Spire - FCC 2018 Ann

NOTICE submitted by Spire Global, Inc.

Spire - FCC 2018 Annual Report

2018-06-28

This document pretains to SAT-LOA-20151123-00078 for Application to Launch and Operate on a Satellite Space Stations filing.

IBFS_SATLOA2015112300078_1440833

                                                                                           Spire Global, Inc.
                                                                                575 Florida Street, Suite #150
                                                                       San Francisco, CA 94110, United States
                                                                                 (415) 356-3400 | spire.com


June 28, 2018

VIA IBFS

Ms. Marlene H. Dortch
Secretary
Federal Communications Commission
445 12th Street, SW
Washington, DC 20554


    Re:    Spire Global, Inc. 2018 Annual Report for IBFS Call Sign S2946

Dear Ms. Dortch,

Spire Global, Inc. (“Spire”), licensee of the authorized LEMUR-2 satellite system operating under
Call Sign S2946, hereby submits its 2018 Annual Report (“Report”), which contains details on the
operation of its satellite system from June 1, 2017 to May 31, 2018 and anticipated launch dates
for future satellites to be added to the system.

This Report is being filed pursuant to Section 25.170 of the Commission’s rules.1

I. Status of the Satellite System

Spire has launched and deployed twenty-eight (28) of its authorized twenty-eight (28) Phase IA2
LEMUR-2 satellites, twenty-eight (28) of its authorized twenty-eight (28) Phase IB3 LEMUR-2




1
  See 47 C.F.R. § 25.170.
2
  See Stamp Grant, Spire Global, Inc., File No. SAT-LOA-20151123-00078 (granted in part and deferred in
part Mar. 18, 2016, as corrected Mar. 24, 2016); Stamp Grant, Spire Global, Inc., File No. SAT-LOA-
20151123- 00078 (granted in part and deferred in part June 16, 2016); Stamp Grant, Spire Global, Inc., File
No. SAT-LOA- 20151123-00078 (granted in part and deferred in part Oct. 14, 2016).
3
  See Stamp Grant, Spire Global, Inc., IBFS File No. SAT-AMD-20161114-00107 (granted in part and
deferred in part Apr. 7, 2017); Stamp Grant, Spire Global, Inc., IBFS File No. SAT-AMD-20161114-00107
(granted in part and deferred in part May 18, 2017).


       satellites, and eight (8)4 of its authorized Phase IC seventy-two LEMUR-2 satellites.5 The italicized
       text in Table 1 below contains the satellites that were deployed during the June 1, 2017 to May
       31, 2018 period.

LEMUR-2         # of Satellites   Launch            Orbit            Deployment        Deployment       Operational
Satellite                         Vehicle                            Date              Status           Status
Phase IA        4                 PSLV              650              09/28/2015        Successful       4 satellites
                                                                                                        operational
Phase IA        4                 Atlas V           400/ISS          05/18/2016        Successful       4 satellites
                                                                                                        deorbited
Phase IA        4                 Atlas V           ~385             06/21/2016        Partially        4 satellites
                                                                                       Successful6      deorbited
Phase IA        4                 Antares           500              11/25/2016        Successful       4 satellites
                                                                                                        operational
Phase IA        4                 H-IIB             400/ISS          03/06/2017        Successful       3 satellites
                                                                                                        operational
                                                                                                        and 1
                                                                                                        satellite
                                                                                                        deorbited
Phase IA        8                 PSLV              500              02/14/2017        Successful       8 satellites
                                                                                                        operational
Phase IB        4                 Atlas V           480              06/08/2017        Successful       4 satellites
                                                                                                        operational
Phase IB        8                 PSLV              500              06/23/2017        Successful       8 satellites
                                                                                                        operational
Phase IB        8                 Soyuz             600              07/14/2017        Successful       8 satellites
                                                                                                        operational
Phase IB        8                 Antares           445              11/11/2017        Successful       8 satellites
                                                                                                        operational
                10                Soyuz                              11/28/2017        Launch
      --                                                    --                                                    --
                                                                                       Failure



       4
         There are four (4) Phase IC satellites that were launched on May 20, 2018; however, they have not been
       deployed above the ISS yet. They are included in this Report for completeness.
       5
         See Stamp Grant, Spire Global, Inc., IBFS File No. SAT-AMD-20161114-00107 (granted in part and
       deferred in part July 13, 2017).
       6
         One LEMUR-2 satellite remained onboard the Cygnus OA-6 and was not deployed because of a failure in
       the deployment door. The satellite was destroyed upon reentry of the Cygnus OA-6 into the Earth’s
       atmosphere. See Letter from Tony Lin, Counsel, Spire, to Marlene H. Dortch, Secretary, Federal
       Communications Commission, IBFS File No. SAT-LOA-20151123-00078 (filed June 29, 2016).


                                                            2


Phase IC        4                 PSLV              505              01/12/2018         Successful     4 satellites
                                                                                                       operational
Phase IC        4                 Soyuz             585              02/01/2018         Successful     4 satellites
                                                                                                       operational
Phase IC        47                Antares           445              TBD                TBD            TBD

                         Table 1. LEMUR-2 satellites operating under the IBFS Call Sign S2946

       II. Contact Persons

       Responsible for emergency purposes and for resolution of interference problems
             Jerry Jason
             Mission Operations Director
             1050 Walnut Street, Suite 402
             Boulder, CO 80302 USA
             jerry.jason@spire.com
             +1-303-570-5787

       Responsible for long-term engineering and technical design issues
             George John
             Legal & Regulatory Counsel
             575 Florida Street, Suite 150
             San Francisco, CA 94110 USA
             george.john@spire.com
             +1-202-747-2619

       III. Construction Progress and Anticipated Launch Dates for Authorized Replacement Satellites

       Table 2 below contains anticipated launch dates for Spire’s upcoming launches for its Phase IC8
       LEMUR-2 constellation.




       7
         These Phase IC satellites were launched on May 20, 2018; however, they have not been deployed above
       the ISS yet. They are included in this Report for completeness.
       8
         See Stamp Grant, Spire, IBFS File No. SAT-AMD-20161114-00107 (granted July 13, 2017).


                                                          3


                          LEMUR-2            # of Satellites    Launch Date
                          Satellite
                          Phase IC           2                  2018Q3
                          Phase IC           8                  2018Q4
                          Phase IC           8                  2018Q4
                          Phase IC           8                  2018Q4
                          Phase IC           4                  2018Q4

  Table 2. Anticipated launch dates for future LEMUR-2 satellites operating under the IBFS Call Sign S2946

Please direct any questions regarding this filing to the undersigned.

                                                                  Sincerely,

                                                                      /s/ George John


                                                                  George John
                                                                  Legal & Regulatory Counsel
                                                                  575 Florida Street, Suite 150
                                                                  San Francisco, CA 94110 USA
                                                                  george.john@spire.com
                                                                  +1-202-747-2619




                                                     4



Document Created: 2018-06-29 00:52:20
Document Modified: 2018-06-29 00:52:20

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC