Attachment 20160802162858.pdf

20160802162858.pdf

DECISION submitted by FCC-IB

Grant

2016-08-02

This document pretains to SES-MOD-20150921-00630 for Modification on a Satellite Earth Station filing.

IBFS_SESMOD2015092100630_1145325

                                                         UNITED STATES OF AMERICA
                                                    FEDERAL COMMUNICATIONS COMMISSION

                                                RADIO STATION AUTHORIZATION
 Name: Global Crossing Americas Solutions, Inc.                                                           Call Sign: E080118
 Authorization Type: Modification of License                                                           File Number: SES—MOD—20150921—00630
 Non Common Carrier                            Grant date:       06/28/2016       Expiration Date:      06/24/2023




Nature of Service: Fixed Satellite Service
Class of Station: Fixed Earth Stations

A) Site Location(s)
                                                                                                               Elevation          Special Provisions
# Site ID                               Address                           Latitude       Longitude              (Meters)     NAD (Refer to Section H)
1) 1                     Plaza Fajardo 65 Inf. Av.                    18°20 14. 0N      c5940647. 0w              64 .92         83
                         1st Floor
                         Fajardo, Fajardo, PR 00738
                         Licensee certifies antenna(s) comply with gain patterns specified in Section 25.209



Subject to the provisions ofthe Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
belowfor radio communications for the term beginning June 24, 2008 (3 AM EasternStandard Time) and ending June 24,
2023 (3 AM Eastern Standard Time) . The required date of completionof construction and commencement ofoperation is June
28, 2017 (3 AM Eastern Standard Time) . Grantee must file with the Commission a certification upon completion of
construction and commencement ofoperation.


B) Particulars of Operations

The General Provision 1010 applies o all receiving frequency bands.
The General Provision 1900 appliesto alltransmitting frequencybands.
For the text of these provisions, refer to Section H
                                                                              Max     Max EIRP                        Special
                                                                              EIRP     Density                       Provisions
             Frequency                Polarization                Ta/Rx    /Carrier    /Carrit®      Associated      (Refer 19        Modulation/
#              (MHz)                         Code       Emission. Mode      (dBW)     (dBWAKHZ) Aneenna              Section H)        Services
11 5325.0000—6425.0000                  v              1158070      y         se.98      24.40        Pada—1                          Digital data carrier
2) se25.0000—6425.0000                  v              230R07D      ry        41.99      24.40        raoa—1                          Digital data carrier
31 seas.0000—6425.0000                   my            #sore7D      ry        48.40      24.40       raon—1                           Digital data carrier
4) 3700.0000—4200 .0000                  i             115870       rx                               raga—a                           Digital data carrier

51 3700.0000—4200.0000                   x             2308070      ax                               raga—a                           Digital data carrier
61 3700.0000—4200.0000                   my            sM15G7D      rx                                ragna                           Digital data carrier




                                                                    ( page 1 of 4)                                                         FCC Form 488


                                                    UNITED STATES OF AMERICA
                                               FEDERAL COMMUNICATIONS COMMISSION

                                              RADIO STATION AUTHORIZATION

    Name: Global Crossing Americas Solutions, Inc.                                                     Call Sign: EO80118
    Authorization Type: Modification of License                                                     File Number: SES—MOD—20150921—00630
    Non Common Carrier                        Grant date:   06/28/2016          Expiration Date:     06/24/2023




    C) Frequency Coordination Limits

                                                     Satellite Arc          Elevation               Azimuth         Max EIRP
                                .                   (Deg. Long.)            (Degrees)             (Degrees) Density toward
                  Frequency Limits                  East    West          East    West          East    West    Horizon             Associated
    #                  (MHz)                       Limit    Limit        Limit    Limit        Limit    Limit (dBW/4kHz)            Antenna(s)
    1)          3700.0000—4200.0000                 45.0W—56 . ow          58.0—65.8            129.8—151.5                     FAJA—1
    2)          5925.0000—6425.0000                 45. 0w—56 . ow         58.0—65.8            129.8—151.5            —28.71   PAJA—1


    D) Points of Communications
          The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

        1) 1 to PANAMSAT 1R (PAS—1R ) @ 45.0 W.L. (U.S.—licensed domestic satellite)
        2) 1 to INTELSAT 805 ($2404) @ 304.5 E.L. (U.S.—licensed)

    E) Antenna Facilities
                                                                                                                                                   Special
                                                                                                                s“‘,             Max             Provisions
         Site           Antenna                Diameter                                                       Elevation     antenna Height        (Refer to
          ID              ID          Units    (meters)        Manufacturer              Model number         (Meters)         (Meters)          Section H)
1                        FAJA—1           1        2.4               PRODELIN                  1251           64 .92      11.544 AGL/ 76.464
                                                                                                                                 AMSL

            Max Gains(s) :             42.0 dBi e           6.1300 GHz            38.0 dBi e           3.9000 GHz
            Maximum total input power at antenna flange (Watts) =                                   4 .80
            Maximum aggregate output EIRP for all carriers (dBW) ©                                 48.81




    F) Remote Control Point:
    1                     200 Larose Road                                                                     Call Sign: EO80118
                          Weir, Quebec,
                          819—687—3241


    G) Antenna Structure marking and lighting requirements:
                None unless otherwise specified under Special and General Provisions




                                                                 ( page 2 of 4)                                                    FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: Global Crossing Americas Solutions, Inc.                                         Call Sign: EO80118
Authorization Type: Modification of License                                         File Number: SES—MOD—20150921—00630
Non Common Carrier                Grant date:    —06/28/2016     Expiration Date:    06/24/2023




H) Special and General Provisions
   A)This RADIO STATION AUTHORIZATION is granted subject to the following special provisions and general
     conditions:
     1010 ——— Applicable to all receiving frequency bands. Emission designator indicates the maximum bandwidth of received
              signal at associated station(s). Maximum EIRP and maximum EIRP density are not applicable to receive
              operations.
      1900 ——— Applicable to all transmitting frequency bands. Authority is granted to transmit any number of RF carriers with
               the specified parameters on any discrete frequencies within associated band in accordance with the other terms
               and conditions of this authorization, subject to any additional limitations that may be required to avoid
               unacceptable levels of inter—satellite interference.
     2010 ——— This authorization is issued pursuant to the Commission‘s Second Report and Order adopted June 16, 1972 (35
              FCC 2d 844) and Memorandum, Opinion and Order adopted December 21, 1972 (38 FCC 2d 665) in Docket No.
              16495 and is subject to the policies adopted in that proceeding.
     2300 ——— Authority is granted to operate this station by remote control provided that: (1)the parameters of the transmissions
              of this station monitored at the remote control point, and the operational functions sufficient to ensure that the
              operations of this station are in full compliance with the station authorization at all times; (2) upon detection by
              the grantee, or upon notification from the Commission, of a deviation of the operation of this station,
              transmissions shall be immediately suspended until the deviation is corrected, except that transmissions
              concerning the immediate safety of life or property may be conducted for the duration of such emergency; and (3)
              the grantee shall have available, at all times, the technical personnel necessary to perform the technical servicing
              and maintenance of this station expeditiously. See also Public Notice "The International Bureau Provides
              Guidance Concerning the Relocation of Earth Station Remote Control Points", DA 06—978 (rel. May 4, 2006).
     2916 ——— Transmitter(s) must be turned off during antenna maintenance to ensure compliance with the FCC—specified safety
              guidelines for human exposure to radiofrequency radiation in the region between the antenna feed and the
              reflector. Appropriate measures must also be taken to restrict access to other regions in which the earth station‘s
              power flux density levels exceed the specified guidelines.
     2938 ——— Upon completion of construction, each licensee must file with the Commission a certification including the
              following information: (1) name of the licensee, (2) file number of the application, (3) call sign of the antenna, (4)
              date of the license, (5) certification that the facility as authorized has been completed, (6) certification that each
              antenna facility has been tested and is within 2 dB of the pattern specified in Section 25.209, and (7) certification
              that the station is operational (including the date of commencement of service) and will remain operational during
              the license period unless the license is submitted for cancellation.
      3219 ——— All existing transmitting facilities, operations and devices regulated by the Commission must be in compliance
               with the Commission‘s radiofrequency (RF) exposure guidelines, pursuant to Section 1.1307(b)(1) through (b)(3)
               of the Commission‘s rules, or if not in compliance, file an Environmental Assessment (EA) as specified in Section
               1.1311. See 47 CFR § 1.1307 (b) (5).
      5216 ——— All operations shall be on a non—common carrier basis.


      9659 ——— The licensee is afforded 30 days from the date of issuance of this license to decline it as conditioned. Failure to
               respond within this period will constitute formal acceptance of the authorization as conditioned.




                                                      ( page 3 of 4)                                                FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: Global Crossing Americas Solutions, Inc.                                          Call Sign: E080118
Authorization Type: Modification of License                                          File Number: SES—MOD—20150921—00630
Non Common Carrier                Grant date:    —06/28/2016      Expiration Date:   06/24/2023




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:

              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakings described will be carried out in good faith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
              Communications Act. 47 U.S.C. § 303(q).

              Neither this authorization nor the right granted bythis authorization shall be assigned or otherwise transferred to
              any person, firm, company or corporation without the writtenconsent of the Commission. This authorization is
              subject to the right of use or control by the government ofthe United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission‘s
              Rules. 47 C.F.R. Part 25.

              This authorization shall not vest in the licensee any right to operate this station nor anyright in the use of the
              designated frequencies beyond the term of this license, nor in any other manner than authorized herein.

              This authorization is issued on the grantee‘s representation that the station is in compliancewith environmental
              requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

              This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
              Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
              17.4.

              The following condition applies when this authorization permits construction of or modifies the construction
              permit of a radio station.

              This authorization shall be automatically forfeited if the station is not ready for operation bythe required date of
              completion of construction unless an application for modification of authorization to request additional time to
              complete construction is filed by that date, together with a showing that failure to complete construction by the
              required date was due to factors not under control of the grantee.

              Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
              collect annual regulatory fees from regulatees is contained in Public Law103—66, "The Omnibus Budget
              Reconciliation Act of 1993." These regulatory fees, which are likely to change each fiscal year, are used
              to offset costs associated with the Commission‘s enforcement, public service, internationaland policy and
              rulemaking activities, The Commission issues a Report and Order each year, setting the new regulatory
              fee rates. Receive only earthstations are exempt from payment of regulatory fees.




                                                     (page 4 of 4 )                                                FCC Form 488



Document Created: 2016-08-02 16:29:17
Document Modified: 2016-08-02 16:29:17

© 2025 FCC.report
This site is not affiliated with or endorsed by the FCC