2AK9DL506LA1

FCC ID

Equipment: LTE Module

Shanghai MobileTek Communication Ltd. L506LA1

Free Trade Zone No. 33, No. 17 building 6H Xiya Road, Shanghai, N/A 200131 China

Application
Frequency Range
Final Action Date
Granted
x4O+Y2BMMJlMmOIeuDQkog==
-
2020-06-24
APPROVED
3bzN3a2KgweTQhaQkR1XNw==
824.7-848.3
2020-06-24
APPROVED
3bzN3a2KgweTQhaQkR1XNw==
826.4-846.6
2020-06-24
APPROVED
3bzN3a2KgweTQhaQkR1XNw==
1710.7-1710.7
2020-06-24
APPROVED
3bzN3a2KgweTQhaQkR1XNw==
1710.7-1754.3
2020-06-24
APPROVED
File NameDocument TypeDateDirect
RF Test set-up photoTest Setup Photos 2020-06-24 00:00:00 pdf
RF Test ReportTest Report 2020-06-24 00:00:00 pdf
User ManualUsers Manual 2020-06-24 00:00:00 pdf
RF Exposure reportRF Exposure Info 2020-06-24 00:00:00 pdf
Internal photosInternal Photos 2020-06-24 00:00:00 pdf
Label and locationID Label/Location Info 2020-06-24 00:00:00 pdf
External photoExternal Photos 2020-06-24 00:00:00 pdf
Modular Approval LetterCover Letter(s) 2020-06-24 00:00:00 pdf
LTC LetterCover Letter(s) 2020-06-24 00:00:00 pdf
Authorization LetterCover Letter(s) 2020-06-24 00:00:00 pdf
EMC Test set-up PhotoTest Setup Photos 2020-06-24 00:00:00 pdf
EMC Test reportTest Report 2020-06-24 00:00:00 pdf
Block DiagramBlock Diagram N/A
Operational DescriptionOperational Description N/A
SchematicsSchematics N/A
BOMParts List/Tune Up Info N/A
Tun up procedureParts List/Tune Up Info N/A

Application Details:

EquipmentLTE Module
FRN0026291625
Grantee Code2AK9D
Product CodeL506LA1
Applicant BusinessShanghai MobileTek Communication Ltd.
Business AddressFree Trade Zone No. 33, No. 17 building 6H Xiya Road, Shanghai,N/A China 200131
TCB ScopeB1: Commercial mobile radio services equipment in the following 47 CFR Parts 20, 22 (cellular), 24,25 (below 3 GHz) & 27
TCB Email[email protected]
Applicantbin yang – manager
Applicant Phone
Applicant Fax+86-21-54451877
Applicant Email[email protected]
Applicant MailStop
Test FirmChongqing Academy of Information and Communcations
Test Firm ContactLi Qiao
Test Firm Phone
Test Firm Fax
Test Firm Email[email protected]
Certified Bybin yang –
Comment [3bzN3a2KgweTQhaQkR1XNw==]: Output Power listed is ERP and EIRP for Part 22/27. Single Module Approval. Co-location of this module with other transmitters that operate simultaneously are required to be evaluated using the FCC multi-transmitter procedures. The host integrator must follow the integration instructions provided by the module manufacturer and ensure that the composite-system end product complies with the FCC requirements by a technical assessment or evaluation to the FCC rules and to KDB Publication 996369. The module antenna(s) must be installed to meet the RF exposure compliance separation distance of 20cm and any additional testing and authorization process as required. The module grantee is responsible for providing the documentation to the system integrator on restrictions of use, for continuing compliance of the module. The host integrator installing this module into their product must ensure that the final composite product complies with the FCC requirements by a technical assessment or evaluation to the FCC rules, including the transmitter operation and should refer to guidance in KDB 996369.
Comment [x4O+Y2BMMJlMmOIeuDQkog==]: Single Module Approval. Co-location of this module with other transmitters that operate simultaneously are required to be evaluated using the FCC multi-transmitter procedures. The host integrator must follow the integration instructions provided by the module manufacturer and ensure that the composite-system end product complies with the FCC requirements by a technical assessment or evaluation to the FCC rules and to KDB Publication 996369. The module antenna(s) must be installed to meet the RF exposure compliance separation distance of 20cm and any additional testing and authorization process as required. The module grantee is responsible for providing the documentation to the system integrator on restrictions of use, for continuing compliance of the module. The host integrator installing this module into their product must ensure that the final composite product complies with the FCC requirements by a technical assessment or evaluation to the FCC rules, including the transmitter operation and should refer to guidance in KDB 996369.

© 2020 FCC.report
This site is not affiliated with or endorsed by the FCC