Attachment SESMOD2017082100934.

SESMOD2017082100934.

DECISION submitted by FCC

GRANT

0000-00-00

This document pretains to SES-MOD-20170821-00934 for Modification on a Satellite Earth Station filing.

IBFS_SESMOD2017082100934_1286036

                                                      UNITED STATES OF AMERICA
                                                 FEDERAL COMMUNICATIONS COMMISSION

                                                RADIO STATION AUTHORIZATION

 Name: Hearst Properties Inc.                                                                                    Call Sign: E060154
 Authorization Type: Modification of License                                                                  File Number: SES—MOD—20170821—00934
 Non Common Carrier                             Grant date:        10/02/2017        Expiration Date:          06/13/2021      __<         hap ynB




Nature of Service: Fixed Satellite Service

Class of Station: Temporary Fixed Earth Station

A) Site Location(s)
                                                                                                                    Elevation             Special Provisions
# Site ID                               Address                             Latitude        Longitude                (Meters)        NAD (Refer to Section H)

1) 1                     1021 N.     WYMORE ROAD          (WESH)                                                                      NA
                         WINTER PARK
                         VARIOUS,      ORANGE,     FL 32789


                         Licensee certifies antenna(s)                    comply with gain patterns specified in Section 25.209




Subject to the provisions of the Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
below for radio communications for the term beginning June 13, 2006 (3 AM Eastern Standard Time) and ending June 13,
2021 (3 AM Eastern Standard Time) . The required date of completion of construction and commencement of operation is
October 2, 2018 (3 AM Eastern Standard Time) . Grantee must file with the Commission a certification upon completion of
construction and commencement of operation.


B) Particulars of Operations

The General Provision 1010 applies to all receiving frequency bands.
The General Provision 1900 applies to all transmitting frequency bands.
For the text of these provisions, refer to Section H.
                                                                                Max      Max EIRP                             Special
                                                                               EIRP       Density                           Provisions
            Frequency                 Polarization                  Tx/Rx     /Carrier    /Carrier aAsgociated               (Refer t0     Modulation/
#              (MHz)                      Code           Emission Mode        (dBW) (dBW/4kHZ) Antenna                      Section H)      Services
1) 14000.0000—14500.0000                 H, V           24M0G7F       Tx        62 .15         22 .60     1                                PSK       DIGITAL   VIDEO   WITH
                                                                                                                                          DIGITAL AUDIO/DATA


C) Frequency Coordination Limits
                                                          Satellite Arc            Elevation                  Azimuth        Max EIRP
                             20.                         (Deg. Long.)              (Degrees)               (Degrees)     Density toward
             Frequency Limits                            East      West          East    West            East      West    Horizon                    Associated
#                 (MHz)                                 Limit      Limit        Limit    Limit          Limit      Limit (dBW/4kHz)                   Antenna(s)
1)     14000.0000—14500.0000                             69.0E—139.0W             15.0—15.0              000 .0—000 .0               —5          1




                                                                      ( page 1 of 3 )                                                                FCC Form 488


                                             UNITED STATES OF AMERICA
                                        FEDERAL COMMUNICATIONS COMMISSION

                                       RADIO STATION AUTHORIZATION
Name: Hearst Properties Inc.                                                                       Call Sign: E060154
Authorization Type: Modification of License                                                     File Number: SES—MOD—20170821—00934
Non Common Carrier                     Grant date:     10/02/2017          Expiration Date:      06/13/2021




D) Points of Communications
  The following stations located in the Satellite orbits consistent with Sections B and C ofthis Entry:

 1) 1 to Permitted Space Station List


E) Antenna Facilities
                                                                                                          Si                               Special
                                                                                                              ite           Max           Provisions
 Site           Antenna                 Diameter                       .                                Elevation   Antenna Height        (Refer to
  ID               ID          Units     ({meters)      Manufacturer                 Model number       (Meters)          (Meters)        Section H)

                    1            1         1.45      SAT—LITE TECHNOLOGIES           SAT—LITE 1411                      5 AGL/   0 AMSL

       Max Gains(s) :           44.8 dBi @           14.2500 GHz
       Maximum total input power at antenna flange            (Watts)        =            100 .00
       Maximum aggreqgate output EIRP for all carriers              (dBW)        =            64 .20




G) Antenna Structure marking and lighting requirements:
        None unless otherwise specified under Special and General Provisions


H) Special and General Provisions
   A)This RADIO STATION                 AUTHORIZATION is granted subject to the following special provisions and general
     conditions:
           4 ——— Licensee must ensure that a current listing of the name, title, mailing address, email address, and telephone
                 number of the responsible point of contact are on file at the FCC. Any changes must be filed electronically in the
                 International Bureau Filing System (IBFS) in the "Other Filings" tab within 10 days of the change.
           5 ——— Licensee must notify the Commission when an earth station is no longer operational or when it has not been used
                 to provide any service during any 6—month operation.

    90398 ——— Changes to previously authorized transmitting facilities, operations and devices regulated by the Commission that
              may have significant environmental impact, and are not excluded by §1.1306, require the preparation of an
              Environmental Assessment (EA) by the licensee. (See 47 C.F.R. §§1.1307, 1.1308 and 1.1311)
    90399 ——— The licensee shall, at all times, take all necessary measures to ensure that operation of this (these) authorized earth
              station(s) does not create potential exposure of humans to radiofrequency radiation in excess of the FCC exposure
              limits defined in 47 CFR §§ 1.1307(b) and 1.1310. Physical measures must be taken to ensure compliance with
              limits for both occupational/controlled exposure and for general population/uncontrolled exposure, as defined in
              these rule sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
              Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
              measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fee.gov/oet/rfsafety) provides information
              on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
              signs and protective equipment for workers.




                                                         ( page 2 of 3 )                                                     FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: Hearst Properties Inc.                                                            Call Sign: E060154
Authorization Type: Modification of License                                          File Number: SES—MOD—20170821—00934
Non Common Carrier                Grant date:    10/02/2017       Expiration Date:   06/13/2021




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:

              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakings described will be carried out in good faith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
              Communications Act. 47 U.S.C. §303(q).

              Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, company or corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission‘s
              Rules. 47 C.F.R. Part 25.

              This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
              designated frequencies beyond the term of this license, nor in any other manner than authorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliance with environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

              This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
              Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
              174.

              The following condition applies when this authorization permits construction of or modifies the construction
              permit of a radio station.

              This authorization shall be automatically forfeited if the station does not meet each required construction
              deadline by the required date of completion unless, before such date(s), a specific application is timely filed to
              request an extension of the construction deadline(s), supported with good cause why that failure to construct by
              the required date was due to factors not under control of the grantee.

              Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
              collect annual regulatory fees from regulatees is contained in Public Law 103—66, "The Omnibus Budget
              Reconciliation Act of 1993." These regulatory fees, which are likely to change each fiscal year, are used
              to offset costs associated with the Commission‘s enforcement, public service, international and policy and
              rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
              fee rates. Receive only earth stations are exempt from payment of regulatory fees.




                                                     ( page 3 of 3 )                                               FCC Form 488



Document Created: 2017-10-03 18:18:30
Document Modified: 2017-10-03 18:18:30

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC