Attachment modification

This document pretains to SES-MOD-20170508-00540 for Modification on a Satellite Earth Station filing.

IBFS_SESMOD2017050800540_1215113

The Boeing Company
Daniel McNeil
Radio Frequency Spectrum Manger
The Boeing Company
5300 International Blvd
M/C 7817-2202
North Charleston, SC 29418
714-642-7485


Purpose of Modification:
Boeing Requires a modification to E100083 to begin using extended Ku band on the Telstar 12V
satellite at the Boeing Herndon, VA Facility. Changes implemented by the satellite provider
require operation in the extended Ku-band and there are no other options to meet the
contracted government support requirement. A STA (SES-STA-INTR2017-01257) has been filed
in the interim to allow operations to begin upon grant to support customer needs. The Telstar
12V satellite is included on the FCC’s Permitted Space Station List. See Call Sign S2933, File No.
SAT-LOA-20141010-00107.
Purpose of Operation:
The purpose of this operation is to provide coverage to support our U.S. Government Customer.
Frequency, Power and Emission Data:
            Frequency                 Max Power (ERP)          Emission
            13900 – 14500 MHz         See E100083              See E100083


Antennas in Use:
See E100083
Location of Operation:
See E100083
Stop Buzzer POC:
Douglass Cook, 703-467-7257



Document Created: 2017-05-08 10:43:25
Document Modified: 2017-05-08 10:43:25

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC