Attachment SES-LIC-20180823-022

SES-LIC-20180823-022

DECISION submitted by FCC

Grant

0000-00-00

This document pretains to SES-LIC-20180823-02295 for License on a Satellite Earth Station filing.

IBFS_SESLIC2018082302295_1589231

                                                     UNITED STATES OF AMERICA
                                                FEDERAL COMMUNICATIONS COMMISSION

                                               RADIO STATION AUTHORIZATION
Name: Westar Satellite Services LP                                                                         Call Sign: E020322
Authorization Type: License                                                                            File Number:
Non Common Carrier                             Grant date:        10/17/2018       Expiration Date:     10/17/2033




Nature of Service: fixed Satellite Service

Class of Station: Fixed Earth Stations

A) Site Location(s)
                                                                                                              Elevation           Special Provisions
# SiteID                                Address                             Latitude      Longitude            (Meters)      NAD (Refer to Section H)

1) 1                    777 Westar Lane                                 32°34 ‘42. 0”N    96°58 ‘56. 0”W         207.6        83
                        Cedar Hill, Dallas,               TX 75104


                        Licensee certifies antenna(s)                   comply with gain patterns specified in Section 25.209




Subject to the provisions of the Communications Act of 1934, The Comniunications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
below for radio communications for the term beginning October 17, 2018 (3 AM Eastern Standard Time,,) and ending October
17, 2033 (3 AM Eastern Standard Time). The required date of completion of construction and commencement of operation is
October 17, 2019 (3 AM Eastern Standard Time) Grantee must file with the Commission a cert/ication upon completion of
                                                                   .




construction and commencement of operation.


B) Particulars of Operations
The General Provision 1010 applies to all receiving frequency bands.
The General Provision 1900 applies to all transmitting frequency bands.
for the text of these provisions, refer to Section H.
                                                                                Max    Max EIRP                         Special
                                                                                EIRP    Density                       Provisions
             Frequency                Polarization          Tx/Rx             /Carrier /Carrier Associated             (Refer to Modulation?
#              (MHz)                     Code      Emission Mode               (dBW) (dBW?4kHz) Antenna               Section H)  Services
1) 5925.0000—6425.0000                   H,V            36MOG1F        Tx      69.60       30.10      AC15                         TT&C / AM

2) 5925.0000—6425.0000                   H,V            36MOG1F        Tx      69.60       30.10      AC15                         Digital TV

3) 3700.0000—4200.0000                   H,V            36MOG1F        Rx                             AC15                         Digital TV



 C) Frequency Coordination Limits
                                                         Satellite Arc            Elevation           Azimuth      Max EIRP
                                                         (Deg. Long.)             (Degrees)           (Degrees)  Density toward
             Frequency Limits                            East      West         East     West       East    West    Horizon              Associated
 #                (MHz)                                 Limit     Limit        Limit    Limit      Limit    Limit (dBW?4kHz)             Antenna(s)

 1)      5925.0000—6425.0000                             40.5W—139.OW            19.5—31.3            109.6—239.1            —13      AC15
 2)      3700.0000—4200.0000                             40.5w—139.0w            19.5—31.3            109.6—239.1                     AC15



                                                                       (page 1 of4)                                                     FCC Form 488


                                                     UNITED STATES OF AMERICA
                                                FEDERAL COMMUNICATIONS COMMISSION

                                               RADIO STATION AUTHORIZATION
    Name: Westar Satellite Services LP                                                              Call Sign: E020322
    Authorization Type: License                                                                 File Number: SES-LIC-20180823-02295
    Non Common Carrier                         Grant date:    10/17/2018    Expiration Date:     10/17/2033




    B) Points of Communications
      The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

     1)1 to Permitted Space Station List

    E) Antenna Facilities
                                                                                                                                            Special
                                                                                                           Site            Max            Provisions
                                                Diameter                                                Elevation     Antenna Height       (Refer to
     Site                Antenna
                                                (meters)        Manufacturer         Model number       (Meters)         (Meters)         Section H)
     ID                    ID          Units
1                          AC15          1          6.1      Vertex Communications       C61RTRL        207.6       7.6 AGL/ 138.7 AMSL

         Max Gains(s):        49.7 dBi 9     6.0000 GHz      46.5 dBi 9                            4.0000 GHz
         Maximum total input power at antenna flange (Watts) =                                 500.00
         Maximum aggregate output EIRP for all carriers (UBW( =                                75. 62




    G) Antenna Structure marking and lighting requirements:
            None unless otherwise specified under Special and General Provisions


    H) Special and General Provisions
        A)This RADIO STATION AUTHORIZATION is granted subject to the following special provisions and general
          conditions:
             4    Licensee must ensure that a current listing of the name, title, mailing address, email address, and telephone
                   ---



                  number of the responsible point of contact are on file at the FCC. Any changes must be filed electronically in the
                  International Bureau filing System (IBfS) in the ‘Other Filings” tab within 10 days of the change.
               5   ---   Licensee must notify’ the Commission when this earth station is no longer operational or when it has not been used
                         to provide any service during any 6-month operation.

               6   ---   Licensee must comply with the license modification and notification requirements of 47 CFR      § 25.118 to change
                         the coordinates of its authorized earth station.

         90397     ---   Telemetry, tracking and command (TT&C) operations identified in part B, Particulars of Operation in this
                         authorization may be transmitted within the assigned bands that are not at a band edge only if the transmissions
                         cause no greater interference and require no greater protection from harmful interference than the
                         communications traffic on the satellite network or have been coordinated with operators of authorized
                         co-frequency space stations at orbital locations within six degrees of the assigned orbital location, frequencies,
                         polarization, and coding of telemetry, tracking, and command transmissions must be selected to minimize
                         interference into other satellite networks.
         90398     ---   Changes to previously authorized transmitting facilities, operations and devices regulated by the Commission that
                         may have significant environmental impact, and are not excluded by §1.1306, require the preparation of an
                         Environmental Assessment (EA) by the licensee. (See 47 C.F.R. §1.l307, 1.1308 and 1.1311)


                                                                  (page2of4)                                                FCC Form 48$


                                            UNITED STATES OF AMERICA
                                       FEDERAL COMMUNICATIONS COMMISSION

                                      RADIO STATION AUTHORIZATION

Name: Westar Satellite Services LP                                                       Call Sign: E020322
Authorization Type: License                                                          File Number: SES-LIC-20180823-02295
Non Common Carrier                    Grant date:   10/17/2018      Expiration Date:  10/17/2033




H) Special and General Provisions
   A)This RADIO STATION AUTHORIZATION is granted subject to the following special provisions and general
      conditions:
    90399     The licensee shall, at all times, take all necessary measures to ensure that operation of this (these) authorized
            ---




              earth station(s) does not create potential exposure of humans to radiofrequency radiation in excess of the FCC
              exposure limits defined in 47 CFR § 1.1307(b) and 1.1310. Physical measures must be taken to ensure
              compliance with limits for both occupational/controlled exposure and for general population/uncontrolled
              exposure, as defined in these rule sections. Compliance can be accomplished in most cases by appropriate
              restrictions, such as fencing. Requirements for restrictions can be determined by predictions based on
              calculations, modeling, or by field measurements. The FCC’s OFT Bulletin 65 (available on-line at
              www.fcc.gov/oet/rfsafety) provides information on predicting exposure levels and on methods for ensuring
              compliance, including the use of warning and alerting signs and protective equipment for workers.
    90470   ---   The application for this authorization was filed within the 180-day filing window for FSS earth stations operating
                  in the 3700-4200 MHz frequency band as of April 19, 2018, as established by Public Notice DA 18-398 (rel.
                  Apr. 19, 2018) and Public Notice DA-18-639 (rel. 2018-06-21).
   900407   ---   The Permitted Space Station List (Permitted List) is a list of all geostationary space stations providing
                  fixed-satellite service pursuant to a Commission license or grant of U.S. market access. The Permitted List
                  currently includes the following frequency bands per §25.103 and §25.1 15(k)(1):

                     3600-4200 MHz (space-to-Earth)
                     5850-6725 MHz (Earth-to-space)
                     10.95-11.2 GHz (space-to-Earth)
                     11.45-12.2 GHz (space-to-Earth)
                     13.75-14.5 GHz (Earth-to-space)
                     18.3-18.8 GHz (space-to-Earth)
                     19.7-20.2 GHz (space-to-Earth)
                     24.75-25.25 GHz (Earth-to-space)
                     28.35-28.6 GHz (Earth-to-space)
                     29.25-30.0 GHz (Earth-to-space).

                  Earth stations with “Permitted List” designated as a point of communication may access any space station on the
                  Permitted List, provided the operations comply with the applicable “routine” uplink and downlink limits, are
                  within the specific frequency bands authorized in the earth station license, have completed coordination with
                  terrestrial stations pursuant to §25.203, and otherwise comply with all terms and conditions of both the earth
                  station license and the space station grant.




                                                        (page 3 of4)                                                 FCC Form 488


                                          UNITED STATES OF AMERICA
                                     FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION
Name: Westar Satellite Services LP                                                      Call Sign: E020322
Authorization Type: License                                                         File Number: SES-LIC-20 180823-02295
Non Common Carrier                Grant date:    10/17/2018      Expiration Date:    10/17/2033




    B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:
              This authorization is issued on the grantee’s representation that the statements contained in the application are
              true and that the undertakings described will be carried out in good faith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
              Communications Act. 47 U.S.C. § 303(q).

              Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, company or corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission’s
              Rules. 47 C.F.R. Part 25.

              This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
              designated frequencies beyond the term of this license, nor in any other manner than authorized herein.

              This authorization is issued on the grantee’s representation that the station is in compliance with environmental
              requirements set forth in Section 1.1307 of the Commission’s Rules. 47 C.F.R. § 1.1307.

              This authorization is issued on the grantee’s representation that the station is in compliance with the Federal
              Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission’s Rules. 47 C.F.R.
              17.4.

              The following condition applies when this authorization permits construction of or modifies the construction
              permit of a radio station.

              This authorization shall be automatically forfeited if the station does not meet each required construction
              deadline by the required date of completion unless, before such date(s), a specific application is timely filed to
              request an extension of the construction deadline(s), supported with good cause why that failure to construct by
              the required date was due to factors not under control of the grantee.

              Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
              collect annual regulatory fees from regulatees is contained in Public Law 103-66, “The Omnibus Budget
              Reconciliation Act of 1993.” These regulatory fees, which are likely to change each fiscal year, are used
              to offset costs associated with the Commission’s enforcement, public service, international and policy and
              rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
              fee rates. Receive only earth stations are exempt from payment of regul




                                                      (page 4 of 4)                                                FCC Form 488



Document Created: 2019-05-02 03:06:22
Document Modified: 2019-05-02 03:06:22

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC