Attachment SESMOD2017042700477.

SESMOD2017042700477.

DECISION submitted by FCC

GRANT

0000-00-00

This document pretains to SES-MOD-20170427-00477 for Modification on a Satellite Earth Station filing.

IBFS_SESMOD2017042700477_1248003

                                                      UNITED STATES OF AMERICA
                                                 FEDERAL COMMUNICATIONS COMMISSION

                                                RADIO STATION AUTHORIZATION

    Name: Anadarko Petroleum Corporation                                                                           Call Sign: E150008
    Authorization Type: Modification of License                                                                  File Number: SES—MOD—20170427—00477
    Non Common Carrier                          Grant date:        07/10/2017             Expiration Date:       04/21/2030




Nature of Service: Fixed Satellite Service

Class of Station: Fixed Earth Stations

A) Site Location(s)
                                                                     .                                                Elevation         Special Provisions
# Site ID                               Address                                Latitude          Longitude             (Meters)    NAD (Refer to Section H)

1) 1                     Offshore      oil platform in the                    27*5‘41.1"B       90°45‘50.32"W              0        83
                         GOM
                         Block GC859
                         Gulf of Mexico, Gulf of Mexico,
                         Licensee certifies antenna(s) comply with gain patterns specified in Section 25.209




Subject to the provisions of the Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
below for radio communications for the term beginning April 21, 2015 (3 AM Eastern Standard Time) and ending April 21,
2030 (3 AM Eastern Standard Time) . The required date of completion of construction and commencement of operation is July
10, 2018 (3 AM Eastern Standard Time) . Grantee must file with the Commission a certification upon completion of
construction and commencement of operation.


B) Particulars of Operations

The General Provision 1010 applies to all receiving frequency bands.
The General Provision 1900 applies to all transmitting frequency bands.
For the text of these provisions, refer to Section H.
                                                                                   Max        Max EIRP                       Special
                                                                                  EIRP          Density                    Provisions
             Frequency                Polarization                  Tx/Rx        /Carrier      /Carritgr aggociated         (Refer 10    Modulation/
#              (MHz)                      Code           Emission Mode           (dBW) (dBW/A4KHZ) aAptgenna              Section H)       Services
1) 5925.0000—6425.0000                   H,¥            2M29G7W          Tx       49 .46         18 .86      1                           Digital


2) 5925.0000—6425.0000                   H,V        4M59G7W              Tx       46 .46         18 .88      1                           Digital


3) 5925.0000—6425.0000                   H, V           9M3 8G7W         Tx       59.50          25 .80      1                           Digital      video,   audio   and
                     M                                                                                                                   data

4) 3700.0000—4200.0000                   H,V        3M88G7W              Rx       0 .00           9:00       3                           Digital


5) 3700.0000—4200.0000                   H, V           TM66GTW          Rx       0 .00           900        1                           Digital


61 3700.0000—4200.0000                   H.V            9M3 8G7W         Rx                                  1                           Digital      video,   audio   and
                                                                                                                                         data




                                                                         ( page 1 of 4)                                                         FCC Form 488


                                                UNITED STATES OF AMERICA
                                           FEDERAL COMMUNICATIONS COMMISSION

                                          RADIO STATION AUTHORIZATION

Name: Anadarko Petroleum Corporation                                                                    Call Sign: E150008
Authorization Type: Modification of License                                                          File Number: SES—MOD—20170427—00477
Non Common Carrier                        Grant date:   07/10/2017          Expiration Date:          04/21/2030




C) Frequency Coordination Limits

                                                 Satellite Arc             Elevation                 Azimuth              Max EIRP
               Er           20.                  (Deg. Long.)              (Degrees)                 (Degrees)       Density toward
                requency Limits                 East     West          East            West     East       West              Horizon          Associated
#                   (MHz)                      Limit     Limit        Limit            Limit   Limit       Limit       (dBW/4kHz)             Antenna(s)

1)          3700.0000—4200.0000                 74 .0W—139 . 0W        53.3—28.8                146.5—247.9                         0    1
2)          5925.0000—6425.0000                 74.0W—139 . OW         53.3—28.8                146.5—247.9                     —4 .4    1


D) Points of Communications
      The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

     1) 1 to Eutelsat 1 13WA ($2695) @ 113 degrees W.L. (formerly SATMEX 6) (Mexico—licensed)
    2) 1 to Permitted Space Station List


E) Antenna Facilities
                                                                                                                      .                                     Special
                                                                                                                     S'te'               Max               Provisions
     Site           Antenna                Diameter                                              .               Elevation          Antenna Height         (Refer to
     ID                ID         Units     (meters)       Manufacturer                    Model number          (Meters)               (Meters)           Section H)
                        1           1         2 .4                SeaTel                       9797              0               33.5 AGL/    33.5 AMSL

      ° Max Gains(s):              38.5 dBi @           3.9500 GHz             41.7 dBi @              6.1750 GHz
          Maximum total input power at antenna flange              (Watts)     =                60 .00
          Maximum aggregate output EIRP for all carriers               (dBW)       =            59.50




G) Antenna Structure marking and lighting requirements:
            None unless otherwise specified under Special and General Provisions


H) Special and General Provisions
       A)This RADIO STATION               AUTHORIZATION is granted subject to the following special provisions and general
         conditions:
               4 ——— Licensee must ensure that a current listing of the name, title, mailing address, email address, and telephone
                     number of the responsible point of contact are on file at the FCC. Any changes must be filed electronically in the
                     International Bureau Filing System (IBFS) in the "Other Filings" tab within 10 days of the change.
               5 ——— Licensee must notify the Commission when an earth station is no longer operational or when it has not been used
                     to provide any service during any 6—month operation.

               6 ——— Licensee must comply with the license modification and notification requirements of 47 CFR § 25.118 to change
                     the coordinates of its authorized earth station.


                                                            ( page 2 of 4 )                                                                  FCC Form 488


                                          UNITED STATES OF AMERICA
                                     FEDERAL COMMUNICATIONS COMMISSION

                                    RADIO STATION AUTHORIZATION

Name: Anadarko Petroleum Corporation                                                     Call Sign: E150008
Authorization Type: Modification of License                                           File Number: SES—MOD—20170427—00477
Non Common Carrier                 Grant date:    07/10/2017       Expiration Date:    04/21/2030




H) Special and General Provisions
   A)This RADIO STATION             AUTHORIZATION is granted subject to the following special provisions and general
     conditions:                                                         —
    90398 ——— Changes to previously authorized transmitting facilities, operations and devices regulated by the Commission that
              may have significant environmental impact, and are not excluded by §1.1306, require the preparation of an
              Environmental Assessment (EA) by the licensee. (See 47 C.F.R. §§1.1307, 1.1308 and 1.1311)
    90399 ——— The licensee shall, at all times, take all necessary measures to ensure that operation of this (these) authorized earth
              station(s) does not create potential exposure of humans to radiofrequency radiation in excess of the FCC exposure
              limits defined in 47 CFR §§ 1.1307(b) and 1.13 10. Physical measures must be taken to ensure compliance with
              limits for both occupational/controlled exposure and for general population/uncontrolled exposure, as defined in
              these rule sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
              Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
              measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fee.gov/oet/rfsafety) provides information
              on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
              signs and protective equipment for workers.
    90422 ——— The licensee certifies that the Sea Tel model 9797 antenna authorized by this license complies with 47 C.F.R.
              Section 25.209 of the Rules and Regulations of the Federal Communications Commission and that the input
              power spectral density into the antenna will not exceed —2.7 dBW/4kHz for digital carriers complies with 47
              C.F.R. Section 25.212(d) of the Rules and Regulations of the Federal Communications Commission.
   900407 ——— The Permitted Space Station List (Permitted List) is a list of all geostationary space stations providing
              fixed—satellite service pursuant to a Commission license or grant of U.S. market access in the following bands:
              3600—4200 MHz (space—to—Earth)                                                                     ’
              5850—6725 MHz (Earth—to—space)
              10.95—11.2 GHz (space—to—Earth)
              11.45—12.2 GHz (space—to—Earth)
              13.75—14.5 GHz (Earth—to—space)
              18.3—18.8 GHz (space—to—Earth)
              19.7—20.2 GHz (space—to—Earth)
              24.75—25.25 GHz (Earth—to—space)
              28.35—28.6 GHz (Earth—to—space)
              29.25—30.0 GHz (Earth—to—space).

              Earth stations with "Permitted List" designated as a point of communication may access any space station on the
              Permitted List, provided the operations comply with the applicable "routine" uplink and downlink limits, are
              within the specific frequency bands authorized in the earth station license, have completed coordination with
              terrestrial stations pursuant to §25.203, and otherwise comply with all terms and conditions of both the earth
              station license and the space station grant.




                                                      ( page 3 of 4)                                                FCC Form 488


       {%fi%                              UNITED STATES OF AMERICA
     f  SeNs                        FEDERAL COMMUNICATIONS COMMISSION

            JA                     RADIO STATION AUTHORIZATION
Name: Anadarko Petroleum Corporation                                                    Call Sign: E150008
Authorization Type: Modification of License                                          File Number: SES—MOD—20170427—00477
Non Common Carrier                 Grant date:   07/10/2017       Expiration Date:   04/21/2030




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:

              This authorization is issued on the grantee‘s representation that thestatements contained in the application are
              true and that the undertakings described will be carried out in good faith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
              Communications Act,. 47 U.S.C. § 303(q).

              Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, company or corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission‘s
              Rules. 47 C.F.R. Part 25.

              This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
              designated frequencies beyond the term of this license, nor in any other manner than authorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliance with environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 CF.R. § 1.1307.

              This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
              Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
              17.4.

              The following condition applies when this authorization permits construction of or modifies the construction
              permit of a radio station.

             This authorization shall be automatically forfeited if the station is not ready for operation by the required date of
             completion of construction unless an application for modification of authorization to request additional time to
             complete construction is filed by that date, together with a showing that failure to complete construction by the
             required date was due to factors not under control of the grantee.

             Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
             collect annual regulatory fees from regulatees is contained in Public Law 103—66, "The Omnibus Budget
             Reconciliation Act of 1993." These regulatory fees, which are likely to change each fiscal year, are used
             to offset costs associated with the Commission‘s enforcement, public service, international and policy and
             rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
             fee rates. Receive only earth stations are exempt from payment of regulatory fees.




                                                     ( page 4 of 4)                                L               FCC Form 488



Document Created: 2017-07-12 18:06:20
Document Modified: 2017-07-12 18:06:20

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC