Attachment SESRWL2018032800275.

SESRWL2018032800275.

DECISION submitted by FCC

GRANT

0000-00-00

This document pretains to SES-RWL-20180328-00275 for Renewal on a Satellite Earth Station filing.

IBFS_SESRWL2018032800275_1366892

                                                      UNITED STATES OF AMERICA
                                                 FEDERAL COMMUNICATIONS COMMISSION

                                                RADIO STATION AUTHORIZATION
    Name: CBS Communications Services Inc.                                                                    Call Sign: E030061
    Authorization Type: Renewal of License                                                                  File Number: SES—RWL—20180328—00275
    Non Common Carrier                          Grant date:       —03/28/2018       Expiration Date:        05/08/2033          *           1     a, C




Nature of Service: Domestic Fixed Satellite Service

 Class of Station: Temporary Fixed Earth Station                                                                           \n O

A) Site Location(s)
                                                                                                                 Elevation          Special Provisions
# Site ID                               Address                             Latitude          Longitude           (Meters)     NAD (Refer to Section H)

%) 1                     630 NORTH MCCLURG COURT                                                                      0         NA
                         (WBBM—TV)       TRANSPORTABLE
                         VARIOUS,


                         Licensee certifies antenna(s)                    comply with gain patterns specified in Section 25.209




Subject to the provisions of the Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
below for radio communications for the term beginning May 8, 2018 (3 AM Eastern Standard Time) and ending May 8, 2033
(3 AM Eastern Standard Time) . The required date of completion of construction and commencement of operation is
00/00/0000. Grantee must file with the Commission a certification upon completion of construction and commencement of
operation.


B) Particulars of Operations

The General Provision 1010 applies to all receiving frequency bands.
The General Provision 1900 applies to all transmitting frequency bands.
For the text of these provisions, refer to Section H.
                                                                                Max      Max EIRP                      Special
                                                                               EIRP       Density                    Provisions
            Frequency                 Polarization                 Tx/iRx     /Carrier    /Carrier asspcfated         (Re.fer 0      ‘Modulation/
#              (MHz)                      Code           Emission Mode        (dBW) (dBW/4KkH2) aAntenna             Section H)        Services
1) 14000.0000—14500.0000                 H, V           36MOG7W      Tx        65.50          29,80     1                            TELEVISION,      DATA,      MCPC


2) 11700.0000—12200.0000                 H, V           36MOG7W      Rx                                 3                            TELEVISION ,        DATA,   MCPC




C) Frequency Coordination Limits

                                                          Satellite Arc           Elevation               Azimuth         Max EIRP
                        22.                               (Deg. Long.)            (Degrees)              (Degrees) Density toward
            Frequency Limits                             East     West          East    West           East    West    Horizon                  Associated
#                (MHz)                                  Limit     Limit        Limit    Limit         Limit    Limit (dBW/4kHz)                 Antenna(s)
1)     14000.0000—14500.0000                             60 .ow—140 . OW         28.6—20 .9            137.0—236.4           —18.4      1
2)     11700.0000—12200.0000                             60 .0w—140 . ow         28.6—20 .9            137.0—236.4                      1




                                                                     ( page 1 of 3 )                                                        FCC Form 488


                                             UNITED STATES OF AMERICA
                                        FEDERAL COMMUNICATIONS COMMISSION

                                      RADIO STATION AUTHORIZATION

Name: CBS Communications Services Inc.                                                      Call Sign: E030061
Authorization Type: Renewal of License                                                   File Number: SES—RWL—20180328—00275
Non Common Carrier                    Grant date:    03/28/2018       Expiration Date:    05/08/2033




D) Points of Communications
  The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

 1) 1 to Permitted Space Station List

E) Antenna Facilities
                                                                                                       .                               Special
                                                                                                     Site             Max            Provisions
 Site           Antenna                Diameter                                                  Elevation       Antenna Height      (Refer to
  ID               ID         Units     (meters)       Manufacturer             Model number     (Meters)           (Meters)         Section H)
                    1           1         1.5              ADVENT                 NEWSSWIFT      0           3.7 AGL/       0 AMSL

       Max Gains(s) :          43.9 dBi @           11.9500 GHz           45.5 dBi @      14.2750 GHz
    Maximum total input power at antenna flange (Watts) =                              125 .00
    Maximum aggregate output EIRP for all carriers (dBW) =                              65.50




G) Antenna Structure marking and lighting requirements:
        None unless otherwise specified under Special and General Provisions


H) Special and General Provisions
   A)This RADIO STATION               AUTHORIZATION is granted subject to the following special provisions and general
     conditions:
           4 ——— Licensee must ensure that a current listing of the name, title, mailing address, email address, and telephone
                number of the responsible point of contact are on file at the FCC. Any changes must be filed electronically in the
                International Bureau Filing System (IBFS) in the "Other Filings" tab within 10 days of the change.
           5 ——— Licensee must notify the Commission when this earth station is no longer operational or when it has not been used
                to provide any service during any 6—month operation.

   90398 ——— Changes to previously authorized transmitting facilities, operations and devices regulated by the Commission that
             may have significant environmental impact, and are not excluded by §1.1306, require the preparation of an
             Environmental Assessment (EA) by the licensee. (See 47 C.F.R. §§1.1307, 1.1308 and 1.1311)
   90399 ——— The licensee shall, at all times, take all necessary measures to ensure that operation of this (these) authorized earth
               station(s) does not create potential exposure of humans to radiofrequency radiation in excess of the FCC exposure
               limits defined in 47 CFR §§ 1.1307(b) and 1.1310. Physical measures must be taken to ensure compliance with
               limits for both occupational/controlled exposure and for general population/uncontrolled exposure, as defined in
               these rule sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
               Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
               measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fec.gov/oet/rfsafety) provides information
               on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
               signs and protective equipment for workers.




                                                        ( page 2 of 3 )                                                FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: CBS Communications Services Inc.                                                  Call Sign: E030061
Authorization Type: Renewal of License                                               File Number: SES—RWL—20180328—00275
Non Common Carrier                Grant date:    03/28/2018       Expiration Date:   05/08/2033




   B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:

             This authorization is issued on the grantee‘s representation that the statements contained in the application are
             true and that the undertakings described will be carried out in good faith.

             This authorization shall not be construed in any manner as a finding by the Commission on the question of
             marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
             install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
             Communications Act. 47 U.S.C. § 303(q).

             Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
             any person, firm, company or corporation without the written consent of the Commission. This authorization is
             subject to the right of use or control by the government of the United States conferred by Section 706 of the
             Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission‘s
             Rules. 47 C.F.R. Part 25.

             This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
             designated frequencies beyond the term of this license, nor in any other manner than authorized herein.

             This authorization is issued on the grantee‘s representation that the station is in compliance with environmental
             requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

             This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
             Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
             17.4.

             The following condition applies when this authorization permits construction of or modifies the construction
             permit of a radio station.

             This authorization shall be automatically forfeited if the station is not ready for operation by the required date of
             completion of construction unless an application for modification of authorization to request additional time to
             complete construction is filed by that date, together with a showing that failure to complete construction by the
             required date was due to factors not under control of the grantee.

             Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
             collect annual regulatory fees from regulatees is contained in Public Law 103—66, "The Omnibus Budget
             Reconciliation Act of 1993." These regulatory fees, which are likely to change each fiscal year, are used
             to offset costs associated with the Commission‘s enforcement, public service, international and policy and
             rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
             fee rates. Receive only earth stations are exempt from payment of regulatory fees.




                                                    ( page 3 of 3 )                                                FCC Form 488



Document Created: 2018-03-30 18:04:35
Document Modified: 2018-03-30 18:04:35

© 2024 FCC.report