Designator            Power

         1747-1755 MHz         FX              300KGXW               100 W (ERP)
         1747-1755 MHz         MO              300KGXW               2 W (ERP)
         1842-1850 MHz         FX              300KGXW               100 W (ERP)
         1842-1850 MHz         MO              300KGXW               100 W (ERP)

       Airnet manufactures and sells base station radios that are “software defined.” The
additional authority requested by this application will allow Airnet to drive test these radios,
thereby developing information on their handoff performance as multipath, scattering and terrain
changes.

       Airnet recognizes that this additional authority will allow only secondary operations and
Airnet will coordinate these operations with those cochannel licensees affected by proposed
experimentation in the area of operations before conducting such experimentation, as required.

        No such experimentation will involve any new antennas above the height threshold
required for FAA coordination or, if any such operation is contemplated, appropriate clearance
will be obtained.

       These operations will be temporary and itinerant, and will involve no construction that
changes land features or involves sensitive areas. Accordingly, no environmental assessment is
required for the operations proposed in this application.
DC01/390864.2



Document Created: 2003-01-09 15:30:16
Document Modified: 2003-01-09 15:30:16

© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC