Attachment Narra & Part 25 Comp

This document pretains to SES-MFS-20150818-00530 for Modification w/ Foreign Satellite (earth station) on a Satellite Earth Station filing.

IBFS_SESMFS2015081800530_1099539

Exhibit 1 – Application Narrative and Showing of Compliance
            With Sections 25.221 and 25.222


                         Airbus DS SatCom Government, Inc.



                        Application to Modify WB36 License to

              Convert License From Common Carrier Authorization to
                         Non-Common Carrier Authorization;
                                       And
  Add up to 500 Intellian Model v240M 2.4 Meter Multi Band (C-band and Ku-band)
                  Remote Earth Station On Vessel (ESV) Antennas
                                        to
                     Call Sign WB36 License ESV Authorization

                              SES-MFS-20150130-00047

                                    Call Sign WB36

         By this application Airbus DS SatCom Government, Inc. (ASGI) respectfully
seeks modification of the WB36 license to convert the license from a Common Carrier
Authorization to a Non-Carrier Authorization. In making this request ASGI notes that in
January 2015 modifications of ASGI licenses were approved which moved earth station
authorizations for all Hub Antennas which were formerly on the WB36 license to other
ASGI licenses, see SES-MFS-20140808-00644 and SES-MFS-20140804-00632. As a
result, the only authorizations now on the WB36 license are for land VSAT and ESV
remote antennas.

        ASGI also seeks to add 500 Intellian Model v240M 2.4 Meter Multi Band (C-
band and Ku-band) remote ESV antennas to the WB36 authorization to provide ESV
service. The antennas will be located on vessels traveling in U.S. and international
waters. They will operate with hub antennas that are separately licensed. They will be
utilized to provide ESV service in the same manner as previously authorized by the
Commission and will be operated in full compliance with the requirements of the
Commission’s ESV regulations as set forth in part 25 of the Rules.

       ASGI’s Showing of Compliance with Part 25 of the Commission’s Rules follows
herewith and the exhibits required by Sections 25.221 and 25.222 are included as
attachments to the Modification Application.

     Showing of Compliance for the C-band Operation of the v240M Antenna with
                        Part 25 of the Commission’s Rules

Section 25.221


Exhibit 1 – Application Narrative and Showing of Compliance
            With Sections 25.221 and 25.222
  (a) (1) Comply.

     See the Intellian declaration and Exhibit 2 – “C band EIRP Spectral Density.”

     The antennas use transmitters that have off-axis EIRP spectral densities less than
     or equal to the levels in paragraph 25.221(a)(1)(i) and meet the requirements of
     25.221 (a)(1)(i)(A-C) with an N value of 1. Exhibit 2 provides the detailed
     demonstration described in paragraph 25.221 (b)(1). The declaration contains the
     certification that the antenna complies with the pointing requirement in paragraph
     25.221 (a)(1)(ii)(A) and the cessation of emission requirement in paragraph
     25.221 (a)(1)(iii)(A).

  (a) (2) Not Applicable

  (a) (3) Not Applicable


  (a) (4) Comply. The U.S. based ESV Compliance Officer has authority and ability to
      cease all emissions from ESVs through teleports located in the U.S. and elsewhere
      used to uplink the ESVs. The ESV Compliance Officer is able to direct the
      Marlink Network Operations Center (MNOC) located in Eik, Norway to send
      commands via the uplink teleports which cause the remote ESVs to cease
      transmitting. The business address for the ESV Compliance Officer is 2600
      Tower Oaks Boulevard, Suite 210, Rockville, MD 20852 and this point of contact
      is available 24 hours a day, seven days a week via 203-346-0461 which is the
      U.S. number for the MNOC

  (a) (5) Comply. These records are being collected and maintained as specified.
      Requests to make this data available may be directed to the ESV Compliance
      Officer via 203-346-0461.

  (a) (6) Comply.

  (a) (7) Comply. The ESVs are controlled through teleports located in the United
      States and elsewhere used to uplink the ESVs. As noted in the (a) (4) response,
      the ESV Compliance Officer that is located within the United States has the
      capability and authority to cause any of the ESVs to stop transmitting if
      necessary.

  (a) (8) Comply.

  (a) (9) Comply.

  (a) (10) Comply. No protection is sought for docked ESVs at this time. In the event
      it is necessary to seek protection at some point in the future, it will be
      accomplished in accordance with the terms of this §25.221 (a) (9).


Exhibit 1 – Application Narrative and Showing of Compliance
            With Sections 25.221 and 25.222

  (a) (11) Agree.

  (a) (12) Comply. The C-band ESVs which are the subject of this application will not
      operate within 200 Km of the U.S. coastline or fixed service offshore facilities
      unless prior coordination has been completed. It is noted that numerous C-band
      ESV interference studies and frequency coordinations have been completed for
      applicant by Comsearch and Skjei Telecom and Notifications Concerning
      Completion of the Coordinations were filed with the Commission (under the
      WB36 and KA249 licenses) as specified in the Commission’s Public Notice DA
      05-1671, Released: June 15, 2005 and the Notifications placed on Public Notice.
      Other coordinations may be completed as-needed and if so, Notifications for same
      will be filed with the Commission for Public Notice as they are completed.

  (a) (13) Comply. Hardware and software have been developed and deployed which
      continuously monitors the location of each ESV and its operating frequency;
      compares this information with data containing mapping coordinates for areas in
      which ESV operation is (and is not) permitted and coordination information and
      terms for same; and which will automatically cease the transmissions of the ESV
      if it is in an area for which coordination is required and operation would be in
      violation of the terms of coordination.

  (b) (1) Comply. The tables described in 25.221(b)(1)(i) are attached in Exhibit 2 –
       “C band EIRP Spectral Density.”

     The value N described in 25.221(a)(1)(i)(A) is 1. The detailed demonstration
     described in paragraph 25.221(b)(1)(i)(A) may be found at pages 3-4 and 7-12 of
     Exhibit 2 – “C band EIRP Spectral Density.” The detailed demonstration
     described in paragraph 25.221(b)(1)(i)(B) may be found at pages 6 and 15-17.
     The detailed demonstration described in paragraph 25.221(b)(1)(i)(C) may be
     found at pages 5 and 13-14. The certification stating that the tracking system
     meets the pointing and cessation of emission requirements of 25.221(b)(1)(iii) are
     contained in the Intellian declaration.

  (b) (2) Not Applicable.

  (b) (3) Not Applicable.

  (b) (4) Comply. See SES-4 and NSS-9 maps in the Operations Areas Exhibit.

  (b) (5) Comply. The U.S. based ESV Compliance Officer has authority and ability to
      cease all emissions from ESVs through teleports located in the U.S. and elsewhere
      used to uplink the ESVs. The ESV Compliance Officer is able to direct the
      Marlink Network Operations Center (MNOC) located in Eik, Norway to send
      commands via the uplink teleports which cause the remote ESVs to cease
      transmitting. The business address for the ESV Compliance Officer is 2600
     Tower Oaks Boulevard, Suite 210, Rockville, MD 20852 and this point of contact


Exhibit 1 – Application Narrative and Showing of Compliance
            With Sections 25.221 and 25.222
       is available 24 hours a day, seven days a week via 203-346-0461 which is the
       U.S. number for the MNOC

   (b) (6) Comply. See the Radiation Hazard Report Exhibits.



    Showing of Compliance for the Ku-band Operation of the v240M Antenna with
                       Part 25 of the Commission’s Rules

Section 25.222

   (a) (1) Comply.

       See the Intellian declaration and Exhibit 3 – “Ku band EIRP Spectral Density.”

       The antennas use transmitters that have off-axis EIRP spectral densities less than
       or equal to the levels in paragraph 25.221(a)(1)(i) and meet the requirements of
       25.222 (a)(1)(i)(A-C) with an N value of 1. Exhibit 3 provides the detailed
       demonstration described in paragraph 25.222 (b)(1). The declaration contains the
       certification that the antenna complies with the pointing requirement in paragraph
       25.222 (a)(1)(ii)(A) and the cessation of emission requirement in paragraph
       25.222 (a)(1)(iii)(A).

   (a) (2) Not Applicable

   (a) (3) Not Applicable

   (a) (4) Comply. The U.S. based ESV Compliance Officer has authority and ability to
       cease all emissions from ESVs through teleports located in the U.S. and elsewhere
       used to uplink the ESVs. The ESV Compliance Officer is able to direct the
       Marlink Network Operations Center (MNOC) located in Eik, Norway to send
       commands via the uplink teleports which cause the remote ESVs to cease
       transmitting. The business address for the ESV Compliance Officer is 2600
       Tower Oaks Boulevard, Suite 210, Rockville, MD 20852 and this point of contact
       is available 24 hours a day, seven days a week via 203-346-0461 which is the
       U.S. number for the MNOC.

   (a) (5) Comply. These records are being collected and maintained as specified.
       Requests to make this data available may be directed to the ESV Compliance
       Officer via 203-346-0461.

   (a) (6) Comply.

   (a) (7) Comply. The ESVs are controlled through teleports located in the United
       States and elsewhere used to uplink the ESVs. As noted in the (a) (4) response,


Exhibit 1 – Application Narrative and Showing of Compliance
            With Sections 25.221 and 25.222
     the ESV Compliance Officer that is located within the United States has the
     capability and authority to cause any of the ESVs to stop transmitting if necessary.

  (a) (8) Comply.

  (b) (1) Comply. The tables described in 25.222(b)(1)(i) are attached in Exhibit 3 -
       “Ku band EIRP Spectral Density.”

      The value N described in 25.222(a)(1)(i)(A) is 1. The detailed demonstration
      described in paragraph 25.222(b)(1)(i)(A) may be found at pages 3-4 and 7-12 of
      Exhibit 3 – “Ku band EIRP Spectral Density.” The detailed demonstration
      described in paragraph 25.222(b)(1)(i)(B) may be found at pages 6 and 15-17.
      The detailed demonstration described in paragraph 25.222(b)(1)(i)(C) may be
      found at pages 5 and 13-14. The certification stating that the tracking system
      meets the pointing and cessation of emission requirements of 25.222(b)(1)(iii) are
      contained in the Intellian declaration.
  .
  (b) (2) Not Applicable.

  (b) (3) Not Applicable.

  (b) (4) Comply. See Operations Areas Exhibit.

   (b) (5) Comply. The U.S. based ESV Compliance Officer has authority and ability to
      cease all emissions from ESVs through teleports located in the U.S. and elsewhere
      used to uplink the ESVs. The ESV Compliance Officer is able to direct the
      Marlink Network Operations Center (MNOC) located in Eik, Norway to send
      commands via the uplink teleports which cause the remote ESVs to cease
      transmitting. The business address for the ESV Compliance Officer is 2600
      Tower Oaks Boulevard, Suite 210, Rockville, MD 20852 and this point of contact
      is available 24 hours a day, seven days a week via 203-346-0461 which is the
      U.S. number for the MNOC.

  (b) (6) Comply. See the Radiation Hazard Report Exhibits.
      .
  (c) Comply. Coordination has been completed with NASA for ESV operations in the
      14.0 – 14.2 GHz frequency band within 125 km of NASA TDRSS facilities
      protected per 24.222 (c). The coordination has been filed with the Commission
      for completion of the coordination process. Until the coordination process is
      completed applicant will continue to comply with 25.222 (c) by not operating
      Ku-band ESVs at all in the 14.47 – 14.5 GHz frequency band within the specified
      distances of the protected facilities.

  (d) Comply. No ESVs are operated in the 14.47 – 14.5 GHz frequency band.



Document Created: 2015-08-16 17:33:19
Document Modified: 2015-08-16 17:33:19

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC