Attachment SESMFS2012061200507D

SESMFS2012061200507D

DECISION submitted by FCC

DISMISSAL LETTER

0000-00-00

This document pretains to SES-MFS-20120612-00507 for Modification w/ Foreign Satellite (earth station) on a Satellite Earth Station filing.

IBFS_SESMFS2012061200507_1004397

                             Federal Communications Commission
                                       Washington, D.C. 20554


                                                 July 16, 2013

                                                                                                 DA 13—1581

EchoStar Broadcasting Corporation
Ms. Alison Minea
100 Inverness Terrace East
Englewood, CO 80112




                                                        Call Sign: E980118
                                                        File No.:   SES—MFS—20120612—00507


Dear Ms. Minea:


On June 12, 2012, EchoStar Broadcasting Corporation (EBC) filed the above—captioned
application to modify its fixed earth station to add the DBSD G—1 (§$2651) space station
operating at the 92.85° orbital location as a point of communication. EBC‘s narrative
statement indicates this modification is required to allow EBC to provide telemetry,
tracking, and control for the DBSD G—1 space station using C—band frequencies for
limited emergency or contingency operations, should the need arise, and for periodic
reliability testing. We dismiss the application as defective without prejudice to re—filing.‘

Section 25.112(a)(1) of the Commission‘s rules, 47 C.F.R. § 25.112(a)(1), requires the
Commission to return, as unacceptable for filing, any earth station application that is not
substantially complete, that contains internal inconsistencies, or that does not
substantially comply with the Commission‘s rules. EBC application is not complete for
the reasons stated below.

    *      In response to item E18 of Schedule B, EBC indicates that a frequency
           coordination report is not required for its proposed modification to its C—band
           operations. However, Section 25.203(c) of the Commission‘s rules requires all
           earth station applicants to complete frequency coordination if the earth station
           will operate in frequency bands shared with terrestrial services on a co—primary
           basis such as in the 3700—4200MHz and 5925—6425 MHz bands. If EBC chooses
           to refile, it must include a frequency coordination report with its application.




I       If EchoStar Broadcasting Corporation re—files an application identical to the one dismissed, with the
exception of supplying the corrected information, it need not pay an application fee. See 47 C.E.R. §
1.1111(d).


                               Federal Communications Commission               DA 13—1581



       EBC did not complete items E28 through E60 of Schedule B to the FCC Form
       312 relating to the particulars of the proposed operations as required by section
       25.130 (a)(1) of the Commission‘s rules, 47 C.F.R. § 25.130(a)(1).

Accordingly, pursuant to Section 25.112(a)(1) of the Commission‘s rules, 47 C.F.R. §
25.112(a)(1), and Section 0.261(a)(4) of the Commission‘s rules on delegations of
authority, 47 C.F.R. § 0.261(a)(4), we dismiss the application of EchoStar Broadcasting
Corporation without prejudice to re—filing.




                                                  ‘Paul E. Blais
                                                   Chief, Systems Analysis Branch
                                                   Satellite Division
                                                   International Bureau




Ce: STEPTOE & JOHNSON LLP
    Pantelis Michalopoulos
    1330 Connecticut Ave, N.W.
    Washington, DC 20036

pmichalopoulos @steptoe.com



Document Created: 2013-07-17 14:48:08
Document Modified: 2013-07-17 14:48:08

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC