Attachment SESLIC2017080400861.

SESLIC2017080400861.

DECISION submitted by FCC

GRANT

0000-00-00

This document pretains to SES-LIC-20170804-00861 for License on a Satellite Earth Station filing.

IBFS_SESLIC2017080400861_1342148

                                                         UNITED STATES OF AMERICA
                                                    FEDERAL COMMUNICATIONS COMMISSION

                                                RADIO STATION AUTHORIZATION

    Name: Spire Global, Inc.                                                                                      Call Sign: E170171
    Authorization Type: License                                                                                 File Number: SES—LIC—20170804—00861
    Non Common Carrier                          Grant date:         11/27/2017           Expiration Date:        11/27/2032




Nature of Service: Earth Exploration Satellite Service
Nature of Service: Mobile Satellite Service
Nature of Service: Other

 Class of Station: Fixed Earth Stations

A) Site Location(s)
                                                                                                                      Elevation        Special Provisions
# Site ID                               Address                             Latitude            Longitude              (Meters)   NAD (Refer to Section H)

2) 4                     5821 Fairview Road                               35°9‘5.3"N           80°50‘29.6"W              203          83
                         Suite G12/18
                         Charlotte, NC 28209




Subject to the provisions of the Communications Act of 1934, The Communications Satellite Act of 1962, subsequent acts and
treaties, and all present and future regulations made by this Commission, and further subject to the conditions and
requirements set forth in this license, the grantee is authorized to construct, use and operate the radio facilities described
below for radio communications for the term beginning November 27, 2017 (3 AM Eastern Standard Time) and ending
November 27, 2032 (3 AM Eastern Standard Time) . The required date of completion of construction and commencement of
operation is November 27, 2018 (3 AM Eastern Standard Time) . Grantee mustfile with the Commission a certification upon
completion of construction and commencement ofoperation.


B) Particulars of Operations

The General Provision 1010 applies to all receiving frequency bands.
The General Provision 1900 applies to all transmitting frequency bands.
For the text of these provisions, refer to Section H.
                                                                               Max          Max EIRP                        Special
                                                                              EIRP           Density                      Provisions
            Frequency                 Polarization                  Tx/Rx    /Carrier         /Carrier      associated     (R&e" t9        Modulation/
#              (MHZ)                         Code        Emission   Mode      (dBW)        (dBW/4kHZ)       Antenna       Section H)        Services

1) 402.0000—403.0000                     R              15KOF1D      Tx       29.95             24.2500     1                          Digital/TT&C Uplink

2) 402.0000—403.0000                     R              15KOFID      Rx          0 .00         0 .00        1                          Digital/Data Downlink   and
                                                                                                                                       TT&C Downlink

3) 449.7500—450.2500                     R              15KOF1ID     Tx       33.25             27.55       2                          Digital/TT&C Uplink


4) 2020.0000—2025.0000                   R           SMOOD1W         Rx        0 .00            0 .00       3                          Digital/Data Downlink




                                                                     (page 1 of 4)                                                             FCC Form 488


                                                UNITED STATES OF AMERICA
                                           FEDERAL COMMUNICATIONS COMMISSION

                                          RADIO STATION AUTHORIZATION

 Name: Spire Global, Inc.                                                                              Call Sign: E170171
 Authorization Type: License                                                                      File Number: SES—LIC—20170804—00861
 Non Common Carrier —                     Grant date:    11/27/2017          Expiration Date:      11/27/2032




C) Frequency Coordination Limits

                                                 Satellite Arc              Elevation             Azimuth             Max EIRP
                          e                      (Deg. Long.)               (Degrees)          (Degrees) Density toward
              Frequency Limits                  East     West             East    West       East    West    Horizon                   Associated
#                  (MHz)                       Limit     Limit           Limit    Limit     Limit    Limit (dBW/4kHz)                  Antenna(s)
1)           402.0000—403.0000                        NGSO                10.0—10.0          000.0—360.0               25.7596    1
2)           449.7500—450.2500                        NGSo                10.0—10.0          000.0—360 .0             25.7596     2
3)          2020.0000—2025.0000                       NGSO                10.0—10.0          000.0—360.0                     0    3


D) Points of Communications
      The following stations located in the Satellite orbits consistent with Sections B and C of this Entry:

    1) 1 to LEMUR NGSO satellite system ($2946)


E) Antenna Facilities
                                                                                                                  .                                  Special
                                                                                                              Site                Max               Provisions
     Site          Antenna                 Diameter                                                         Elevation        Antenna Height         (Refer to
                     ID           Units    (meters)          Manufacturer               Model number        (Meters)             (Meters)           Section H)
                       1            1        1.85                   M2                    401CP14SG         203             63 AGL/ 266 AMSL

        Max Gains(s) :             11.5 dBi @           0.4025 GHz             11.5 dBi @           0.4025 GHz
        Maximum total input power at antenna flange (Watts) =                                   70 .00
        Maximum aggregate output EIRP for all carriers (dBW) =                                  29 .95




                      2            1         2 .46               TACO                       H—105           203             63 AGL/    266 AMSL

        Max Gains(s) :             14.8 dBi @           0.4500 GHz
        Maximum total input power at antenna flange (Watts) =                                70 .00
        Maximum aggregate output EIRP for all carriers (dBW) =                               33 .25




                      3            1          1.2            ARA;   Seavey                C1502;800         203             63 AGL/ 266 AMSL

        Max Gains(s) :            25.7 dBi @            2.0225 GHz
        Maximum total input power at antenna flange (Watts) =                                    .00
        Maximum aggregate output EIRP for all carriers (dBW) =                                   .00




                                                             ( page 2 of 4 )                                                          FCC Form 488


                                          UNITED STATES OF AMERICA
                                     FEDERAL COMMUNICATIONS COMMISSION

                                    RADIO STATION AUTHORIZATION

Name: Spire Global, Inc.                                                                 Call Sign: E170171
Authorization Type: License                                                           File Number: SES—LIC—20170804—00861
Non Common Carrier                  Grant date:     11/27/2017     Expiration Date:     11/27/2032




F) Remote Control Point:
1                1050 Walnut Street,      Suite 402                                             Call Sign: N/A

                 Boulder, Boulder, CO 80302
                 4153563400 x307


G) Antenna Structure marking and lighting requirements:
     None unless otherwise specified under Special and General Provisions


H) Special and General Provisions
    A)This RADIO STATION            AUTHORIZATION is granted subject to the following special provisions and general
      conditions:
         4 ——— Licensee must ensure that a current listing of the name, title, mailing address, email address, and telephone
               number of the responsible point of contact are on file at the FCC. Any changes must be filed electronically in the
              International Bureau Filing System (IBFS) in the "Other Filings" tab within 10 days of the change.
         5 ——— Licensee must notify the Commission when this earth station is no longer operational or when it has not been used
              to provide any service during any 6—month operation.

         6 ——— Licensee must comply with the license modification and notification requirements of 47 CFR § 25.118 to change
              the coordinates of its authorized earth station.

    90398 ——— Changes to previously authorized transmitting facilities, operations and devices regulated by the Commission that
              may have significant environmental impact, and are not excluded by §1.1306, require the preparation of an
              Environmental Assessment (EA) by the licensee. (See 47 C.F.R. §§1.1307, 1.1308 and 1.1311)
    90399 ——— The licensee shall, at all times, take all necessary measures to ensure that operation of this (these) authorized earth
              station(s) does not create potential exposure of humans to radiofrequency radiation in excess of the FCC exposure
              limits defined in 47 CFR §§ 1.1307(b) and 1.1310. Physical measures must be taken to ensure compliance with
              limits for both occupational/controlled exposure and for general population/uncontrolled exposure, as defined in
              these rule sections. Compliance can be accomplished in most cases by appropriate restrictions, such as fencing.
              Requirements for restrictions can be determined by predictions based on calculations, modeling, or by field
              measurements. The FCC‘s OET Bulletin 65 (available on—line at www.fec.gov/oset/rfsafety) provides information
              on predicting exposure levels and on methods for ensuring compliance, including the use of warning and alerting
              signs and protective equipment for workers.
    90440 ——— Earth station receive operations in the 2020 — 2025 MHz band are on a non—allocated and non—interference
              protected basis.




                                                      ( page 3 of 4 )                                               FCC Form 488


                                         UNITED STATES OF AMERICA
                                    FEDERAL COMMUNICATIONS COMMISSION

                                   RADIO STATION AUTHORIZATION

Name: Spire Global, Inc.                                                                  Call Sign: E170171
Authorization Type: License                                                             File Number: SES—LIC—20170804—00861
Non Common Carrier                 Grant date:   11/27/2017       Expiration Date:      11/27/2032




   B) This RADIO STATION AUTHORIZATION is granted subject to the additional conditions specified below:

              This authorization is issued on the grantee‘s representation that the statements contained in the application are
              true and that the undertakings described will be carried out in good faith.

              This authorization shall not be construed in any manner as a finding by the Commission on the question of
              marking or lighting of the antenna system should future conditions require. The grantee expressly agrees to
              install such marking or lighting as the Commission may require under the provisions of Section 303(q) of the
              Communications Act. 47 U.S.C. § 303(q).

              Neither this authorization nor the right granted by this authorization shall be assigned or otherwise transferred to
              any person, firm, company or corporation without the written consent of the Commission. This authorization is
              subject to the right of use or control by the government of the United States conferred by Section 706 of the
              Communications Act. 47 U.S.C. § 706. Operation of this station is governed by Part 25 of the Commission‘s
             Rules. 47 C.F.R. Part 25.

             This authorization shall not vest in the licensee any right to operate this station nor any right in the use of the
             designated frequencies beyond the term of this license, nor in any other manner than authorized herein.

             This authorization is issued on the grantee‘s representation that the station is in compliance with environmental
             requirements set forth in Section 1.1307 of the Commission‘s Rules. 47 C.F.R. § 1.1307.

             This authorization is issued on the grantee‘s representation that the station is in compliance with the Federal
             Aviation Administration (FAA) requirements as set forth in Section 17.4 of the Commission‘s Rules. 47 C.F.R.§
              17.4.

             The following condition applies when this authorization permits construction of or modifies the construction
             permit of a radio station.

             This authorization shall be automatically forfeited if the station does not meet each required construction
             deadline by the required date of completion unless, before such date(s), a specific application is timely filed to
             request an extension of the construction deadline(s), supported with good cause why that failure to construct by
             the required date was due to factors not under control of the grantee. ©

             Licensees are required to pay annual regulatory fees related to this authorization. The requirement to
             collect annual regulatory fees from regulatees is contained in Public Law 103—66, "The Omnibus Budget
             Reconciliation Act of 1993." These regulatory fees, which are likely to change each fiscal year, are used
             to offset costs associated with the Commission‘s enforcement, public service, international and policy and
             rulemaking activities. The Commission issues a Report and Order each year, setting the new regulatory
             fee rates. Receive only earth stations are exempt from payment of regulatory fees.




                                                    ( page 4 of 4)                                                FCC Form 488



Document Created: 2018-02-22 14:29:19
Document Modified: 2018-02-22 14:29:19

© 2024 FCC.report
This site is not affiliated with or endorsed by the FCC