Attachment SES-RWL-20181119-032

SES-RWL-20181119-032

DECISION submitted by FCC

Grant

0000-00-00

This document pretains to SES-RWL-20181119-03275 for Renewal on a Satellite Earth Station filing.

IBFS_SESRWL2018111903275_1583302

                                                       UNITED STATES OF AMERICA
                                                  FEDERAL COMMUNICATIONS COMMISSION

                                                RADIO STATION AUTHORIZATION

• Name: American Broadcasting Companies, Inc.                                                                  Call Sign: E03 0263
  Authorization Type: Renewal of License                                                                     file Number:
  Non Common Carrier                            Grant date:          11/27/2018       Expiration Date:        12/10/2033




 Nature of Service: Fixed Satellite Service

 Class of Station: Temporary Fixed Earth Station

 A) Site Location(s)
                                                                                                                   Elevation           Special Provisions
 # Site ID                               Address                               Latitude      Longitude              (Meters)      NAD (Refer to Section H)

 1) 1                     ENTIRE US       C CONUS,       AK,   HI,            O°O 0. ON         OO 0.0W                    0       NA
                          Possessiona)
                          CONUS, AK, HI,




 Subject to the provisions of the Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
 treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
 requirements set forth in this license, the grantee is authorized to construct use and operate the radio facilities described
 below for radio communications for the term beginning December 10, 2018 (3 AM Eastern Standard Time) and ending
 December 10, 2033 (3 AM Eastern Standard Timne) The required date of completion of construction and commencement oJ
                                                                        .




 operation is 00/0 0/0000. Grantee must file with the Commission a cerqflcation upon completion of construction and
 commencement of operation.


 B) Particulars of Operations
 The General Provisicn 1010 applies to all receiving frequency bands.
 The General Provision 1900 applies to all transmitting frequency bands.
 for the text of these provisions, refer to Section H.
                                                                                   Max    Max EIRP                           Special
                                                                                   EIRP    Density                         Provisions
              Frequency                Polarization          Tx/Rx               /Carrier /Carrier Associated               (Refer to Modulation!
 #              (MHz)                     Code      Emission Mode                 (dBW) (dBW/4kHz) Antenna                 Section H)  Services
 1) 14000.0000-14500.0000                 H,V            3GMOG7W        Tx        66.30       26.80      1                              PSK DIGITAL VIDEO     WITH
                                                                                                                                        AUDIO PaiD DATA

 2) 11700.0000-12200.0000                 F,V            3EMOG7W        R.x                              1                              PSK DIGITAL VIDEO     WITH
                                                                                                                                        AUDIO AKD DATA



 C) Frequency Coordination Limits
                                                            Satellite Arc            Elevation           Azimuth      Max EIRP
                                                            (Deg. Long.)             (Degrees)           (Degrees) Density toward
              Frequency Limits                             fast      West          fast     West       East    tVest   Horizon                  Associated
  #                (MHz)                                  Limit      Limit        Limit    Limit      Limit    Limit (UBW/4kHz)                 Antenna(s)

 1)     14000.0000-14500.0000                             60. OW-135 OW             40.7-13.1            159.2-250.2            -15.5

 2)     11700.0000-12200.0000                             60. OW- 135 .0W           40.7-13.1            159.2-250.2                       1




                                                                            (page 1 of4)                                                       FCC Form 48$


                                                 UNITED STATES OF AMERICA
                                            FEDERAL COMMUNICATIONS COMMISSION

                                           RADIO STATION AUTHORIZATION
Name: American Broadcasting Companies, Inc.                                                       Call Sign: E030263
Authorization Type: Renewal of License                                                          file Number: SES-RWL-201$11 19-03275
Non Common Carrier                         Grant date:    11/27/2018       Expiration Date:      12/10/2033




D) Points of Communications
  The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

 1)1 to Permitted Space Station List

E) Antenna Facilities
                                                                                                                                          Special
                                                                                                           Site             Max         Provisions
 Site                Antenna                Diameter                                                    Elevation      Antenna Height    (Refer to
 ID                    ID          Units     (meters)       Manufacturer                Model number    (Meters)          (Meters)      Section H)

                                     1          1.2               SIS                   U-POD l.2M DSNG 0                  3.7 AGL

    Max Gains(s)                    43.3 dEl @           14.2750 GHz            41.7 dEi @       11.9500 GHz
    Maximum total input power at antenna flange                   (Watts)       =             200.00
    Maximum aggregate output EIRP f or all carriers                     (dBW)       =         66.30




G) Antenna Structure marking and lighting requirements:
        None unless otherwise specified under Special and General Provisions


H) Special and General Provisions
   A)This RADIO STATION                    AUTHORIZATION is granted subject to the following special provisions and general
     conditions:
           4   ---   Licensee must ensure that a current listing of the name, title, mailing address, email address, and telephone
                     number of the responsible point of contact are on file at the FCC. Any changes must be filed electronically in the
                     International Bureau filing System (IBfS) in the ‘Other Filings” tab within 10 days of the change.
           5   ---   Licensee must notify the Commission when this earth station is no longer operational or when it has not been used
                     to provide any service during any 6-month operation.

    9039$      ---   Changes to previously authorized transmitting facilities, operations and devices regulated by the Commission that
                     may have significant environmental impact, and are not excluded by §1.1306, require the preparation of an
                     Environmental Assessment (EA) by the licensee. (See 47 C.F.R. § § 1.1307, 1.1 30$ and 1.1311)
    90399      ---   The licensee shall, at all times, take all necessary measures to ensure that operation of this (these) authorized
                     earth station(s) does not create potential exposure of humans to radiofrequency radiation in excess of the FCC
                     exposure limits defined in 47 CfR § 1.1307(b) and 1.1310. Physical measures must be taken to ensure
                     compliance with limits for both occupational/controlled exposure and for general population/uncontrolled
                     exposure, as defined in these rule sections. Compliance can be accomplished in most cases by appropriate
                     restrictions, such as fencing. Requirements for restrictions can be determined by predictions based on
                     calculations, modeling, or by field measurements. The FCC’s OET Bulletin 65 (available on-line at
                     www.fcc.gov/oet/rfsafety) provides information on predicting exposure levels and on methods for ensuring
                     compliance, including the use of warning and alerting signs and protective equipment for workers.




                                                              (page2of4)                                                     FCC Form 48$


                                            UNITED STATES OF AMERICA
                                       FEDERAL COMMUNICATIONS COMMISSION

                                      RADIO STATION AUTHORIZATION
Name: American Broadcasting Companies, Inc.                                             Call Sign: E03 0263
Authorization Type: Renewal of License                                                File Number: SES-RWL-20181119-03275
Non Common Carrier                   Grant date:   11/27/2018      Expiration Date:   12/10/2033




H) Special and General Provisions
   A) This RADIO STATION              AUTHORIZATION is granted subject to the following special provisions and general
      conditions:
    90405   ---   Operations with PERMiTTED LIST satellite must comply with §25.2 12 levels and operations above this levels
                  must coordinate with satellite operators prior to operations.

   900407   ---   The Permitted Space Station List (Permitted List) is a list of all geostationary space stations providing
                  fixed-satellite service pursuant to a Commission license or grant of U.S. market access. The Permitted List
                  currently includes the following frequency bands per §25.103 and §25.1 15(k)(l):

                     3600-4200 MHz (space-to-Earth)
                     5850-6725 MHz (Earth-to-space)
                     10.95-11.2 GHz (space-to-Earth)
                     11.45-12.2 GHz (space-to-Earth)
                     13.75-14.5 GHz (Earth-to-space)
                     18.3-18.8 GHz (space-to-Earth)
                     19.7-20.2 GHz (space-to-Earth)
                     24.75-25.25 GHz (Earth-to-space)
                     28.35-28.6 GHz (Earth-to-space)
                     29.25-30.0 GHz (Earth-to-space).

                  Earth stations with “Permitted List” designated as a point of communication may access any space station on the
                  Permitted List, provided the operations comply with the applicable “routine” uplink and downlink limits, are
                  within the specific frequency bands authorized in the earth station license, have completed coordination with
                  terrestrial stations pursuant to §25.203, and otherwise comply with all terms and conditions of both the earth
                  station license and the space station grant.




                                                        (page 3 of4)                                              FCC Form 48$


                                        UNITED STATES OF AMERICA
                                   FEDERAL COMMUNICATIONS COMMISSION

                                  RADIO STATION AUTHORIZATION

Name: American Broadcasting Companies, Inc.                                            Call Sign: E030263
Authorization Type: Renewal of License                                             File Number: SES-RWL-201$1119-03275
Non Common Carrier               Grant date:    11/27/2012      Expiration Date:    12/10/2033




   B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:
             This authorization is issued on the grantee’s representation that the statements contained in the application are
             true and that the undertakings described will be carried out in good faith.

             This authorization shall not be construed in any manner as a finding by the Commission on the question of
             marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
             install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
             Communications Act. 47 U.S.C. § 303(q).

             Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
             any person, firm, company or corporation without the written consent of the Commission. This authorization is
             subject to the right of use or control by the government of the United States conferred by Section 706 of the
             Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission’s
             Rules. 47 C.F.R. Part 25.

             This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
             designated frequencies beyond the term of this license, nor in any other manner than authorized herein.

             This authorization is issued on the grantee’s representation that the station is in compliance with environmental
             requirements set forth in Section 1.1307 of the Commission’s Rules. 47 C.F.R. § 1.1307.

             This authorization is issued on the grantee’s representation that the station is in compliance with the federal
             Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission’s Rules. 47 C.f.R.
             17.4.

             The following condition applies when this authorization permits construction of or modifies the construction
             permit of a radio station.

             This authorization shall be automatically forfeited if the station does not meet each required construction
             deadline by the required date of completion unless, before such date(s), a specific application is timely filed to
             request an extension of the construction deadline(s), supported with good cause why that failure to construct by
             the required date was due to factors not under control of the grantee.

             Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
             collect annual regulatory fees from regulatees is contained in Public Law 103-66, “The Omnibus Budget
             Reconciliation Act of 1993.” These regulatory fees, which are likely to change each fiscal year, are used
             to offset costs associated with the Commission’s enforcement, public service, international and policy and
             rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
             fee rates. Receive only earth stations are exempt from payment of regulatory fees.




                                                    (page4of4)                                                    FCC Form 488



Document Created: 2019-06-12 19:02:36
Document Modified: 2019-06-12 19:02:36

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC