Attachment Exhibit C

This document pretains to SES-MFS-20110912-01065 for Modification w/ Foreign Satellite (earth station) on a Satellite Earth Station filing.

IBFS_SESMFS2011091201065_916383

                                                         EXHIBIT C
                                                         HNS License Sub, LLC
                                                         Modification of License Application
                                                         Response to Question 35
                                                         September 2011

  PETITION FOR PARTIAL WAIVER OF DATA SUBMISSION REQUIREMENT OF
                          SECTION 25.115(e)

       Pursuant to Sections 1.3 of the Commission’s rules, 47 C.F.R. § 1.3, HNS License Sub,

LLC (“Hughes”) respectfully requests a partial waiver of Section 25.115(e) of the Commission’s

Rules, 47 C.F.R. § 25.115(e), with respect to some of the information that is required to be

submitted with all applications for 20/30 GHz band fixed-satellite service (“FSS”) earth station

applications. This waiver is requested for the new 9.2m TT&C antennas that will be added to the

Call Sign E060382 and E060383 licenses, but is not required for the three new 1.8m beacon

uplink antennas that will be added to the Call Sign E060382 license.

       Hughes’ two proposed new 9.2m earth station antennas at Fillmore, California and Castle

Rock, Colorado (Call Signs E060383 and E060382, respectively) will be used to provide

telemetry, telecommand, and control (“TT&C”) functions for Hughes’ Jupiter 107W satellite that

is scheduled to be launched in 2012 to the 107.1° W.L. orbital location. Hughes seeks this

limited waiver in order to allow the processing and grant of authority for its new antennas prior

to the submission of certain data elements from Section 25.138 that are called for in Section

25.115(e) of the rules. The required data will not be available to Hughes until after the subject

earth stations are constructed and readied for operation. As explained more fully below, there is

good cause to waive this rule and doing so would not be inconsistent with Commission precedent

– in particular, because Hughes will supply the information required as soon as it is able to


generate the data.1 Grant of this request will serve the public interest by allowing the provision

of additional satellite broadband communication services in the United States without

undermining the purpose of the Commission’s rules.

        Section 25.115(e) of the Commission’s rules provides that an application to license an

individual earth station operating in the FSS in the 20/30 GHz bands shall be filed on FCC Form

312, Main Form and Schedule B, and shall include the information described in Section 25.138.

Section 25.138(a) specifies GSO FSS earth station antenna off-axis EIRP spectral density

requirements for transmissions in the 29.5-30 GHz band, while Section 25.138(d) specifies that a

series of measured antenna radiation patterns are to be provided for the purpose of determining

compliance with the off-axis EIRP density levels in Section 25.138(a). Similar data for the

receive band is called for in Section 25.138(e). The requirements of Sections 25.138(a), (d), and

(e) are aimed at ensuring that an earth station transmitting to a satellite in the geostationary arc

does not cause excessive interference to neighboring satellites.

        As discussed in more detail below, Hughes is seeking a partial and limited waiver of the

obligation to provide with these TT&C earth station applications the information called for in

Sections 25.138(d) and (e) of the Commission’s rules, and instead to allow Hughes to provide

the required data in connection with its post-grant certification of earth station construction

pursuant to Section 25.133(b) of the Commission’s rules, 47 C.F.R. § 25.133(b), on the basis

that:

        •    the earth station that is the subject of this application has not been built yet, and the

1
 The Commission previously granted a similar waiver request. See Satellite Communications Services
Information Re: Actions Taken, Report No. SES-00748, File No. SES-AMD-20050901-01203 (Sept. 14, 2005)
(Public Notice) (granting DirecTV a waiver of Section 25.138 information requirements). Moreover, when it
granted the initial applications under Call Signs E060382 and E060383 for the TT&C earth station antennas for
operation with Hughes’s SPACEWAY 3 satellite, it granted waivers identical to those requested here. See, e.g.,
License for Call Sign E060382 at Condition 253.



                                                        2


           specific new model of antenna specified for the two locations has not previously been
           field deployed (meaning that the measured data required by Section 25.138(d) of the FCC
           rules is not available;

           • the proposed antennas are not “production” antennas in the mass-production,
           ubiquitous deployment of small terminal sense of the word. Instead, the two 9.2 m
           antennas proposed in the applications for which waivers are sought are non-consumer
           TT&C antennas that should be subjected to a different level of scrutiny than potentially
           problematic small antennas targeted for ubiquitous deployment to commercial and
           consumer users;

           • Hughes will provide currently-unavailable data per the specifications in Sections
            25.138(d) and (e) of the FCC’s rules after the antenna is built in connection with its
           required certification under Section 25.133(b) of the Commission’s rules.

           Section 25.138(d) specifies that an applicant shall provide, for each earth station antenna

type, a series of radiation patterns measured on a production antenna performed on a calibrated

antenna range and, as a minimum, shall be made at the bottom, middle, and top frequencies of

the 30 GHz band. The radiation patterns are:

                (1) Co-polarized patterns for each of two orthogonal senses of polarizations in two
                orthogonal planes of the antenna.

                          (i) In the azimuth plane, plus and minus 10 degrees and plus and minus 180
                          degrees.
                          (ii) In the elevation plane, zero to 30 degrees.

                (2) Cross-polarization patterns in the E- and H-planes, plus and minus 10 degrees.

                (3) Main beam gain.2

Section 25.138(e) imposes similar information requirements for the 20 GHz band receiving earth

station antenna.3

                By virtue of Section 25.115(e) of the Commission’s rules, Hughes is obliged to

submit, as part of its applications for any Ka-band earth station, measured antenna patterns from

2
    See 47 C.F.R. § 25.138(d).
3
    See id. at § 25.138(e).




                                                      3


a production antenna of the type it proposes to deploy. This requirement causes a dilemma that

has precipitated the instant limited waiver request. The 9.2m TT&C antenna that is the subject

of this instant license application has not been built yet; is not truly a “production” antenna; and

measured data for this new GDSATCOM antenna model is not yet available.

           Although Hughes seeks a waiver of the requirement to provide unavailable data with its

application – and submits that it is not reasonable for Hughes to have to build the two new

antennas at its own risk under special temporary authority without any assurance that it will

ultimately be licensed to operate the stations – Hughes does provide other detailed information

here in order to show that the protection of adjacent satellites will be ensured. Specifically,

Hughes provides the RF specifications for this antenna as provided by the manufacturer. (See

Annexes 1 to this Exhibit C.) This submission strongly suggests that the antenna performance

will comply with the requirements of Section 25.209 of the Commission’s rules.

           Under the Commission’s rules and associated decisions, a waiver of the Commission’s

rules is warranted when “good cause” is shown.4 A waiver may be granted if the grant “would

not undermine the policy objective of the rule in question and would otherwise serve the public

interest.”5

           Hughes’ requests for a partial waiver of Section 25.115(e) with respect to some of the

information called for in Section 25.138 satisfies these criteria. As explained above, the required

measurements of the Ka-band antennas that are the subject of the modification applications are

not feasible because the antennas in question have not been built.



4
    47 C.F.R. § 1.3. See also WAIT Radio v. FCC, 418 F.2d 1153, 1157 (D.C. Cir. 1969).
5
 EchoStar KuX Corp. Application for Authority to Construct, Launch and Operate a Geostationary Satellite
Using the Extended Ku-band Frequencies in the Fixed-Satellite Service at the 83° W.L. Orbital Location, Order
and Authorization, 20 FCC Rcd 919, 923 (¶ 12) (2004) (Commission waiver for “good cause shown”).



                                                         4


           The purpose of the Section 25.115(e) is to ensure that FSS earth station operations in the

20/30 GHz frequency band do not subject neighboring satellite networks to harmful interference.

Hughes’ demonstration of compliance with FCC Rule 25.138(a) for the 9.2m antennas is

included as Exhibit B to the instant application. As such, interference to other GSO FSS

satellites will be within the levels permitted by the Commission’s rules, and GSO operations of

other satellite operators will not be subject to harmful interference. Additionally, Hughes stands

prepared to provide the additional data per the specifications in Sections 25.138(d) and (e) of the

Commission’s rules after the antennas are built.

           Furthermore, Section 25.138 was intended to address blanket licensing of ubiquitously

deployed production antennas. As correctly noted in another application for licensing of a fixed

transmit receive earth stations in the 30/20 GHz band, “the wide range of measurement

parameters specified in the rule was meant to account for the wide range of installation

possibilities for such mass marketed antennas, and for the fact that not every antenna would be

tested after installation.”6 In the instant case, only one TT&C antenna will be operated at any

given point in time with Jupiter 107W, while the other will be serving as backup. The beacon

antennas will be very carefully installed and tested – much more so than routine antennas of a

similar size used for communications services. The available antenna data points to the fact that

co-frequency FSS operations of adjacent satellites will not be subject to harmful interference.

Moreover, Hughes notes that the TT&C functions for Jupiter 107Wcan and will meet the levels

in Section 25.138(a) during all routine operations. To the extent that the Section 25.138(a) levels

may be exceeded by Hughes’s beacon uplink earth stations, such operations at levels in excess of

Section 25.138 will be coordinated with neighboring satellite operators.


6
    See supra n.1.



                                                    5


       Finally, grant of this waiver would be consistent with commission precedent, as the

antenna sidelobe performance is expected to be similar to that of other 9.2m Ka-band antennas

from the same manufacturer, and the Commission issued a waiver to Hughes for the TT&C

stations it uses successfully today with SPACEWAY 3.

       In short, Hughes’s request for a partial, limited waiver of the information requirements in

Section 25.115(e) in connection with its proposed TT&C and beacon earth stations for Jupiter

107W are fully consistent with the purposes of the underlying rule. Morevoer, grant of Hughes’s

waiver request will serve the public interest by expanding the range and quality of

communication services that are available in the United States.

       For the reasons stated herein, grant of Hughes’s waiver request will serve the public

interest without undermining the purpose of the Commission’s rules. Accordingly, and for good

cause shown, Hughes asks that the Commission grant this waiver request.




                                                6


       ANNEX 1: RF SPECIFICATION FOR ANTENNA (GDSATCOM 9.2m) 7




7
    As provided by GDSATCOM.


                                  7



Document Created: 2011-09-12 17:16:29
Document Modified: 2011-09-12 17:16:29

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC